Post Job Free
Sign in

OFC Project

Location:
Mumbai, MH, India
Salary:
35000/Rs.
Posted:
March 24, 2015

Contact this candidate

Resume:

CURRICULUM VITAE

GHANSHYAM Kr. YADAV

Mobile: +91-982*******, 991-***-****

EMAIL-ID: *******@*****.***

Experience: 8 Year

OBJECTIVE:

Looking forward to associate myself with an organization where there is an

opportunity to share, contribute and upgrade my knowledge for development

of self and the organization.

EXPERIENCE:

> M/s R G Holding, New Delhi ( From March 2007- To April 2009 )

Worked as Project in Charge for OFC projects at different

location in India for major Telecom Operators

JOB Responsibilities:

Sub vender finalization for carrying out OFC work.

> Billing of Sub Venders and ensuring timely payment.

> Ensuring all resources is available at Site for smooth Roll Out.

> Coordinating with Client and ensuring timely completion of Project.

> Assigning responsibilities to engineers, so as target are achieved.

> Material planning and follow up with various Suppliers

> Pre checking of the Measurement sheet, As-Built Drawings Prepare,

material reconciliation, SubVendor bills.

> Ensuring Proper quality work is achieved in terms of Depth and Fiber

health.

> Ensuring proper Route Survey is done, to the satisfaction of clients

in terms of optimum route length.

> Trenching,Ducting,Hand Hole Installation,DIT,Cable Pulling,Termination,Splicing, All OFC work.

> HDD Mchine -- Vermeer 24*40, Ditch witch, China 18T, 25T

> Project Planing and Document management, Labour management

> Handle the team of 30 plus people include O&M staffs,HDD Machine

staffs

> Team manage of Patrollers, Splicers, Reduce cuts, Maintaining uptime, will be responsible for smooth functioning of OFC route,

Monitoring & Control

> Cor-ordinator and O&M planing

> Preventive & Corrective Maintenance of OFC Route

> Link testing and final Handover to Operation Department.

> OFC Link loss testing (OTDR,LSPM)

> OFC Cable locating work

> Route survey for OFC cable laying for new customer such as

IDEA,VODAFONE,TATA, AIRTEL, RELIANCE,BSNL,HFCL etc.

> Applying for R.O.W and Liasioning with Govt. Authorities for

ensuring permission

. for execution of work Row Permissions NOC.

Project Undertaken

1- Chhindwada to Parasia Airtel NLD route for 60 kms.

2- Indore and Gwalier Intracity OFC work for Idea Cellular for length

of 160 km.

3- Sagar to Guna Idea NLD Last mile connectivity for length of 250

km.

4- Indore to Dewas for Idea NLD route for 70 km

5- Indore Intracity for Vodafone and TCL and TTSL for length of 150

km.

6- Dewas to Harda Vodafone NLD Last mile connectivity for length of

130 km.

OFC Maintenance :

1- Carried out OFC maintenance work for TTSL in Delhi NCR area for

length of 260 km

> Idea Cellular Ltd. Indore (M.P.) (From April-2009 to 16-May-2012)

Worked as Project Engineer in Network Services and looking after OFC

roll out in Madhya Pradesh and C.G. Region.

Job Responsibilities:

1- Coordinating with various venders for day to day activity at sites

2- Ensuring Proper quality of work is carried out, in terms of trench

depth and fiber Health.

3- Coordinating with ISP venders for installation of MUX as per NDD

Plan.

4- Implement the OFC Network for NLD, Access and POI for Indore

Cluster. The Job comprises various elements like Mux/Demux,Utility, Shelter and Civil Work installation, Commissioning and

integrating it with the Network .

5- Supervision to Installation & Commissioning of ( Different types

ECI SDH,Mux "XDM 1000,XDM 300,XDM 50 & BG 20")

6- To follow the preventative maintenance program of MDF, DLU, &

Power Supply.

7- To handle all Cluster Fiber BB & ACC project including splicing

and termination

8- Implement the OFC Network for NLD, Access and POI for MP and CG

region. The Job comprises various elements like Mux /Demux,Utility, Shelter and Civil Work installation, Commissioning and

integrating it with the Network .

9- Roll out of NLD OFC Project Control the filed activity as per the

company norms

10- Control the Quality and do the final link testing before handover

of the fiber & equipment.

11- Link testing and final Handover to Operation Maintenance

Department.

12- Manage in OFC Project and O&M all work

13- Link loss test 1550nm and 1310nm

14- All fiber patch card patching & swapping work

15- Office Administration and all O&M related activity.

16- Support technical team for maintenance of inside intracity.

17- OFC Network testing with the help OTDR.

18- To follow the preventative maintenance program of MDF, DLU, &

Power Supply.

19- OFC Cable locating work

20- Splicing Machine - Fujikura 505, Fujikura 605,Fitel

21- OTDR Machine- JDSU, Acterna, Yokogawa

22- Vendor bills, Pre checking of the Measurement sheet, As-Built

Drawings Prepare, material reconciliation

23- Working with coordination with seniors and driving venders to

achieve targets in timeline set by H.O.

