Mike Vasilescu
**** ********* ***, ****** ** ****1
Cell: 559-***-**** - acp4q6@r.postjobfree.com
Summary
Results driven management career with more than 15 years of professional experience in planning, developing and
implementing projects from concept to final implementation. Champion organization cultural change, a Continuous
Improvement leader implementing Lean Manufacturing principles through Toyota Way tools (FMDS, 5S, SOP's, Kaizen,
Root Cause Analysis, JIT, Production control, FMEA, and Inventory control). Driven to excellence in Food Safety, GMP's
our team achieved an NSF audit score of 99%. Continuously maintaining an uncompromised focus on high quality
standards, driven from core based principles acquired as Board member for the BRC preparation team.
Skills
Cost Control Continuous Improvement
Food Safety, GMP's Lean Manufacturing
FMEA Toyota Way
Quality Assurance Project Cycle
Accomplishments
Lead our team at KDR Plato Pet Treats to an NSF increase from 97% to 99%.
Reduced KDR Plato Pet Treats, Finished Goods inventory by 65%, ingredients, fiber and bags by 47%.
Designed Paramount Farms Kernel Pistachio Plant to reduce hand sorting costs by 75%, while doubling capacity.
Aflatoxin Detection US Patent # US 201********.
Experience
Plant Manger
March 2014 to Current
KDR Plato Pet treats - Fresno, CA
Oversight of all plant operations including production, packaging, quality control and shipping areas
Manage, train and develop department managers in all plant areas
Work to improve production and packaging efficiencies while coordinating efficient use of labor
Interface with CEO on regular basis to address the steps needed to further drive the business.
Increased the plant's overall capacity by 80%, without any capital expenditure
Aligned third party Salmonella testing with FDA's new Food Modernization Act, while reducing product rework
Cost reduction: Eliminated over 90 days Finish Goods inventory, moving production to a JIT system, reduced
Finish Goods Inventory by 65%, Dry Ingredients, Fiber and Bags by 45%
New product development: Lead the production and R&D teams from concept to launch new product line of "Small
Bites"
Coordinated Export Compliance to Canada, EU, and Asia
Worked with Marketing and Sales teams to expand the existing "Thinker" product line for new marketing sales
concept, and to extend revenue for "Samples" distribution
Manage planned and unplanned Capital Projects
Implemented of new trays CIP technology
Manage California Air Board Permitting and inspection compliance for Boiler, Ovens and Compressed air
systems
Achieved an NSF Audit score increase from 97% to 99% for 2015
Evaluated and upgraded Sanitation program centered around our swab testing program
Continuous Improvement: Implemented Toyota Way Systems methodology, through FMDS, Root Cause Analysis,
5S, Kaizen events
Changed maintenance strategy from reactive to proactive TPM
Project Manager / Maintenance Quality Systems Manager / Harvest Technical Leader
March 2008 to March 2014
Paramount Farms LLC (Wonderful Pistachios & Almonds) - Lost Hills, CA
Built Quality Systems Maintenance group from ground up, leading to OEE improvements in Pistachio
Pre-processing from mid-65% to 90%, and Almonds from 70% to 95%, and reducing overall rework from 5% to
0.09% (an estimated 15 M USD annual savings)
Kernel Plant process designer – Increased capacity by 100%, decreased hand sorting labor by 75% using a
novel approach to sequential processing method (Total Project Cost 14.8 M USD)
Design pasteurization processes for almonds to increase throughput from 22,000 lbs/hr to 35,000 lbs/hr,
maintaining the same pasteurization level
Maximized Pistachio Rotary Roasting Process to increase throughput by 180 %, and obtained a Pasteurization
level higher than Log 4 kill rate
Directed third party Thermal Process Validation for all roasters, ovens, and pasteurizers
Maintained equipment, annul calibrations, and documentation for all Thermal Processes Validation compliance
Pistachio Harvest Technical Group Leader for CY 2010, operating at 100% capacity for 58 days with 98%
efficiency
Maintenance Centered Production transformation Team Lead
Maintained power distribution system, comprised of 2 interlocking distribution lines 21KV and 12 KV with 17
Substations 2,500 - 5,000KVA. Total point of use at a maximum load of 35 MW. Purchased power from PG&E
distribution line at 69 KV, and a secondary system at 12KV with main step-down 69KV/21KV Substation of 24 MW
Verified Electric plant coordination studies conducted in ETAP
Plant wide Grounding analysis, followed by CAP X Grounding project to eliminate all stray voltages for equipment
and structures
Ensure Vendor compliance with Company policies and GMP's
Founder of “Deep Clean” concept – a fundamental cultural change leading to “Maintenance Centered
Production”
PDCA Trainer - Toyota Way Quality Management Practices for troubleshooting and problem solving using
PDCA techniques (Lean Manufacturing Principles, TPM, 8 ways of waste, Kaizen, 5S etc.)
