Post Job Free
Sign in

Manager Engineer

Location:
Batangas, CALABARZON, Philippines
Posted:
June 04, 2015

Contact this candidate

Resume:

Block ** Lot Villa Palao Subdivision, Barangay Banlic

Calamba City, Laguna 4027, Philippines

+639*********

acp15r@r.postjobfree.com; acp15r@r.postjobfree.com

MARLON A. RUIZ

OBJECTIVE

To Apply for any position that will commensurate to my qualifications and work experience as QA/QC Engineer for 1 year to present, HSE manager/Senior Safety Engineer for 8 years on LNG/Petrochemical plant, Project Manager/Engineer in the field of constructions specifically Civil, Structural and Electro mechanical works for 8 years, 11 years on manufacturing and maintenance of facilities like HVAC, Waste Treatment Facilities(Bio-chemical process), 2-years on HVSG/transformers commissioning and generators on THPAL mining in Mindanao, black start generator and turbine units. 5 years as Accredited POLLUTION CONTROL ENGINEER by DENR,LLDA for waste treatment facilities and sewage discharge, 2 years as design engineer for vertical and horizontal constructions on structural, piping an mechanical works

PROFESSIONAL ACHIEVEMENTS

QUALITY ASSURANCE & QUALITY CONTROL

Responsible for the implementations and control of all site based Quality Assurance and Quality control matters associated with specific projects specifically on Foundations pile driving projects, In site inspections and test plan(ITP), Project Quality Plan(PQP)

HEALTH SAFETY AND ENVIRONMENT

LNG/GAS Construction Safety Practitioner in the field of Mechanical and erection process, OET off- site projects and Tie in pipe projects, Heavy lifting works for pipes and structural load and lay out underground piping and horizontal downstream process.

Fabrication shop Safety Practices conforming to ASME Code Section IX and ASME B33-1 Process Piping

Can initiate Risk and Hazard Assessment Programs and Procedures during audit and certification works

HAZOP Knowledgeable on waste and environment programs

Can work on Non Destructive Testing Safety, Radioactive Protection Safety audit and procedures and practices.

Knowledgeable in the field of Safety General Instructions for ARAMCO projects and Instructions

HORIZONTAL AND VERTICAL CONSTRUCTIONS

PROJECT/CONSTRUCTION MANAGER in the field of Electro/Mechanical Works Construction Projects for Manufacturing and Electronic and Industrial Constructions Projects.

Waste Water Treatment Facilities Projects maintenance and operations

Can functions and interpolate Design and estimate works as well as hands on knowledge on Auto Desk designworks

Consultant and Management Project Engineer in the Construction Project Management Firm

OPERATIONS AND MAINTENANCE FOR

HVAC and Equipment Maintenance Engineer on manufacturing

Plastic Manufacturing Facility Engineer for In line injections, and extrusion Machines Toshiba Brand and CNC machines

Biological Waste Water Facility Maintenance Engineer combine Biological and Chemical Treatment Process.

Aluminium Die-casting Machine Maintenance and Safety Supervisor

Facility Engineer on Power Plant 2 Megawatts Bunker Operated Diesel NIAGATA and DETROIT 2-Cycle 5000KVA Diesel Operated Gen-set Units SEMICONDUCTORS MANUFACTURING

SKILLS

OSHA ACCREDITED NO. 11-600******-DATED APRIL1,2010 ACQUIRED FROM BECHTEL INTERNATIONAL

OSH PRACTITIONER-CONSTRUCTIONS/MANUFACTURING NO1033-100517-1577-December, 2013 TO December 16, 2016

NCR II CERTIFIED SCAFFOLD ERECTORS-TESDA

WORK HISTORY

QA/QC ENGINEER, BAUER FOUNDATION PHIL. INC

February 17, 20 15 to Present

Duties and Responsibilities

SUMMARY:

Responsible for the overall implementations of Project Quality System for the 5.5 kilometer NLEX segment 10 by Leighton Contractor (Asia) Inc. under the management of SMEC INTERNATIONAL PTY LTD (SMEC) and MANILA TOLLWAY CORP.(MNTC)

On site quality assurance and control of types of foundations engineering projects from rebar cages assembly, drilling and Bored Pile activities

Assist Project Manager in the preparations and executions of quality control plan(QCP), Inspections and Test Plan(ITP’s) to meet client specified standard

Ensure all project team are kept updated on Project Quality Procedures, distributed and understood and implemented in accordance with specified standard and applications.