24- Tower work -- Civil work and Tower Erection

25- OFC Cable laying in project area

26- Trenching,Ducting,Hand Hole Installation,DIT, Cable Blowing,Termination,Splicing, Earthing

27- HDD Mchine -- Ditch witch, Vermeer 24*40, China 18T,25T

28- Cable Blowing - Compreser-- L.G., I.R. Cable Blowing - Cable Jet,Super jet

Project Undertaken

1- Bilaspur to Katghora Idea NLD for length of 150 km.

2- Raipur Intracity and Raipur to Jabalpur Idea NLD Last mile

connectivity for length of 380 km.

3- Gwalior to Bhind,Muraina Idea NLD for lenth of 100 k.m.

4- Indore intracity and Indore to Badawa Idea NLD for lenth of 150

km.

5- Sagar to Chhatarpur Idea NLD Last mile connectivity for lenth of

190 k.m.

> Himachal Futuristic Communications Ltd. Nagpur (M.H.)

(From 18-May-2012 To Till Date)

Working as Sr.Project Engineer in Network Services and looking after

OFC roll out in Maharastra.

Job Responsibilities:

1- Coordinating with various venders for day to day activity at sites

2- Management of technician & Contractor manpower to achieve the

company targets with quality work and cost saving methods.

3- Execute the subscriber connectivity Work Orders with in the

specified time frame. Fallow all company specification related to

installation of network element for connectivity of subscriber.

4- OFC all paper work ITP Prepare

5- Ensuring Proper quality of work is carried out, in terms of trench

depth and fiber Health.

6- Working with coordination with seniors and driving venders to

achieve targets in timeline set by H.O.

7- Tower work -- Civil work and Tower Erection,Electric,earthing,

DG

8- ILA (In Line Amplifier) 4G Project equipment

9- Link testing OTDR and LSPM and final Handover to Operation

Department.

10- Project Planing and Document management.

11- OFC Cable laying in project area

12- Splicing Machine - Fujikura 505, Fujikura 605,Fitel

13- OTDR Machine- JDSU, Acterna, Yokogawa

14- OFC Trenching work- Labour, JCB, Poclend 140,Poclend 200, Pokland

Breaker, Blasting

15- Trenching,Ducting, Hand Hole Installation,Cable Blowing,

Earthing, Termination, Splicing, OFC Project all work

16- HDD Machine 1- Ditch witch 2-Vermeer 24*40 3- China 18T 4- China

25T 5- China 35T

17- Cable Blowing Machine - Compressor- L.G., I.R. Cable Blowing-

Cable Jet,Super jet

18- Vendor bills, Pre checking of the Measurement sheet, As-Built

Drawings Prepare,IFC Marking

Project Undertaken

1- Wardha to Kinhi Jawade HFCL NLD for lenth of 90 km

2- Nagpur to Partoda Mumbai Link HFCL NLD and Intracity for lenth 110

km

3- Nagpur to Butibori HFCL NLD for lenth of 85

4- Butibori to Wardha HFCL NLD for lenth of 60

5- Karnja to Narkhed-Katol MP Link 45 km

PROFESSIONAL & TECHNICAL QUALIFICATION:

DIPLOMA IN COMPUTER APPLICATION- KNIIT Sultanpur (U.P.)

DIPLOMA IN CIVIL ENGINEERING, R.V.D.U.

TRAINING OFC CERTIFICATE IN HFCL GURGAON DELHI

TRAINING HEALTH and SAFETY, ENVIRONMENT BSI HSEF at

Nagpur (M.H.)

MBA PURSUING FROM GLOBAL UNIVERSITY GUWAHATI

COMPUTER SKILLS

> Packages: M.S. Office

> Operating: M.S. DOS, WIN. 2007-XP to Vista

> Internet: Basic

STRENGTHS AND SKILLS

> Good communication and

interpersonal skills.

> Good analyzing capability.

> Ability to work with a

team.

> Capability to work 24x7.

> Pragmatic, self-motivated and a good team player.

> Better command at

management level dealing

as well as to work as

Project.& Supervision

> Hands on experience on

splicing machine and OTDR.

> Manage in OFC Project and

O&M all work

> Strong working knowledge

of execution in difficult

terrain

> Hands on experience on ECI

MUX

> OFC Link loss testing

(OTDR,LSPM)

> Preventive & Corrective

Maintenance of OFC route.

> HDD,Trenching OFC Project

All work

ACADEMIC PROFILE:

Post Graduation

Dr. Ram Manohar Lohiya University

FAIZABAD (U.P) - (M.Com.)

Graduation

Dr. Ram Manohar Lohiya University

FAIZABAD (U.P.)- (B.Com)

Intermediate

Govt. Inter college Slt.- U.P. Board Allahabad

High School

Govt. Inter college Slt. - U.P. Board Allahabad

PERSONAL PROFILE: Name: Ghanshyam Kumar Yadav

Father's Name : Shri Radheshyam Yadav

Date of Birth : 07/01/1986

Gender : Male.

Marital Status : Married.

Nationality : Indian.

Passport No. : H6822639

Religion : Hindu.

Languages known : English & Hindi.

Hobbies : Travelling, Net surfing, Reading books &

listening songs.

Notice Period : One Month

PERMANENT ADDRESS:

S/O-Sri Radheshyam Yadav

Vivek Nagar

Dist.-Sultanpur (U.P.)

Declaration:

I here by declare that the information furnished above is

true to the best of my knowledge.

Place: Nagpur (M.H.)

Date: 24/03/2015

GHANSHYAM Kr. YADAV



Contact this candidate