Todd J. Van Noordt
**** ******** ***, ******, ** 24551 * 434-***-**** * ******@***.***
PROFESSIONAL SUMMARY:
Accomplished leader with proven ability to improve operational performance
and provide customer focus. Drive factory execution, build alliances,
manage change and implement initiatives that support organizational
effectiveness.
CORE COMPETENCIES:
. Manufacturing Operations . P & L Management . Lean Implementation .
Problem Solving . New Product Introduction . Supply Chain Management .
Process Improvement . Employee Empowerment . Sheet Metal Fabrication .
Assembly . Painting . Welding .
PROFESSIONAL EXPERIENCE:
Management Consultant / USC Forest, VA
Mar 2014 - Present
Project Manager / Implementation Specialist
Analyze business, execute Lean Principles & develop practical, value-driven
approaches for the supply chain that are designed to improve process flow,
throughput, efficiency and reduce inventory & cost.
. Utilize applied business solutions & systems for reducing inventory by
$543K
. Develop, train & implement preventative / scheduled maintenance
programs, thereby reducing downtime by 37%
. Execute re-balance of assembly line(s) to increase throughput by 23%
overall
. Reduced indirect labor by 19% and utilized those personnel into a direct
labor role
Diebold / Porters Lynchburg, VA
Sept. 2004- Mar 2014
Plant Manager
Jun. 2010 to Mar. 2014
Responsible for high tolerance business & industrial sheet metal product-
Managed staff of 12 - Manufacturing, materials, quality, engineering & HR.
Directed a Multi-shift operation of ~120 Sheet metal fabricators, paint &
assembly personnel - High & low volume mix environment.
. Oversee a 75K sq. ft. addition and coordinate the transfer of assembly
and powder coat equipment
. Implemented new business operating system during transition- Mie-Trak ERP
/ MRP Software
. Developed the Strategic, Capital Plan and manage the P & L of $6.1M
. Achieve Plant Metrics - Safety, OTD, PPM's, Efficiency, Kaizen, Inventory
Turns & Dollars
. Cost reductions of $194K thru kaizen, steel utilization and price
negotiations with suppliers
. Attained Plant Goal of $154K cost savings & avoidance thru Kaizen
Materials Manager Jun.2006 to Jun. 2010
Direct planning/scheduling, order entry, purchasing, inventory control and
shipping/receiving.
. Streamlined materials & shipping/receiving by reducing headcount from 7
to 4 personnel
. Cost savings in the purchase of mild steel of $109K/yr & using an
alternate approved supplier
. Increased inventory turns from 12.2 to 23.4 and reduced inventory from
$750K to $454K
. Cost savings in freight consolidation and packaging of $69K & $5K
respectively
. Achieved On-time-delivery (OTD) of 98.46%
. Maintain an operating budget in excess of $3.4M annually
Production Manager Sept. 2004 to Jun 2006
Manage a multi-shift sheet metal fabrication operation and maintenance
department.
. Maintained an operating budget in excess of $1.3M/yr
. Developed the manufacturing capital expenditure plan and provide
critical input for the Strategic Plan
. Implemented cost savings in excess of $250K thru kaizen activities
Todd J. Van Noordt
Page 2
U.S. Army (Active Duty) Pentagon, Washington, DC
Nov 2001 to Sept. 2004
Engineer Staff Officer
Prepared input for Daily Operations & Intelligence Briefings to the
Secretary of the Army and Army Staff on airfield repair, base camp
construction, power generation and Iraqi Infrastructure.
. Recalled to Active Duty at the Pentagon shortly after 9/11
. Coordinated engineer troop deployment and rotation into Iraq resulting
in 97% continuity
. Prepared analysis & proposed a "Stop Loss" initiative for the only power
generation unit in the U.S. Army, thereby maintaining 88% retention and
no degradation to the mission
. Top Secret Clearance Single Scope Background Clearance; granted Apr 29,
2004
Management Consultant Chesterfield, VA
Aug. 2001 to Nov. 2001
Project Manager
Facilitate the implementation of Lean Principles, process improvement &
cost reductions.
. Improved the process flow of two molding presses, allowing one operator
to run both, saving $35K /yr
. Reduced inventory by 11% by tracking usage and utilizing one piece flow
Maxxim Medical Richmond, VA
May 2001 to Aug. 2001
Operations Manager
Manage 5- supervisors, production control and ~300 direct reports in a
multi-shift custom surgical tray assembly operation producing +4800
different trays- Low volume/high mix.
. Reduced stock out situations from 23% to less than 7% and improved
efficiency by 6%
. Eliminated weekend shift and launched a third shift operation saving in
excess of $500K/mo
Johnson Controls, Inc. Suwanee, GA
Oct. 1999 to May 2001
Production Manager
Managed automotive seat assembly lines consisting of 125 unionized
employees.
. Utilizing Lean Manufacturing principles reduced direct labor from 66 to
55 saving $385K/yr
. Implemented packaging changes of side airbags, reducing shipping costs by
$250K/yr
. Reduced scrap from in excess of $450 to less than $145 a day, saving
$75K/yr
MILITARY: U.S. Army Officer (Active / Reserve)- Retired
Jan. 1981 to Sept. 2004
EDUCATION: Bachelor of Science, Business Administration, Norwich
University, Northfield, VT 1980
U.S. Army Engineer Officer Advanced Course,
1991
U.S. Army Ordnance Officer Advanced Course,
1993
PROFESSIONAL TRAINING & DEVELOPMENT:
Leader 2 Leader Training - 360feedback Six Sigma Overview
G & D Tolerance
Lean Manufacturing (2 wk)- Univ. Michigan Dale Carnegie- Public
Speaking Problem Solving