Advise and educate the project personnel on various QA/QC aspects and ensure compliance in accordance to Project Quality procedures and Plans

Review and monitor QA/QC activities of sub-contractor, ensuring that all system requirement and operational monitoring are recorded and kept

To coordinated and carry out, receiving, inspections, in progress final inspections and performance test of materials/equipment to meet specific requirement

To detect any non-conformance and or defects and proposed corrective/preventive actions and record to ensure lesson learn are recorded for future reference.

To report to QA/QC Manager all activities related to non conformance are resolved and recorded

To maintain Project Quality Record or Project Conformance record file and prepare this for hand over to client

To do other deities as assign by the Project manager and QA/QC Manager

SENIOR SAFETY ENGINEER, LEIGHTON CONSTRUCTION PHIL INC

September 11, 2013 to December 23, 2014

Duties and Responsibilities:

SUMMARY:

Integrates safety issues and requirements into proposals, planning documents, government documents, design specifications and criteria, construction plans and schedules, bid specifications, and subcontract packages for projects. Has technical responsibility for interpreting complex requirements, evaluating and applying appropriate safety engineering principles, and formulating scopes of work, plans, and methodologies suitable for achieving and maintaining compliance with safety requirements. Provides technical assistance to other safety professionals assigned to projects and other project functions.

JOB DIMENSIONS:

A. Supervision Received

Receives technical and administrative supervision from the Manager of Safety Services, Safety Services Manager, Principal Safety Specialist/Engineer, or supervisory-level Senior Safety Specialist/Engineer. If assigned full-time on a project, receives supervision and work assignments from the Project Safety Services Supervisor, Project ES&H Manager, Project Manager, or Construction Manager.

B. Supervision Exercised

May directly supervise other safety specialists/engineers and provide technical oversight and direction to industrial hygiene subcontractors.

C. Contacts

Maintains relationships with internal organizations (e.g., engineering, construction, and subcontracts), customer, and contractor/subcontractor representatives to coordinate technical/scientific issues, new technologies, and integration of safety functional responsibilities into project proposals, design specifications, construction plans and schedules, and subcontractor bid packages.

Maintains contact, as appropriate, with government regulatory and resource agencies to obtain current information on new regulations, program initiatives, and technical requirements and standards.

Maintains contact with other safety personnel to keep them informed of changing requirements and to provide technical assistance as needed.

Maintains contact with customers to exchange information on safety issues, technical advances, and new technologies.

ESSENTIAL JOB DUTIES:

1.Provides input on bid decisions, proposal development, and estimates (scope, constraints, schedules, budgets) with respect to integration and compliance with safety requirements.

2.Provides technical support to safety studies, health assessment studies, and project risk assessments.

3.Coordinates appropriate consideration of safety requirements with subcontracts, engineering, and construction personnel as assigned.

4.Provides safety technical support and assistance to projects and coordinates safety requirements and formulation of risk reduction measures with project-assigned safety personnel, engineering, construction and onsite ES&H representatives during construction.

5.Participates in meetings with customers, project team members, and contractors/subcontractors to advise them of safety requirements that may affect project design, schedule, and cost.

6.Drafts comprehensive ES&H plans, project specific risk reduction plans, safety awareness training programs, and technical reports.

7.Provides recommendations and input for revising safety procedures, work processes, and other quality improvement measures.

8.Conducts safety inspections/assessments of project construction activities to monitor compliance with applicable safety and health requirements including contractual commitments, permits, and the project’s ES&H plan.

9.When in supervisory role, implements personnel policies (e.g., conducts employee performance evaluations) and provides technical direction to staff.

HSE MANAGER, ATS-SDP CONSTRUCTION INTERNATIONAL

August 21, 2011 to June 17, 2013

Duties and Responsibilities:

In-charge of the over-all management of the HSE procedures and implementation of Client HSE procedures at the mining project site.

Work closely with JGC-Chiyoda Joint venture clients on programs related to project risk management of safety, health and environment, corporate audit and other procedures required by the major client. In charge of the the company safety development including incident and accident reporting system,submittal of report and including monthly summary report presentation to client on workers behavior on safety, incident and near-miss reports, evaluation of safety indicators of the project team.

Attend necessary meeting which are required by the client and direct control over-all management of safety engineers in the site

Directly report to ATS Project Site Manage all activities related to safety and health on the basis of improving safety standard on the project, like methodology works, safety acquisitions of the standard to be adopted on the site project

SENIOR SAFETY ENGINEER, BECHTEL INTERNATIONAL, ANGOLA LNG ANGOLA SOUTH AFRICA

June 8,2009 to June 3, 2011

Duties and Responsibilities:

Integrates safety issues and requirement into proposals, planning documents, government documents, design specifications and criteria, constructions plans and schedules, bid specifications and sub-contract packages for projects.

