Eddie Seyedi
*****.******@*****.***
***** ***** ****** ** *******, TX 77077, Tel: 832-***-****
Holding US Green Card and Social Security number ( US Permanent Resident, do not need
Sponsorship now or in the Future) open to relocate anywhere inside US
Summary
Highly motivated Senior Electric Power Engineer with master degree and 18 year
experience working with power transmission lines, power generation plants, substations
and petrochemical projects.
Power system studies and design including;
load flow study, short circuit calculation, relay protection setting, cable sizing calculation,
cable ladder/tray design, MV and LV (MCC/ PC) switchgears(single line and schematic
design/drawing), grounding grid design, lighting, lightning protection system. Familiar
with ETAP, SKM tools, relevant codes and standards such as ANSI, IEEE, NEC,
NEMA and NESC.
Experience
AF Industry AB, Senior Electrical Engineer
Nov. 2013 – Feb. 2015
KVV 8 Steam Power Generation project (1 x159 MVA)- Siemens, Stockholm, Sweden, to
perform study/calculation and writing report including:
• Load Flow Study
• Short circuit calculation
• Relay Protection coordination Plan (SIPROTEC5 Siemens relays)
• Cable sizing calculation
DolWin2 offshore wind farm project- ABB, Vasteras, Sweden, to perform study/calculation
and writing report including:
• Load Flow Study
• Short circuit calculation
• Relay Protection coordination Plan(ABB and Siprotec Siemens relays)
• Cable sizing calculation
STRI AB, Sep. 2009 – Nov. 2013
Power Systems Analyst
GECOL, Power Quality Analyze, Libya
Page 2 of 5
• Power quality Analyze for 5 measuring points at different substation in Libya, preparing report
including, harmonic analyze, voltage flicker, active and reactive power variations, frequency
fluctuation.
DNV, Oslo, Norway
• Writing the Recommended practice (RP) (Qualification Procedures for Offshore HVDC
Technologies)
SvK (Swedish TSO)
• Analyze the behavior of 4 stages Sensitive Earth fault Protection during the occurrence of
Geomagnetically Induced Current (GIC) and writing the final report
SvK (Swedish TSO)
• Analyze the ability of Shunt Capacitors Banks tolerance against The DC current induced by GIC
phenomenon
VindForsk (Wind Energy Research Organization) -Sweden
• Analyze, study and investigation the ability to utilize of ‘Synthetic Inertia’ from large Wind
Farms in controlling power frequency during big power loss in the grid with GE wind turbine
model in PSS/E
ABB Substation, Amliden Wind Farm project, Sweden
• Insulation Coordination study, including calculation of Transient and temporary over voltages
due to lightning and switching phenomena and design of Surge Arresters-PSCAD/EMTDC
• Calculation and design of Grounding grid for wind farm- Cyme
ABB Substation, Nada Wind farm, Sweden
• Insulation Coordination study, Transient and temporary over voltages due to lightning and
switching phenomena and selection the technical information and location of Surge Arresters-
PSCAD/EMTDC
Fingrid, Helsinki, Finland
• Reliability and unavailability calculation for new HV substation(230kV, 400kV)-NEPLAN
ENSTOE, Gothenburg, Sweden
• Evaluation of ENESTOE common requirements for wind parks projects among EU countries
SvK, Swedish TSO, Stockholm, Sweden
• Frequency scanning, harmonic analysis of HV and EHV (132, 230 and 400kV)network in
Sweden by Simpow and PSS/E
Midroc Company, Gothenburg, Sweden
• Load flow study, short circuit calculation, voltage drop calculation and selecting the power
transformer owing to limit the three phase short circuit to a desired value
Forsmark Nuclear Power plant, Stockholm, Sweden
• Load flow, short circuit calculation, dynamic and transient study and analyze of over voltages in
the network following by fault clearing with several different scenarios and investigation of over
Page 3 of 5
voltage, under voltage and loss of synchronous (power slip) protection reaction- PSS/E,
SimPow ( 132, 230 and 400 kV network)
ESKOM, HVDC Study for the Cape Strengthening for 2012 Grid, South Africa
• Load flow, short circuit, voltage stability and sub-synchronous resonance generated by
frequency converters of new HVDC line for 2012 power plan, by Simpow and PSS/E (230, 400
and 735 kV)
Mahabad Petrochemical Project, Sep.2005- Sep.2007
Steam and Power Manager
• Feasibility study of the project
• Plot plan design including analyze and study the best location for process plant, waste water,
cooling system, power generation and steam plant, gas reduction station and etc.
