Post Job Free
Sign in

Project Manager Construction

Location:
Visakhapatnam, AP, India
Posted:
March 30, 2015

Contact this candidate

Resume:

CURRICULUM VITAE

BODDEDA SHRINIVASALA NAIDU,

*-**-*, *** ********,

VISAKHA, ANDHRA PRADESH, Cell: +91-998*******/ +91-

837******** INDIA, pin- 530026.

Email: **********@*****.**.**

srinurishi

@gmail.com

Certified Welding Inspector/ AWS (Cert. No: 09114391)

D.O.B. & Nationality

27/05/1969, Visakhapatnam,

India, with valid 10 years Indian Passport (J-6383508) and Clean Driving License

(90301659/10)

Education.

1. Diploma in Mechanical Engineering.

Graduated from Alaknanda Vishwavidyalayam

2.Certified Welding Inspector / AWS.

Good knowledge of P&ID and Offshore plant production processes

Computer literate, sufficient knowledge in Microsoft Office Applications.

3.NDT level – 2 (ASNT-SNT-TC-1A)

1.Ultra sonic Testing

2.Radiographic Testing

3.Magnetic Particle Testing

4.Liquid Penetrant Testing

4. SAUDI ARAMCO CERTIFIED SAP NO: DCN NO: RM- 292

Courses

1.Confined Space Entry.

2.H2S Awareness Certificate.

Work experience.

I have over 18 years experience in the Engineering/Construction Industry, in the Oil,

Gas & Petrochemical sectors and in Ship Building. Construction / Fabrication,

Supervising/ Inspection on a very wide range of projects such as Aboozer-2000- Ship

Building and enough experience in Petro-Chemical Plants, Oil & Gas refineries,

Offshore hook-up’s, Offshore maintenance, Fabrication yard, Perform vessel repairs

and/or modifications in compliance with appropriate Codes and Standards. Plan and

schedule work fronts for construction crews during daily and continuous activities.

Understanding of tracking Quality Control & Assurance on material within the Oil & Gas

Sector. An ability to

understand complex technical specifications. Strong commitment to high standards of

safety and safeguarding

the environment. Solid leadership and communication skills, both written and verbal.

Understanding of ISO QMS management systems, processes and delivery requirements

of the construction / fabrication Oil and Gas industry with respect to

performance/delivery oriented services including offshore and pressure vessel

fabrication for oil & gas industry.

Employment History

Recruited for Senior QA/QC Engineer position in SHIMIZU CORPORATION INDIA

PVT LTD to construct the ILIN project from October 2012 to till date at Patal

Ganga, Mumbai, India.

Responsibilities:

Monitoring day to day operations of department personnel to guarantee compliance

with both client & code

specifications.

Implementation of quality control procedure manual processes for conducting day to

day operations, tests and inspections of products, services or processes.

Evaluating quality and performance as per client specifications.

Reviewing manufacturer's products and provided recommendation for design and

specification purposes.

Reviewing and approval of all associated supplier issued quality assurance, control

documentation, problem solving of field inspection non-conformances and deviations

from suppliers during inspection life cycle.

Monitoring and auditing the quality assurance and control activities performed by the

Contractor in the areas of engineering and construction

.

Developing and implementation of the Internal Compliance Audit Program.

Developing and implementation of the Quality Management System Training Program

for the Project Team.

Tasks handled in this project:

Established the Organization Chart of the QA/QC Department and deploy the QA/QC

resources, depending on the criticality of the work packages and the budget allowed.

Developed the QA/QC Documentation for the Project (Manuals, Plans, ITPs, Procedures,

Instructions, Inspection forms and Quality records etc. ) and Implemented the

reporting system for the QA/QC Department.

Managed Quality related interaction with the client and subcontractors/ execution

team in the establishment and maintain good relation between quality and

productivity.

Insured that all Quality Regulatory and contractual requirements and company policies

are being respected, organized and supervised throughout all the Inspection activities.

Coordinated Non-Conformity/ Surveillance issues between construction and

supervision team and maintained Quality records in conformance with contractual

terms.

Liaised with the Corporate Quality Manager in order to maintain the ISO 9001

registration and ensured the relevant reporting.