Performs daily oversight of BNI direct constructions and sub-contractor activities to ensure proper implementations of project ES&H procedures, process, acceptable work practices and correctives actions. Advises management of nonconformance and stop works in imminent danger situations, assist with job planning through work control and hazard analysis/mitigations processes and in preparing specific reports as required in accordance with programs requirements which includes those associated with accident/incident investigations

Accompany regulatory compliance officers/inspectors during project audits to provide technical/operational support to compliance with project procedures and applicable standards, perform IH monitoring e.g. Noise monitoring, light surveys, etc.. And support other functions in the resolutions of issues for assign topics. Additional responsibilities may include assisting with classroom training and facilitations

HSE Manager, NAMKWANG INTERNATIONAL E&C

October 12, 2008 to January 12, 2009

In charge of the over- all implementations of the Consortium HSE Policies and procedures developing and improving safety plan and maintaining Incident Injury Free work place.

Review and implement policies to improve HSE programs focus on Safety Values, health and environmental. Facilitate as necessary the training of mid- management level to enhance safety culture and improve workers behavior to safety.

Systematically present issues during consortium coordinated meetings concerning safety and health issues. Present and respond to activities relative to work procedural methodology and assessed Risk and Hazard to identify and control.

Report monthly Safety report to the Consortium HSE Manager and Project manager of NAMKWANG.

Regularly attend to Daily meetings and monthly meetings of Client and Contractors meeting to address safety Issues.

HSE Manager, ALSAAD CONTRACTING, QATAR UAE

June 18, 2008 to September 12, 2008

Responsible for the preparation, implementation, maintenance, verification and documentations of the HSE plans, programs and procedures for the QATALUM activities

Ensure that all HSE activities are in accordance with the contract HSE Policy and Rules.

Develop, evaluate and revised safety policies, programs, and procedures to ensure a safe working environment

Complete a detailed Risk Assessment for each major task in accordance with scope of work.

Plan, conduct and supervise internal HSE review/audits to ensure that jobsite hazard are assessed and the risks minimized through application of the safety requirement

Develop, implement and evaluate a comprehensive training programs for all levels of employees

Prepare an inspections program and register of HSE related equipment and devises in accordance with the contract.

Enforcement of HSE Policies and procedures including the authority to stop the work in cases of imminent danger or flagrant violations of rule.

Review and revise HSE programs and procedures to ensure compliance with local regulations

Develop and implement an incentive and enforcement program to ensure employee compliance with project and company rules.

Ensure that all incidents are properly investigated including Safety Engineers, safety officers and labor.

Reports directly to the Project manager and for policy matters to corporate HSE Manager.

SAFETY ENGINEER, DAEWOO E&C. Sakhalin islandPrigorodnoye, RussianRepublic

May 2, 2007 to March 1, 2008

Designated as Safety and Site Engineer overseeing Safety and Health on LNG processing Train area in the construction and commissioning works, as well as Fabrication and Erection process, and underground piping for downstream process. Involved on heavy lifting and rigging works activities.

Conduct necessary training orientation of new comer as well re-training of all workers concerning training on site safety rules and regulations. Report all necessary activities of safety activity on daily, weekly and monthly reports to the Assistant and HSE Manager.

Make Work Hazard Analysis, Job hazard assessment, Task work detailing and control base on existing company work method statement. Documents all incident/accident report s for monthly reporting and discussion during General Contractors Weekly Safety scoring meeting.

Attend to all General meeting of all safety like weekly, internal and external meetings. Make minutes of the meeting taken and submit this to HSE Manager for checking and approval.

Documents all Safety and Health documents for general audit and inspection as necessary.

Conducts tool box meeting and reports directly to the HSE Manager.

Assist Client on Safety Hazard Audit, Safety Plan Program and other Risk Management program with regards to Health and Safety and Environment.

MECHANICAL ENGINEER, POLLUTION CONTROL OFFICER, UNIDEN PHIL. INC.

July 2005 to January 2007

Plans, develops and initiate accident prevention program of the company.

Conducts periodic safety and health meeting as well as periodic safety audit and inspection.

Reviews/investigates accident reports and formulates corrective and preventive actions to prevent recurrence.

Coordinates, conducts safety training programs for the employees.

Attends to the requirements of the company in the construction and installation, monitoring and maintenance of pollution control facilities including the application and securing of necessary permits and renew thereof.

Monitors and ensures compliance to the conditioned/requirements of licenses/certificates issued by different government agencies.

