MARK VILCEK **** Fiorellino Place / Cedar Park, TX 78613 / ********@*****.*** / 248-***-****
OPERATIONS AND ENGINEERING LEADER
GENERAL MANAGEMENT / PRODUCT DEVELOPMENT / ORGANIZATIONAL GROWTH
Strategic thinking leader with a steady track record of delivering operational excellence with 20+ years progressive experience
in Production, Supply Chain Management, Lean Manufacturing Engineering, Program Management, Product Engineering, and
Small Business Startup. Innovative and creative engineer drives NPI and Process Development in both mature and high
growth organizations. Industry knowledge includes Engineered Automotive Components, Oil and Gas Technology,
Electronics, Alternative Energy, High Volume Consumer Products, Specialty Chemicals and Plastics, and Military Spec
markets. Achieves margin improvement through recognizing cost reduction opportunities and value added design
enhancements. Creates high performance results through team development, effective direct report leadership, collaboration
all organizational levels, and an effective and influencing communication style.
PROFESSIONAL ACCOMPLISHMENTS
TOLTEQ GROUP - Cedar Park, TX Jan 2014 - Dec 2014 MANAGEMENT
PRODUCTION OPERATIONS MANAGER
Capital Expenditures
Challenge: To develop a lean manufacturing organization to support 100% sales growth and improve
operations based on performance metrics of cost, quality, delivery, and inventory turns Production & QA Management
Actions: Directed a plant re-organization to increase capacity by 50% and staffing plan development for Continuous Process Improvement
potential 2 shift operation.
Business Process Development
Added production, supervisory, quality, and engineering staff (25+ total) to support growth
•
Cross Functional Team
Optimized workflow through balancing work cells and cross training
•
Leadership
Directed supply chain activities to satisfy sales forecast vs. make to order
•
Developed metrics for on-time delivery, quality defects, lead time, and inventory turns
• Team Development
Strategized with senior management, and interfaced with key internal teams to establish and execute
•
Supply Chain
operational objectives, such as Lean Workflow implementation, 5S, and MRP/APS
Results: Q3 & Q4 operating at over 200% increase compared to Q1 & Q2 forecast and actuals Profit & Loss (P&L)
Budgeting
Improved on-time delivery to over 98% for six consecutive months, reduced lead times from 12
•
weeks to the expected 3-4 weeks by driving supply chain to satisfy quarterly sales forecasts
Margin Growth
Improved component first pass yield from low 80% to over 90%, using CAPA process and
•
structured problem solving
Reduced quality escapes from 1/month to 1/quarter after developing and coaching new QC
•
ENGINEERING
specialists team and updating & improving production control documentation
Operational Expenditures held to 90% of budget for FY 2014
• Advanced Product Quality
Inventory turns increased by 65% Planning (APQP)
•
Structured Problem Solving
DYNAMAX INC. - Austin, TX Aug 2012 - Dec 2013
NPI Champion and Contributor
DIRECTOR OF OPERATIONS
Challenge: To develop a professional production organization to support 50% sales growth, reduce COGS Manufacturing Engineering
and increase profitability by 10%+, increase customer satisfaction through improved quality and decreased
Product Lifecycle Management
lead times
Actions: Plant relocation and lean workflow implementation to increase capacity by 100% and staffing plan Design Reviews
development for multi-shift operation.
Program Management
Concurrent decommissioning of old factory, and 2 month commissioning of new plant
•
Failure Mode Analysis
Staff re-organization of 10+ terminations and 20+ hirings (50+ total) to support growth.
•
Capital project implementation to improve safety (zero LTA), quality (internal and external defects) CAD designer/engineer
•
and material yield supervision
Strategized with Senior Management and Board to prepare operating budget, set performance goals,
•
and capital expenditures
Directed product design enhancements and launched 2 new products in 6 months
• STRATEGY
Results: Operational metrics were all trending positively, revenue grew by 175% Sales and Ops Planning
COGS reduction 10%+, from 2012 to 2013, increased turns by 100% Strategic Planning
•
Improved on-time delivery to over 95% for 9 consecutive months, reduced lead times from 6 weeks
•
Goal Setting
to the expected 1-2 weeks by productivity improvements and driving supply chain to satisfy
quarterly sales forecasts Market Evaluation
Improved quality from 5% rejects per week <0.1% per week by implementing SOPs, Quality
•
Customer Requirements
Standards, QC inspection team, and technician proficiency checklists
Operational Expenditures held to 95% of budget for FY 2013
•
MARK VILCEK pg. 2 ********@*****.*** / 248-***-****
PROFESSIONAL ACCOMPLISHMENTS cont.