And any other duties assigned by the project manager within the scope of specialty.

JAN 2012 to OCT 2012: Appointed as QC Welding Inspector for CAIRN ENERGY

INDIA LTD., through ABS INDUSTRIAL VERIFICATION INDIA PRIVATE LTD at

MDPP terminal, Bhogat, Gujarat.

Main role is to perform all necessary inspection starting form IMIR/ dimensional

inspection according to AFC DWG/ fit up & weld inspections of tankages and

interconnecting pipe lines in fab yard and in erection.

Tankage part involve inspections regarding Banding, Peaking, Plumbness, Spot or

100% RT of Dome/ Knuckle/ Shell joints, annular and bottom visual/ RT/ Vacuum

inspections, Nozzle/ Sump/ Outlet orientation according to the Code reference of API

650 or 620.

Piping inspection usually starts with IMIR/ Bevel preparation / joint fit up/ dimensional

checkup as per given drawing/ joint secure until the weld commencement/ pre heat/

PWHT/ hardness/ Hydrostatic Test and RT etc. according to the given

DWG/CODES(ASME 31.3/ API 1104/ ASME 31.4/ ASME 31.8/ API 5L) and within the

processes (ASME SEC IX/ AWS D1.1)

RESPONSIBILITIES:

Insured that all inspections lied within the scope of recommended CODE by the

designer such as ASME- B- 31.3, API-650, API-620, ASME SEC IX, ASME SEC VIII, ASME

SEC V, ASME SEC II A and SEC II C.

Receiving orders from the project manager.

Reviewing all documents relevant to the project, including a detailed action plan

adopted by the project.

Reviewing all documents pertinent to the project, including; ITP, method of

statements, QAP, minutes of meeting, issued bills, workshop drawings and technical

specifications.

Coordinating with the safety officer regarding safety requirements.

Preparing periodic reports regarding the performance of work to be presented to the

project manager.

Ensuring that all stages of the project is going as planned and the consistent within the

scope given.

Handled Tasks:

Construction of Floating Roof, Cone Roof and Dome roof fabrication & Inspection

techniques as per API 650/ API 620.

To train and educate Welder at the Site and precautionary lectures to resolve weld

critical conditions.

Knowledge about AWS, BIS, BS and ASME codes.

Knowledge about work permit system & JSA and several SOPs and safe work practices

in running plants.

Knowledge in studying and understand P & ID and welding symbols & NDT symbols,

typical application & storing of welding consumables.

Control of residual welding stresses and stress relief heat treatment of weldments.

To inspect Raw materials, T.C. review and Witness of mechanical and chemical tests.

To witness, establish and approval of WPS, PQR & WPQ records.

To conduct Welder's Qualification test as per ASME section IX.

To plan and execute the hold points in various stages of inspection for pressure

vessels, and process plant equipments.

To witness of Hydrostatic test and leak test.

Radiography Inspection:

Follow-up of RT extent of inspection according to the CODE API-650/ API-620 for

annular, shell, and dome joints and if necessary for the fouling joints with RF pads etc.

Roof plate weld, bottom plate weld & weld joining shell plate to bottom inspections

shall be subjected to vacuum/ oil chalk and Leak tests.

To give witness by considering plate thickness into account as is less or equal to

10mm, one spot in the first 3 meter of completed vertical joint welded by each welder.

Apart from one additional radiography shall be taken in each additional 30 meter of

weld without regard to number of welders. At least 25% selected spot of T joints.

Location of spots shall be as per API-650, FIG-6.1 for Welded Tanks for Oil Storage (API-

650).

D.P.Test:

Accomplishment of DPT by capillary technique to the annular joints & visual inspection

of shell to annular plate welding from both the sides and Oil Chalk test to be witnessed

@ minimum of 4 hours holding time.

To ensure that the joints to be tested must be free of all foreign matter such as

grease, dust, paint etc.

To witness that there are no leaks in bottom plate welding and bottom sketch to

annular welding by vacuum box testing performance.

To conduct the testing of roof plate by applying internal pressure in the tank not

exceeding the Wt of roof plate.

JULY 2011 TO NOVEMBER 2011: GULF CONSOLIDATED CONTRACTORS CO.LTD,

SAUDI ARABIA.

