Post Job Free

Resume

Sign in

Senior Well Completion Engineer

Location:
Kuala Lumpur, Federal Territory of Kuala Lumpur, Malaysia
Posted:
June 06, 2015

Contact this candidate

Resume:

CURRICULUM VITAE

(Senior Well Completion Engineer)

Mr. Pham Anh Dung

Senior Well Completion Engineer (11 years’ experience- Expat position)

Petronas Carigali, EOR Center (Shell & PETRONAS Collaboration)

Kuala Lumpur – Malaysia

Nationality : Vietnam

DOB : 06 July, 1979

Married status : Married, 01 children

Home address:

Apartment no: # 32-2

Menara Avenue

No.189 Jalan Tun Razak

50400 Kuala Lumpur, Malaysia

Tel: +601*-***-**** (Primary - Malaysia)

+84-903-***-*** (Optional – Vietnam)

Email : acp2zx@r.postjobfree.com

1. EDUCATION:

- 2003-July 2004 : Master of Science in Reservoir Engineering- Ukraine National Technical Oil and Gas

University.

- 1998-2003: Bachelor in Reservoir Engineering - Ukraine National Technical Oil and Gas University.

- 1997-1998: Polytechnic University Hanoi-Vietnam.

2. COMPANY I HAVE WORKED

Jan, 2014 – Current

-

- Senior Well Completion Engineer, EOR Center, Petronas Carigali & Shell, Malaysia. Front End

Engineering Department.

May, 2010 – Jan, 2014 CuuLong Joint Operating Company (JOC of Conoco Philips /PVN/KNOC/ SK

-

Energy/ Geopetrol/ Perenco)

- Senior Well Operation Engineer (Completion, Intervention &Testing) – Operation Department

- Oct, 2004- May, 2010: JVPC (Japan-Vietnam Petroleum Company)

- Petroleum Engineer (2004-2009)

- Senior Petroleum Engineer (2009-May, 2010)

3. EXPERIENCE & ACHIEVEMENT (11 years):

3.1 ACHIEVEMENT

+ In charge 17ea wells completion design for Bokor Phase 3B EOR& infill project, 07ea wells completion

for Betty EOR & Infill. Initiative to implement Low Cost well completion design for Bokor 3B/ BETTY

campaign. Prepare well review and well completion planning with OH SAS technology

+ Lead completion including well design phase and offshore supervisor to deploy for more than 65 wells

completion (Miocene/ Basement), Including SAS sand control (up to 600m 6.5/8” Screen, high deviated

well 88deg), selective acidizing stimulation. (Offshore blog 15.2 – Rang Dong Field – JVPC Company and

Offshore blog 15.1 – Su Tu Vang, Su Tu Den NE/SW – CLJOC Company )

+ In charge for E-11P Sand clean out by Coiled Tubing in un-man platform. Lead MPLT by CTU for E-

08P/S-02P

+ In charge for many slickline/ Wireline well intervention jobs: MPLT/ Well survey/ Gaslift trouble shooting

and installation/ SSD open/close/ Tubing pack-off for temporary GLV/ Wax removal

+ In charge for 03 well DST: Phuong Dong 3X/ Duong Dong 1X DST (JVPC), STN 3X/ STN 4X DST

(CLJOC)

+ Lead completion for 03 wells HPHT Gas / Condensate (Temp 175 degC/ Pressure 9,500psi) with TCP

Oriented perforation/ Wireline perforation and Hydraulic Fracturing)

3.2 EXPERIENCE

A) Well Completion, DST and Stimulation:

+ Low cost well conceptual design for BDO and North Sabah, Offshore Enhance Oil Recovery project. (Sand

control selection including SAS for multizone selectivity, IGP (MZ Express with Shunt tube technology,

ESTMZ)

+ Design and prepare Well Completion/ Workover/ Testing equipment for Miocene/ Oligocene/Basement

wells including selective completion design. Prepare Completion and Clean up program & planning.

+ Hydraulic Fracturing: Involve supporting and supervising offshore work during DST/ Fracturing and

running Completion. Monitor and check offshore work in order to ensure safe and smooth operation with

accurate data acquisition. Prepare, monitor and arrange to send offshore equipment, which according to

technical requirement and working plan.

+ Gaslift Design/ trouble shooting using PIPE SIM/ Well Flow (Block 15.1 STV, STN, STD fields, Block

15.2 Rang Dong). Expert in PIPE SIM

+ Very experience in SAS sand control execution.

+ In charge for services provider KPI monitoring

B) SuTu Trang HPHT Well Completion and Multi-Hydraulic fracturing

+ PIC for pumping stimulation tender, including Multiple fracturing, CTU, N2 and Acidizing.

+ Involve in Well Completion Tendering process and evaluation Team.

+ Tubing/ Completion equipment material selection. Tubing design. Experience on WellCat and WellPlan

+ Ordering equipment to meet drilling schedule,

+ Make program for HPHT Completion/ Make planning and prepare equipment

C) Well Intervention and production enhancement

Heavy Well intervention:

+ Sand Clean out by Coiled Tubing.

+ Production Logging by Coiled Tubing; Well C-02P Wax removal

Simple Well intervention and production enhancement:

+ BHPs/ PRD Logging/ Slickline/ wireline/ Coiled Tubing perforation/ Tubing pack-off & design.

+ Gaslift arrangement/ installation/ Downhole Monitoring system/ maintenance.

+ Tracer injection and monitoring/ Cutting tubing (offline)

+ Troubleshoot gaslifting

D) Onshore design and support:

+ Prepare material for workshop/ program

+ Software experience:

- PIPE SIM simulation –Expert on Gaslift design and trouble shooting

- Well Plan – Expert on T&D Analysis

- Well Cat – Expert on tubing movement analysis, for new production/ DST/ Frac string design.

