Post Job Free
Sign in

Engineer Management

Location:
San Francisco, CA
Posted:
March 29, 2015

Contact this candidate

Resume:

Issam Belghazi

***** ***** ***** ***# ***

Rancho Cucamonga, CA 91730

813-***-****

********.*****@*****.***

Professional Profile:

Analytically-minded, performance-driven Engineer with experience in manufacturing

environment experience in successfully implementing innovative and cost effective designs

using continuous and 5S improvements. Superior problem-solving, time management and

leadership abilities. An excellent team player with superb communication and presentation

skills.

Education:

01/08-05/12 Bachelor of Science in Mechanical Engineering, University Of South Florida, Tampa, FL

Skills: Microsoft Office

SAP (Systems, Applications & Products in Data Processing)

QIS Projects (Quality Improvement Story Application)

Six Sigma Methodology

PRG Failure Analysis Application

Professional Experience:

08/14-Present Gerdau, Rancho Cucamonga, CA

Finishing End Routine Facilitator (Production Manager)

• Responsible for ensuring routine management efforts are followed and opportunities for

improvement in processes, products, and production within the area of responsibility are

identified

• Responsible for Implementing the Quality Management Airplane with the Operators

• leads Failure Analysis when significant problems occur and compare performance to

existing standards

• Controls the work flow within the area of responsibility, assist in minimizing

downtime/breakdowns and maximizing productivity, monitor performance, managing

routine processes, and training employees in routine management standards

• Facilitate training sessions for operators under a maintained training matrix on the

compliance standards, routine methodologies, tools, policies, practices, and processes

07/12-08/14 Gerdau, Rancho Cucamonga, CA

Rolling Mill Improvement Facilitator (Process Engineer)

• Drove the Rolling Mill Yield project which resulted in Cost savings of 1.4 million dollars

( 1% Yield Increase)

• Led a QIS project using the QIS methodology in reducing metallic losses at the Finishing

End with a team of operators. The project generated cost savings of $315,000.00

• Developed and coached employees on capabilities and knowledge in the application of the

QIS methodology and participated in QIS Projects.

• Identified and solved chronic/repetitive problems and failures as well as reduce process

variation.

• Helped build the Finishing End process analysis while engaging operators in order to build

all necessary standards and audits for the department

02/12-05/12 West Pharmaceutical, St. Petersburg, FL

Engineering Intern

• Worked with Manufacturing Engineers to ensure successful evaluation of all new

equipment process improvements.

08/10 -12/10 Mosaic, Mulberry, FL

08/09 -12/09 Maintenance and Reliability Engineer Co-Op

• Developed, implemented, and provided continuous improvement of Preventative and

Predictive Maintenance programs for rotating and stationary equipment using appropriate

technologies

• Coordinated with Production, Maintenance, and Engineering for the elimination of

chronic problems and repetitive failures by utilizing continuous improvement techniques

using six sigma and root cause failure analysis (RCFA).



Contact this candidate