Re-designed in-shell almond production flow resulting in a production cost reduction from 3.2 c/lbs to 1.6 c/lbs
Reliability team leader for FEMA and Maintenance Strategy (Move from “Run to Failure” to “Design of
Experiment” mode of operation)
BRC Preparation Board Member assigned to Plant wide CCP's compliance
Aflatoxin Detection –US Patent # US 201********
HACCP Board Member and process evaluator
Re-designed production flow for GMP's compliance, increase productivity, and ease of sanitation for HACCP
validation
New product development compliance and Strategic Management of technology advisor; evaluate existing and
new technology, and determine vendor support capability in accordance to Toyota Principles
Implemented Battery charging station with charging and conditioning program, for 138 electric forklifts
OEM integrator and re-designer for Packaging Machine, Roasters and Sorting Equipment
Equipment Maintenance hands on experience with: PPO chamber with Vacuum system and flare, Potable and
Process water production and distribution 700K gallons storage with 100k gallons per hour plant, packaging
systems, Magnusson peelers, conveyors, Water Cooling towers, Air Handling systems up to 200 HP, HVAC and
Ammonia cooling systems, Bed and Rotary Ovens, Compressors up to 150 HP and compressed air
distribution systems, Scalping and Gravity decks, and MCC and control systems.
R&D Manager / Contract Engineer
May 2006 to April 2008
BLI Inc. - Santa Clara, CA
Promoted from contract systems and design engineer to R&D manager to develop, organize and
align departmental strategy with company's Vision
Define project scope and aided CEO with individual contracts evaluation
Reviewed NDA's on a project basis for bilateral protection
Based on customer's specifications defined NRE project costing, timeline and deliverables
Designed Switching Power Supplies through implementation of high efficiency DC-DC converters with Power
Factor (pf above 0.95), and low THD
Designed testing methods for burn test evaluations with predominance in analog circuits and applications
Circuit design test bench evaluation against LT software models
Process customers change requests and re-evaluate initial project scope, cost and timeline
Managed engineering and technical resources for projects timely delivery and within budgets
Controls Engineer
September 2005 to February 2007
FMC Technologies - Madera, CA
Software Validation and FDA Compliance
Prepared Software Validation Package
Project manager for electrical group for ABRS (Automated Batch Retort System) projects, design control
cabinets and field devices. Implement motor starters, VFD's, Pressure, Temperature and Level sensors, with
required alarm feedback, under 4-20 mA control loops.