- P1 well cost – Expert on well cost estimation/ budget planning.

- Well flow- gaslift design

+ Support offshore team

+ Prepare Well Completion report

E) Offshore lead:

+ Supervisor and lead service completion team

+ Supervisor on well intervention activities (Slickline/ CTU/Wireline)

+ Prepare working program/ plan and detail procedures.

F) Engineering study:

Low cost well concept design for EOR offshore project (PCSB & Shell – Malaysia)

+

+ Selective injector for Low Miocene well.

+ Water Shut off using thru tubing expandable cement bridge plug.

+ Sand control for Oligocene/ Miocene well

+ Frac string/ testing string design using Well Cat

G) Engineering Workshop

+ Sand production workshop with PVI & JOGMEC (Ha Noi Jan, 2010):

- Standalone Sand screen Completion – Design and Execution for Rang Dong Low Miocene

Wells

+ Engineering workshops with PetroVietnam and Partners for getting approval on well completion designs

for Block 15.2 (Rang Dong, JVPC) and 15.1 (Cuu Long JOC)

H) Procurement

+ Master in Tendering process for Completion & Stimulation Service. (Well completion equipment &

service; Hydraulic Fracturing, Acidizing, Coiled Tubing and N2 lifting).

+ Budget program preparation (AFE / WPB). Prepare for OCM/ MCM

+ PIC from technical side in contract preparation

+ Equipment control & procurement.

+ Experience in MAXIMO (procurement and equipment control)

I) Other discipline

+ Good knowledge in Reservoir Engineering, Drilling, Production and Geologist.

+ Team work/ Communication Skill/ Negotiation skill/ interpersonal skill

J) Computer and Languages

Computer:

+ Oil and gas software: PIPESIM; Well flows, WellCat (Tubing design) and WellPlan

+ Skill full in Microsoft Excel, Words, Power point.

+ IT base-knowledge

Languages:

Vietnamese: native;

English: excellent;

Russian: excellent;

Ukraine: excellent

4. TRAININGS:

+ Sep, 2005: Well Test Analysis. Organizers: PT SEA, Kuala Lumpur- Malaysia

+ May, 2006: Basic Reservoir Engineering. Organizer: PetroSkills, Kuala Lumpur- Malaysia

+ May, 2006: Microsoft Excel 2003 Customized Skills. TD&T IT School, HCM Vietnam

+ June, 2006: Microsoft PowerPoint 2003 Customized Skills. TD&T IT School, HCM Vietnam

+ December, 2006: Business Writing Skill. Organizers: ILA Vietnam

+ March, 2007: Basic AID Course. Organizers: PVMTC Vietnam

+ June, 2007: International Commercial Contracts: Technical, Legal Aspects- How to prevent and

solve arising disputes. Organizers: FTU Vietnam

Gaslift design and Optimization – WeatherFord, Vung Tau VN

+ June, 2007:

Production Engineering – Well completions, Formation Damage and Stimulation.

+ July, 2007:

Organizers: HOT Engineering-Vienna, Austria

Surface Wellhead & Mudline System – VETCOGRAY

+ March, 2008:

Effective Interpersonal Skills – Ace Management Services

+ April 2008:

+ Nov 2008: BJ Cementing, Acidizing and Coiled Tubing Seminar, Vungtau, Vietnam

+ December 2008: Production Technology Engineering and Operations – NEXT, CHIBA, Japan

+ February, 2009: Introduction to Drilling Fluid and Environmental Solutions - MI SWACO Vung Tau

Permit to work training – level 2 – CuuLong JOC Vung Tau

+ June, 2010:

+ June, 2011 Well Cat Simulation software - Halliburton, HCMC

Reservoir and Field Management – PetroVietnam University, HCMC

+ Sep, 2011:

Acidizing and Other Chemical Treatment – ConocoPhylips International Human

+ Sep, 2011

Resources Development Corporation

+ Sep, 2011 Basic Completion Design and Practices - ConocoPhylips International Human

Resources Development Corporation

+ Sep, 2011 Completion Equipment - ConocoPhylips International Human Resources

Development Corporation

+ Sep, 2011 Perforating - ConocoPhylips International Human Resources Development

Corporation

+ Oct, 2011 Drilling Fluid and the Circulating System - ConocoPhylips International Human

Resources Development Corporation

+ Jan, 2012 Hydraulic Fracturing - ConocoPhylips International Human Resources Development

Corporation

+ March, 2012 Artificial Lift Method - ConocoPhylips International Human Resources

Development Corporation

+ March, 2012 Sand Control - ConocoPhylips International Human Resources Development

Corporation

+ Apr, 2012 DrillingStem Testing - ConocoPhylips International Human Resources Development

Corporation

+ Apr, 2012 Formation Evaluation - ConocoPhylips International Human Resources

Development Corporation

+ Apr, 2012 Gas Well Testing - ConocoPhylips International Human Resources Development

Corporation

+ Apr, 2012 Horizontal Wells Completion and Evaluation - ConocoPhylips International Human

Resources Development Corporation

+ Apr, 2012 Oil Well Testing - ConocoPhylips International Human Resources Development

Corporation

+ May, 2012 Wireline Production Operations - ConocoPhylips International Human Resources

Development Corporation

+ Wellheads, Flow control equipment and flow lines - ConocoPhylips International Human Resources

Development Corporation

+ June, 2012 WellPlan and WellCat – Halliburton

+ Aug, 2012 Advanced Production Data Analysis and Nodal Analysis – NEXT

+ Jan, 2013 Hydraulic Fracturing Stimulation – NSI Stim Plan - Indonesia



Contact this candidate