Post Job Free
Sign in

Drilling Supervisor/Superintendent

Location:
Shreveport, LA
Posted:
March 18, 2015

Contact this candidate

Resume:

DEAN W. BAKER

**** ***** ********* *****

Shreveport, LA 71109 USA

Ph: 1-318-***-****

**********@*****.***

Date/Place of Birth: 23/Jul/1949, Shreveport, Louisiana USA

Nationality/Passport/Security Clearance: American, USA Passport, TSA

Global Entry Card

Specialization: Wellsite - Drilling, Work-over, Completion, Supervision

Expertise: Drilling Supervisor, Field Drilling Superintendent

Certifications: IADC (WELLCAP), Supervisor, Surface - Drlg/Workover/Compl

Memberships: Society Petroleum Engineers, IADC Drilling Engineers,

LinkedIn

QUALIFICATIONS:

Forty years, field & office experience - drilling, work-over, completion

operations: Domestic, International, land (remote, jungles, desert),

offshore (platforms, barges, jack-ups, floaters).

Field Supervision through Management Operations: planning, well design,

building roads, laying pipelines, staking, supervising building location

pads & production facility installation, supervising drilling, work-over &

completion operations, purchasing drilling & completion equipment, crew

selection & training, flow well through production facilities, transporting

product to market.

Positions held: Drilling Engineer/Supervisor/Superintendent

Prepared well programs, AFE's, Lessons Learned, End of Well Re-cap,

purchased tubulars, wellheads, upper trees, drilling & production

equipment, supervised field personnel (drilling, work-over, completion &

production operations). Worked for United States Federal Bankruptcy Judges

& Trustees, liquidating/re-structuring, Operating & Drilling Companies.

Supervise office staff, field drilling & work-over operations. Organize &

restructure Lithuanian JSV Company (management & field operations) per

Western technology & procedures (daywork drilling, completion & work-over

operations).

Drlg Reports used: Wellview 9.0, DIMS, RimBase, PERC, PA, IDS, Misc Excel

Spread Sheets

Supervised complete: drilling, work-over, completion, re-entry, production

operations, 4 rigs drilling below 16,500' (SLA & MS), 5 drilling rigs -

Siberia, Russia (all Russian crewed, various Int'l Service Co's) building

wellsite pads, drilling & completing wells, putting wells into production

facilities.

Drilling: Compressors/Boosters (air, air/foam, natural gas, N2, nitrified

crude oil), salt, lime, KCL polymers, PHPA, OBM (synthetic, diesel), drill

in fluids, HPHT (mwt's to 18.6 ppg, BHT 400 degF). Drilling without

returns, Mud cap drilling. Closed loop de-watering, cuttings re-injection

systems. Mud motors, Turbines, Rotary Steer-ables, Power V-Drives, Tru-

Trak, shock sub/agitator combo. Geo-Vision E-logging, ABI (at bit

inclination). Hole openers, under-reamers, inflatable stabilizers, bi-

directional bits. UBD (drilling with N2, formation producing nitrified

oil). Strip (in/out), circulating kicks, abnormal drlg conditions. Leak-

off, FIT. Drilling, coring (rubber sleeve & conventional), DST in H2S &

CO2. Drill 36"- 4-3/4" holes, run/cement 30"- 2-7/8" csg. Set permanent,

retrievable (1 trip orienting) whipstocks, section milling, cutting casing

windows. Open hole cement plugs for KO & lateral sidetracks. Drill high

angle (60 ), directional, horizontal (97.8 ), extended reach, multi-

laterals, LWD/GR/DN/MWD, EM/PWD. Cement: surface, liners, liner tiebacks,

intermediate, production casings. Electronic inspection & hydro pressure

testing tubulars.

Completions/Re-Completions: Vertical & horizontal completions, ESP's,

barefoot, monobore, 36 swell & 36 frac sleeves, ECP & Mpas packers, 9-

5/8" X 7-5/8" casing completions, 5-1/2"-2-7/8" tubulars, single/dual

strings, tubing conveyed perforating, mechanical, flowing, acidizing,

fracing (CO2, N2), swabbing. 7-5/8", inconel packers, 16900', 5-1/2",

chrome/nickel/vanadium, tbg strings (CO2/Helium, cased hole), directional

wells, with Flex 4 rig. P&A: cut, pull, intermediate, production casing,

reserve pit disposal, location restoration. Install surface production

equipment (pumping & flowing wells) & laying pipelines, OBM & WBM pit

solidification/reclamation, using Soil-Bond. Ran 7-5/8" inconel/nickel

packers (set by wireline), 16900 5-1/2", chrome/nickel/vanadium, VAM,

alloy tbg strings, with seal assemblies, in CO2/Helium/H2S, cased hole,

directional wells, with Flex rig. Ran coil tbg, perforated wells, Big

Piney, Wyoming. Recover 14320', 2" coil tbg, with snubbing unit, on live

CO2 well, Big Piney, Wyo. Drill Bakken, N Dakota, ERD horizontal wells,

drill, run & cement, 9-5/8", 7", 4-1/2" liners with hydraulic set hangers

(32+/- swell packers & sliding sleeves). OBM & Salt water, CLS.

Drilling depths: 23,800' (H2S, HTHP), Miss

Completion depths: 23,800' (H2S), Miss, 21,738' (CO2), E. Timor Sea, Timor;

16,900' (CO2/Helium), Wyo.

Semis, drillships (anchored & DP) - water depths 2,385', drilling depths

18,850' (3,670' extended reach). Barges, jack-ups, tenders, platforms -

water depths 480', drill depths 21,738' (4,860' extended reach).