Prepares and submits reportorial requirements of different government agencies involving health and safety, environment and operational facilities requirements.

Formulates and implements effective preventive maintenance programs of building equipment.

Coordinates/supports operational requirement of the plant.

Ensure compliance to the requirements of ISO 14001, SOPI, DOLE, PEZA, DENR, LLDA and other local government agencies.

In-charge of the over-all functions of mechanical/environment/health and safety section of Facilities Department.

Handle other matters pertaining to environmental concerns.

Supervise the operational and maintenance of all governing equipment and machineries.

Prepare periodic reports to management related to performance and accomplishment.

Conducts staff periodic performance appraisal.

Performs other functions that maybe assigned.

FACILITY HEAD, CREATIVE DIECAST PHILIPPINES

May 2004 to May 2005

Directly managed the over-all facility and machine maintenance of all plant operation including power generation of 1MW Mini-power plant, Stand –by Generator 500KVA-1set, 150KVA-1set, Water Treatment plant-65 cubic meter capacity, High voltage Switch gears down to Main Distribution Pane, Automatic Transfer System, HVAC and Cooling Tower Process line, Compressed Airline and Utility water line.

Plan and directly manage three craft mainly Machine maintenance, Facility maintenance, and Building maintenance. Responsible for the over-all Plan preventive maintenance, Cost center for its operation and budget approval including parts inventory, machine utilization, Downtime operation costing, machine production output.

Responsible for the implementation of Document for Government Permit like Pollution Control, DENR permit, Air pollution and other local government requirement.

Presently involve on the implementation of ISO 9001documentation for the maintenance and facility operation.

Directly report to the Plant Operation Manager

PROJECT MANAGER, MANZOKU CONSTRUCTIONS AND TECHNICAL SERVICES

February 2001 to February 2004

Directly managed the over-all implementation of project for mechanical works such as piping works, Chilled water line piping works, HVAC, cooling tower lines. Structural steel works for vertical and horizontal works and other fabrication works including electrical and civil works.

Directly managed the designed of projects through Auto-CAD designed works, planning and implementation and conducts costing by way of quantity material-take off, BOQ, estimate and other necessary works for project costing based on client approved plans.

Conduct site works management planning, projects scheduling and comparison as to its status, update reports of project accomplishment and billing works for submission to management and client approval.

Conducts inspection of work based on approved plan and specification. Makes engineering changes for additional works as submitted by contractor, supplier and other related works

Directly reports to the management level by way of daily meeting including submittal of final works, project status and s- curve evaluation.

Do other works related to the position as a Manager.

PLANT ENGINEERING SECTION HEAD, SAGARA METRO PLASTICS PHILIPPINES

May 1990 to January 2001

Supervision on the maintenance of all production equipment such as TOSHIBA INJECTION MACHINES, EXTRUSION MACHINES, CHILLER and other auxiliary equipment

Maintenance of all plant equipment such as centrifugal pump(30 & 20 Hp), air compressor MITSUI SEIKI brand screw type ( 30 & 20 Hp) for centralized compressed air line, chiller unit REIKEN Brand 20 tons capacity, DETROIT Brand 16V two cycle diesel operated generator sets 1000 KVA capacity 2-units, Cooling tower-2 units 150 tons capacity and centralized air-conditioning split type.

Evaluates results of maintenance done on a monthly, quarterly and annually basis including plant man-power, man-hour machine utilization by way of SPC (Statistical Process Control) through review for continuous development and decide what has to be done to control such variation

Directly supervised three division mainly ELECTRICAL, MECHANICAL AND BUILDING MAINTENANCE crew composing of three supervisor and lead men from each division including hands on maintenance of line machines Toshiba injection 30 to 350 tons capacity robots take-out devises hopper dryers chiller and other production machines.

Directly managed three shift Electrician on the day to day basis monitoring of Utility Power line with a rated capacity of 34.5KVA, 1000KVA transformer, utility power board VCB breakers for sub-station, High voltage switch gears load bank capacitors and other power line. Directly managed building maintenance crew on day to day basis such as construction, housekeeping works, fabrication of jigs to support production requirement and other assigned projects such as plant expansion and building construction

Conducts project forecasting, scheduling, material costing and quantity take-off for plant expansion program, equipment set-ups management deliberation direct over-seer for its implementation such as supplier and contractor choice and recommend this to the Factory manager.

Presently a team member of the ISO 9002 and QS 9000 certification body doing application of PROCESS CONTROL for maintenance of Production equipment and statistical process control for all SAGARA PLASTIC PRODUCT FOR THE BIG THREE Namely General Motors, Chrysler, and Ford Corporation.