• Site mobilization and temporary power receiving design for construction works
• Evaluation of Bids for power generation plants ( 4 x 10 MV Gas Turbines) offers from different
vendors
MAPNA, Electrical engineer Dec. 2000 – Sep. 2005
Sahand Thermal Power Generation Plant, Iran,
Tehran, EPC project
Design and calculation
• Calculation and design the grounding grid according to IEEE80 for substation(132/230 kV)
and main block area (Boiler, Turbine and transformer areas), Water t reatment plant,
M ain Cooling System
• Load Flow study, short circuit calculation, relay setting coordination for several
p lants and swithchgears
• Cable sizing calculation and cable trench/rack, cable tray/ladder design for water
treatment, main cooling system, Auxiliary boiler, administration buildings,
• Design of lightning protection according to NFPA 780 for main plant,
substation(132/230kV) area and main cooling towers
• Design of Single line diagram, Logical Diagram and Schematic (wiring) diagram for MCC,
MV (6 and 6.6 kV) and HV(132/230kV) Switchgears for Main Block, Main Cooling
System, Water Treatment plant, Savage treatment, administration building and gathering
hall and Substation (230/132kV)
• Design of lighting system for main cooling systems, water treatment, auxiliary boiler, side
office, administration building, warehouse and work shop.
• Design and design review of relay protection systems for generator, exciter, MV
electromotor, transformers including ABB, GE, Schneider, SEL relays
Page 4 of 5
• Substation physical layout and electrical clearances(132/230kV);
• Substation rigid and strain bus design; CB, DS, ES, SA, bus system configuration
• Substation ground grid design, calculation of step and touch voltage, voltage gradient and
etc;
• Substation surge and direct stroke protection( Lightning and Switching Protection);
• Substation raceway design ( Cable trench, raceway and equipment position plan);
Construction
• Provide erection completion certificate forms (ECC) for subcontractors
• Supervisory and control the installation and erection process for different electrical
equipment/systems including grounding, cable tray/ladder, MCC/PC/MV panels, LV and
MV electromotor, transformers, lighting and lightning, cable pulling, IPB, Generator/exciter,
control and relay protection panels
Commissioning
• Provide test forms (TF) for commissioning subcontractors
• Supervisory and control the pre-commissioning, test and commissioning of electrical
equipment/systems including MCC/PC/MV panels, LV and MV (wire/Telephone check),
electromotor, generator and exciter system, transformers, CT, PT, Surge arresters, CB, DS,
relay protection (distance, differential, overcurrent, etc.) in substation by Omicron/Megger
test devices, Cable test( insulation and high pot for MV cables (6,6 kV ends/joints)
MOTOGEN, Electrical Engineer
Sep. 1998 - Sep. 2000
• Design of winding and core dimension for Induction electromotor including three phase and
single phase electromotors,
• Improvement the electrical and mechanical characteristic of induration motors according to the
client requirements and IEC standard
Fars Industries AB, Sep. 1997 - Sep. 1998
Electrical Shift Engineer
• Doing daily repair and maintenance works for electrical equipment including power
transformers, LV/MV electromotors (400V, 6kV and 11kV), electrical heater tracing,MCC/PC
panels, MV Switchgears, Relay and control protection, Alarm and mimic window panels, DC and
UPS and battery systems in different plants like side offices, Nitrogen, waste water, water
treatment, Olefin, PE, Polystyrene, PP and steam power generation plants
Education
Page 5 of 5
• Master in Electrical Power Engineering, Chalmers University of Technology, Gothenburg,
Sweden, June.2009
• BSc in electrical Power Engineering, Iran University of Science and Technology, Tehran,
Iran, June. 1995
Publication
• Fault-ride through capability of DFIG wind turbine built-in GE model in PSS/E 31.
Computer Skills
• Microsoft Office,MATLAB/SIMULINK, PSS/E,PSCAD_EMTDC, SIMPOW, NEPLAN,
CYME, AutoCad, Power Factory (DigSILENT), elMASTER, E3 series,FebDok,ETAP,SKM
Language skills
• English Fluent
• Swedish Proficient