VIRYD TECHNOLOGIES - Austin, TX Jul 2010 - May 2012
MANUFACTURING OPERATIONS MANAGER / SR. MANUFACTURING ENGINEER
Challenge: To develop and expand manufacturing operations of a wind turbine product range, and Program
Manager of sustaining products TRAINING
Actions: Established lean manufacturing assembly and test processes, visual inventory flow, SOPs, safety and Project Management
quality programs, and managed 8 contract manufacturers in China and North America
Lean Manufacturing Engineering
Staffed and trained a production and engineering technician team of 10 to execute product
•
assembly, quality testing and system integration. APQP
Managed facility infrastructure upgrades including 30,000 sqft building expansion and utility
•
Shainin / Red X Problem Solving
provisions at 15% under budget
Implemented Kaizen events, Kanban, and visual trigger inventory flow and control resulting in
• Six Sigma
cycle time reduction of 50%
Statistical Process Control
Conducted due diligence analysis for acquisition of a contract manufacturer
•
APICS MRP/APS
Results: Implemented process improvements and drove cost reduction resulting in 10% cost savings pre-
launch
ISO 9001
Developed world class assembly and test factory for <10kW wind turbines
•
TS16949
Problem Resolution Tracking System (PRTS) and structured problem solving reduced critical
•
success roadblocks to meet aggressive program timing Unigraphics / AutoCAD
Built 1st unit for installation at Illinois Institute of Technology for part of a joint corporate and
•
Finance for Technical
academic effort to promote alternative energy in the US.
Professionals
OTHER PROFESSIONAL EXPERIENCE* – Lake Orion, MI Jan 2009 – Jun 2010 PLC programming
L&L PRODUCTS – Romeo, MI Process Engineering Technology
ADVANCED ENGINEERING PROGRAM MANAGER May 2006 – Nov 2008
Safety Training Certification
Challenge: To develop and execute North American engineering strategy for structural components in Korean
OEM market Factory Environmental
Compliance
Actions: Established engineering and test team and directed design and mfg. strategy for 3 vehicle platforms
Results: Awarded $9.0MM project on injection molded structural adhesive composite inserts to meet Federal
Safety Standard for Side Impact to reach 5 Star rating on sedan and SUV platforms.
COMPUTER SKILLS
PRODUCT DEVELOPMENT ENGINEER Jun 2001 – Nov 2008 High Microsoft Office Proficiency
Challenge: To engineer and commercialize sealing and structural solutions for automotive and aerospace MS Project & Visio
applications, and increase revenue by 25% through opportunistic selling and creativity
ERP – Syteline, Oracle, SAP
Actions: Directed design, validation team, and manufacturing strategy for 5 vehicle platforms, and
communicated technical and commercial information at all organizational levels including C level, directors, JIRA
engineering and plant managers, purchasing managers, and application engineers
MiniTab
Results: Directed design, testing and implementation over 150 new product designs on eight different vehicle
platforms generating cumulative revenues of over $50MM, consistently growing vehicle content by 20%
Holder of 2 patents generating annual revenues over $6.0MM
•
RECOGNITIONS
SR. MANUFACTURING ENGINEER Small Business Development
Oct 1998 – May 2001
Certification – University of TX
Commissioned 4 new manufacturing lines / processes using lean manufacturing philosophy,
•
including equipment selection, installation, and pre-production validation Patent #200******** -
Increased first pass yield from 85% to 97% by implementing SPC control charting and process Automotive Roof Ditch Joint
•
optimization procedures for twin screw extrusion lines Sealant
Managed efforts of cross-functional groups to integrate and debug new process startups. 3
•
Patent #200******** – Noise
successful product launches in 2 years, yielding sales of approximately $10MM combined
Reduction System
UNILEVER CORP. - Chicago, IL & Hammond, IN
SR. PROJECT ENGINEER 1995 - 1998
*OTHER PROFESSIONAL
PRODUCTION ENGINEER/SUPERVISOR 1991 - 1995
EXPERIENCE
Direct Marketing / Sales
EDUCATION
Professional – 4 yrs
B.S. INDUSTRIAL AND SYSTEMS ENTERPRISE ENGINEERING, minor in Business Administration
UNIVERSITY OF ILLINOIS AT URBANA / CHAMPAIGN Private Business Owner – 3 yrs
M.B.A. coursework completed in Marketing, Finance, Organizational Management, Manufacturer’s Rep. - 1 yr
International Business, Business Law
UNIVERSITY OF PHOENIX