Report directly to the Factory manager and other Japanese staff concerning Plant operation, maintenance production downtime and other works as required.

DESIGN AND PROJECT ENGINEER, KALAYAAN CONSTRUCTION PLANNING AND MANAGEMENT INC.

1989 TO 1990

Design of Mechanical works such as piping lay-out, structural erection vertical and horizontal fire alarm control accessories, pump and control compressed air line system HVAC and other construction projects from commercial to industrial.

Conducts material quantity take-off based on propose industrial plan and implement plan as required on site and delegate the project to the contractor assign at the site. Act as over-seer of the owner for full implementation of the project involved.

Handled least Four contractor at project site namely; RIBCO, CCT-TOYO CONSTRUCTION, FLOW TECH on the following projects EMI warehouse at Imus Cavite, YAZAKI TORRES MANUFACTURING CORP, SGARA METRO PLASTIC INDUSTRIAL CORP., Mold Factory and Warehouse expansion.

Report directly to the project manager and occasionally to the Owner all project status, accomplishment report and progress billing submitted by contractor.

Finished Projects and was absorbed by the owner.

MAINTENANCE ENGINEER, LATEX CITY INC.

1988 TO 1989

Maintenance of ball mill equipment, extruder machine, HVAC equipment and Hydraulic press machines

Handles Fabrication works and machine shop works, compressed air-line, tool and die, molds repair and other related projects eg: Surgical gloves production, rubber products and plastic parts as required by our client.

Conducts maintenance works and other preventive measures for all production machines and ensure that all production machines are in good working operation

Reports directly to the Plant Manager regarding Plant operation

Resigned due to Labor dispute and plant closure

HVAC ENGINEER, ALR REFRIGERATION INC., 1984 to 1988

Design and installation of commercially air-conditioning package type unit.

Repair works for water cooled industrial chiller and other related ACU unit

Conduct estimate material costing as per design plan on projects concerning ventilation, blower and ducting works

EDUCATION

BACHELOR OF SCIENCE IN MECHANICAL ENGINEERING, UNIVERSITY OF NUEVA CACERES, 1983

STRUCTURAL AND ERECTION- CONSTRUCTIONS MANPOWER DEVELOPMENT of THE PHILIIPINESS- GRADUATE-1998

HVAC AND ELECTRICAL- CONSTRUCTIONS MANPOWER DEVELOPMENT of THE PHILIIPINESS- GRADUATE-1997

SEMINARS:

SEMINARS ATTENDED:

TJCP SAFETY TRAINING In MINING CONSTRUCTIONS-August 2011- July 2013

BECHTEL UNIVERSITY ON-LINE TRAINING-July 2009 to June 2011

LNG Confine space Training Course-Daewoo E & C-March 2, 2007

100 % tie off-Daewoo E & E- March 2, 2007

OSHA- SEIC/Daewoo-July 30, 2007

PTW procedures-Daewoo E & C – July 25, 2007

Toshiba machines maintenance-1995 Shangri-la Hotel

Supervisory Skill Seminar and Workshop-1996 five days in-house seminar, Sagara Metro Plastics

Supervisory Seminar & Workshop- by Management Forum Phil. 1995

Bldg. Maintenance and air-conditioning-By Maphil. 1997

Safety Organization of the Phil. Member 1996

Occupational Safety & Health-DOLE, Diliman, 1998

Statistical Process Control- by Mr. Edwin Spencer, Omnex USA

Heating, Ventilating & Air-conditioning Works- CMDF, DTI Cavite, 1998

Supervisory and Managerial Level Program: Ateneo de Manila 1998

Data Gathering, Analysis & Presentation-Vision Power 1998

Pollution control Officers Training course-PCAPI 1997

Philippine College of Occupational Medicine- 1999- 7 days

Laguna de bay trade fair & symposium-DENR 1999Worker

Workers Education Program- 1998

Injection machines Technical Seminar- by Toshiba Machine Hongkong ltd. 1998

Mitsui Seiki Air Compressor Seminar-by Mesco 1999

REFERENCES

Mr. Alvin Markle - ESH Manager –Bechtel International Angola LNG Project

Mr. Kelly Kieran ESH Tank Manager- Bechtel International Angola LNG project

Honorable ex- Mayor Sevirino J. Lajara- Calamba City, Province of LagunaAtty.

Samuel Samuela- City Fiscal Office, CalambaMunicpal Hall

[Title, Company]

PREPARED BY

MARLON A. RUIZ



Contact this candidate