Trever Jones
**** ** ** *** *** s Bivins Texas **555
**************@*****.***
Journeyman Electri cian
Nine years experie nce as an elec tric ian; graduated from I.B.E.W on June 18 2012;
graduating on June 18th 2012; areas of experie nce include commerc ial, residential,
industrial and oil fiel d, including SCR house, generators skids, and converting diesel
to natural gas; strong background in technical and analytical skills, able to complete
tasks in a professional and timel y manner.
Work History
Ÿ Hic ks Electr ic 6/ 2007 - 6/2008
Electr ici an Apprentice
Provide technical assistance and resolution when elec tric al or engineeri ng problems are
encountered, before, during, and after construction.
Ÿ Camus Electr ic 6/2008 - 6/2009
Electr ici an Apprentice
Connect wires to circ uit breaker transformers, or other components
Ÿ Hmr Electr ic 6/2009 - 6/2010
Electr ici an Apprentice
Measure and wire and conduit, using measuring instruments and hand tools.
Ÿ Tri-State Electr ical 6/2010 - 12/2014
Head elec tric ian for building two cabinet factorie s, that consisted of ; main service
lines, hooking up machine, Control cabinets for dust elec tric al system. Fully
automated line for painting cabinets. The responsibility required constant work for
industrial buildings.
Fiel ded an average of 4 to 5 rig call s daily. The oil rig experie nce included but not
limi ted to ;
u Refabricating diesel power generator skids including lights and plugs to convert to
natural gas. Pipe in rigi d conduit everything explosive proof.
u Changing five pin throttle cables to a 3 pin connection, to hook up to a SCR house.
u Working on the 600 volt D.C. motors and that includes alteri ng the brushes and
holders.
u Revising 546 DLO cable, male and female pins and boots. Stoning the commutator if
needed. Including saw work A/B motor and mud pumps.
u Troubleshooting and changing motor on all mud tanks, desilter and desander,
charge pumps, mud mixers, the blower motor on jaw works and mud pumps,
agitators, transfer pumps with starter controls.
u Assembed total skid package extensions including 20/19/ 7/3 male and female end
terminated on both ends, top dog hosuse, drill console controls, 546 male and female,
building camp transformers from sizing all the wire, installed ACP and ADR'S.
u Completely constructed rig
Ÿ Camus Electr ic 12/2014 - 1/2015
Trace out short circ uits in wiring, using test meter.
SEEKING A FULFILLING POSITION IN T HE INDUSTRY T HAT
OFFERS GROWT H OPPORT UNT IES AND ALLOWS M E T O UT ILIZE
M Y LEADERSHIP SKILLS AND EXPERIENCE. M Y GOAL IS T O
EXECUT E T HE JOB AT HAND, BETT ERING M YSELF ALONG WIT H
T HE T EAM AND COMPANY.