Design and validate Pressurized Sterilizer Software C++ and PLC, HMI, Device Net, Control systems (AB)
Processed Software Change Requests
Start-up and implementation of sterilization and pasteurization equipment
On site customer operating training
Low pressure vessel controls
Heat exchanger temperature/pressure control liquid pasteurization
Implementation of latest equipment safety systems,“Safety at Work” safety systems integration with existing
platforms(IFM)
Short Circuit and Fault analysis
Documented BOL and As built for Cabinet UL certification
Built AutoCAD schematics for power and controls circuits
Documented BOL and cabinet layout for Customer's manual
Reviewed Equipment Operating Manuals, and Technical documentation
Teacher Assistant
August 2004 to May 2006
CSU Fresno - Fresno, CA
Teaching Circuits Lab (ECE 90L)
Responsible for recitation and grading of Circuits One / Two classes
Intern Technical Professional
August 2000 to August 2003
Halliburton Energy Services - Houston, TX
Designed oven control systems with multiple backup protections for increased reliability
Down Hole tool support, EWR, Gamma, and TM
Customer technical support- custom fitting tool strings
PCB design based on component obsolescence for low frequency, 500 KHz up to 2.0 MHz
Increased production output, through training and testing system optimization
Teaching and training troubleshooting techniques to production technical staff
Designed troubleshooting techniques for EWR receivers
Implemented ESD preventive techniques at production line
High temp soldering, and high voltage PCB degradation evaluation
Vendor compliance for increased production yields
Re-designed EWR production and testing flow
Parts obsolescence control and technology evaluation
Manufacturing engineering technical support
New product implementation leader for the manufacturing engineering group
Sub-zero, and high temperature, boards oven testing
RF high gain (115 dB) dual stage amplification front end design and validation
Test rack grounding design to eliminate switching grounding noise
Ground loops analysis and field detection
Research Assistant
August 1999 to July 2000
University Of Houston - Houston, TX
Aided in research for high temperature superconductors
Structural analysis for Uranium doped YY123
Research for replacement of U235 with various nano-particles
Developed statistical distribution models for heavy atomic dopers
LPG/LNG and Chemical Marine Inspector
January 1992 to July 1997
SGS Inc. - Deer Park, TX
Loss Control - following API standards for calculations
Quality control for contaminated chemicals and LPG (high sulfur propane), LPG/LNG Copper Corrosion field
testing
US Coast Guard cargo loading compliance
Loading/Unloading Chemicals and LPG/LNG
On board Vessel Conditioning representativeLPG/LNG of LPG (Propane, Propylene, Ethylene, Butane VCM and
Ammonia, setup procedure for transition between cargoes going trough natural atmosphere (going from Gas to
Nitrogen to Atmospheric than cleaning and back to Nitrogen and than to LPG/LNG)
Commission of vessel and shore cooling plant for indirect cooling systems (compressor based) and direct
cooling systems (heat exchangers)
Commissioned Baytank USA Propylene Storage tanks, and designed sampling station
Ran mobile dry GC unit
Sampling, wall wash and verification of proper cleaning procedures
Level based Contamination sampling and investigation
Dew point measurement of Nitrogen blanketed chemicals
Shore Tank Farm, pipeline setup verification of theoretical drawing and control room configuration
Pipeline packing for integrity testing
Marine Inspector
September 1989 to January 1992
Chem Coast Inc. - La Porte City, TX
Chemicals Loading/Unloading
Butane barge Loading/Unloading
US Coastguard loading compliance
Lubrizol Loading Lead Inspector, following Lubrizol's strict loading guidelines
Tanks Visual inspection
Verification of Tank Cleaning Procedures for cargo compliance
Education and Training
Master of Science : Industrial Management
CSU Fresno - Fresno, CA
Industrial Management focus on management of technology, with emphasis on international business
(Combination of 50% MBA and 50% Industrial Technology)
Completed all coursework for MS in Electrical Engineering, with specialization in Power generation and
distribution, and Advanced Controls Systems
Research study - Evaluation of efficiency and true put for an Windmill Plant incorporating Vertical and Horizontal
Windmill generators of various sizes
3.97 Overall GPA for the two combined majors
Bachelor of Science : Electrical Engineering
CSU Fresno - Fresno, CA
Culminating Experience in Electronics, Electric Machines and Electromagnetic Waves
Minor in Mathematics, and Biochemistry
Associate of Applied Science : Aeronautical Engineering
Aeronautical School of Engineering Bucharest - Bucharest, Romania
Area of Specialization - Jet Engines with hands on experience on Turmo IV engines
Final Project - Jet Engine Exhaust Design of a Subsonic After Burner System