Appointed as Senior Welding Inspector for Ras-Tanura cross country pipe line.

• Conducting Welder’s Performance Qualification Test (WPQT),

• Witness fit-up, In-process & final inspection of weld joints, dimensional and

alignment check on pipe spools during fabrication and erection. Receiving

material inspection, field Quality Control in accordance with Approved Issued

For Construction (IFC) drawings and design specifications.

• Assigned to this project for QC Inspection activities in accordance with approved

Project Quality Plan Procedure (QCP) and Inspection Test Procedure (ITP) for

Piping, Structural and Welding works to the whole scope of the contract of this

project and ensure all welding inspection activities complying to the approved

test procedure & engineering standards and international industry codes.

• Preparing RFI and Coordinates with client representative for the QC

implementation of the Project Quality Plan which covered the phases of

mechanical piping, structural steel & welding works with the applicable industry

Codes & ensure all pertinent QC welding inspection records and Documentation

are in compiled in boxes file for the preparation to hand over to the client.

• Responsible for the implementation on QC activities and

liaise with the Client Representative for the proper

execution and implementation of welding construction

Standards as described in the construction manual of the

project.

• Check the approved WPS & PQR packages prior to start

fabrication of pipes spool and miscellaneous pipes support.

• Inspection for incoming material and review the attached

certificates to ensure it complies to the approved purchase

order and project materials specification.

• Daily weld audit inspection according to the relevant WPS

records.

• Inspection of welding consumables materials to ensure it

complies to the approved WPS & PQR and maintain the

baking records of Low Hydrogen Electrodes.

• Witness pre-heating and post weld heat treatment as per

the specification.

• Visual inspection of bevel angle preparation, joint fit up and

weld visual.

• Coordinate to the Third Party testing Agency technician for the proper

execution of a particular NDT job.

Report directly to the Project Site QC Manager regarding the status of QA/QC activities

including preparation of compilation of all QA/QC Documents.

2006- 2011 SAIPEM Malongo: Appointed for Chevron – GREATER TAKULA AREA

INFRASTRUCTURE De-Bottlenecking project and Wemba project (deck extension in

BBLT) and off shore maintenance. Typically my experience involves upgrade of

Separators, Knockout Drums, Scrubbers & associated interconnecting piping, Bridles &

Trim, plus Structural Deck Extensions and modifications, Off-shore hookup and

Christmas tree fabrication and nozzle orientations, raisers and flow line fabrication, Pig

launch and receiving station fabrication and maintenance etc.

1999 -2005 ASRY (Bahrain) Position: Welding Foreman

Employed in Bahrain, for Magnum Ship Care in ARAB SHIP BUILDING & REPAIR YARD as

Welder and further promoted as WELDER FOREMAN. Fabrication and erection of

decks/ bulkheads/ various stringer levels/ modification of existing tanks & additional

tank construction for expansion as per the Client requirements and by satisfying Codes

& Standards. To conduct & witnessing of Pressure tests, vacuum tests, Hydrostatic

Static tests, Radiography, Ultrasonic, Magnetic particle and DPT with respect to the

degree of inspection required and maintenance / submission of Documentation.

Duties and Responsibilities:

1Ensure the calibration of equipment lie within the valid date

2To check the fabricated structures for appropriate root gap/ overlaps if any, prior

to the first arc strike

3To check the entire job for the required Hold Points

4Control Pre-Heat Treatment,Post-Weld Heat Treatment intervals if required

5Back Gouge Inspection in case of other side welds

6Control weld distortions

7Carryout visual inspection & other NDT inspections

8Carryout Pressure/ Vacuum/ Hydrostatic tests and Document keeping

9Carryout repairs interpreted by the NDT reports using Repair Procedures

10Accomplishment of retests and submission of Documents

1996 - 1999 HINDUSTAN PETROLEUM CORPORATION LIMITED, INDIA.

Pipe Fitter: Perform the daily run and maintain activities for safe refinery operations.

Declaration:

Here by I certify that the above statements are true and updated to the best of my

knowledge.

India BODDEDA SHRINIVASALA

NAIDU

Date: 14/01/2014. .



Contact this candidate