Barnett Shale (vertical & horizontal-OBM, CLS, pre-setting 9-5/8" super

single), Bakken Shale (vertical-OBM, horizontal-Brine water, CLS),

Haynesville Shale (horizontal-OBM, CLS), Coal Bed Methane (vertical &

horizontal-air, WBM)

EXPERIENCE:

DIXIE RESOURCES, INC DRILLING CONSULTANT 1984-

PRESENT

Consulting Drlg Supvr/Supt/Engr - office, wellsite: drilling, completion,

work-over, production facility installation operations, land (jungles,

arctic, desert) & offshore (semis, platforms, barges, tenders, jack-ups):

USA (land, GOM) & INTERNATIONAL (land & offshore).

Feb2014-Current, Denbury Resources, Sr DSV, S.Louisiana, drill 16",

set/cement 13-3/8", install diverter, drill 12-1/4" to 3450', run/cement 9-

5/8", drill directional, 8-3/4" to 10540', run/cement 5-1/2". Drill (3) CO2

wells (1 injector, 2 producers) on 1 pad. Transfer Big Piney, Wyo, ran 1-

1/2" coil tbg inside 2-7/8" tbg, in disposal well, clean out perfs,

11,600'. R/U stand alone snubbing unit, multiple rams (151' tall), live

CO2/H2S/Helium, vertical well (16990' PBTD). recovered 13919' of 14320', 2"

coil tbg (dropped cleaning out sulphur & hydrate deposits). Transfer

Biddle, Mont. R/U stand alone snubbing unit, multiple rams (71' tall), on

P&A well (drilled 1968), Clean out cement plug, in 8-5/8" csg, set/cement,

7", FJ, scab liner, 200'. Re-drill well bore, 6-1/4" bit, to 2048'. Rig

down, snubbing unit (excessive cold weather, high winds). Move in workover

rig, clean out to 2300'. Ran/cement 4-1/2". Move workover rig on P&A well

(drilled 1968) w/ Closed Loop De-watering unit. Clean out 8-5/8" csg & open

hole, set/cement, 7", FJ scab liner, 905'. Re-drill wellbore, 6-1/4" PDC,

to 5200'. Set (6) open hole plugs.

July2013-Nov2013, Genel Energy, Drlg Supt, Erbil, Kurdistan, Miram Block,

Drill 26", run/cement 18-5/8" csg at, 865m. Core 8-1/2", 110+m, to 976m.

Open 8-1/2" to 17-1/2" & drill (motor & PDC), to, 1860m. Drilling & coring

with massive losses, mud cap drilling. Set: CaCO3, Polyswell, FormAPlug &

Cement (acid soluble) plugs. Drill string failure (DP/DC), change out

complete drill string.

March2013-June2013, Melrose Resources: Sr DSV, onboard GSP, Prometeu 4-leg

jack-up, updated Romania, shipyard. Tow to offshore Bulgaria, Black Sea,

260' water depth. Drill 36" to 850', run 30" w/ 30'' riser disconnect,

cement, install 29-1/2'' diverter, drill 8-1/2" pilot, to 2800', open to 17-

1/2", run/cement 13-3/8" w/ 16'' riser tie-back/disconnect, N/U 13-5/8"

BOP's, Drill 12-1/4'' to 3600'. Run & cement 9-5/8" casing, hang off in mud

line suspension system.

July2012-Feb2013Cook Inlet Energy: Cook Inlet Alaska, Drlg Advisor, rig-up

new platform rig, re-completing wells.

Aug2011-June2012Denbury Resources:Sr DSV, Ran & set 7-5/8" inconel packers,

ran 16,900 5-1/2", chrome/vanadium/nickel tbg, with seal assemblies,

in Helium/CO2 wells, land in packers. Ran coil tbg clean out, perforate,

Big Piney, Wyoming. Drill Bakken, horizontal wells, run & cement, 9-5/8",

7". Drill 6-1/4", horizontals, ran 4-1/2", liners, 25+/- swell packers &

frac sleeves, hydraulic set hangers. Circ wells on choke, OBM & Salt water,

CLS.

Pioneer Natural Resources USA: Sr DSV, Drill Exploration well, Juab, Utah,

transfer to Barnett Shale, Alvord & Sunset, Texas

Hess Corp: Bakken Shale, Tioga, North Dakota/, Chesapeake: Haynesville

Shale, Shreveport, Louisiana/, EXCO: Haynesville Shale, Shreveport,

Louisiana/, Devon: Bossier Shale, Fairfield, Texas/, El Paso: Duchesne,

Utah & Raton, New Mexico/, Vietgazprom: Bac Bo Bay, Vietnam, Drillship/,

Tethys Oil: Karlebo, Denmark/, Boots & Coots: Surabaya, Indonesia/, KCS:

Thornton & Malakoff, Texas/, Khalda Petroleum Co: Western Desert, Egypt/,

ConocoPhillips: Robertson, Texas/, DNO: Dohuk Block, Kurdistan, NE Iraq/,

TMX: Tisza Block, Budapest, Hungary/, VPYI: Damis, Block S-1, Desert,

Sana'a, Yemen/, Pan African: Port Gentil, Gabon, West Africa/, YHOC: Marib-

Al Jawf, Block 18, Desert, Yemen/, ConocoPhillips: North Sea, Scotland,

Semi/, Plains Resources: GOM, Louisiana, Jack-up/, Apache: Matruh, Western

Desert, Egypt/, OXY: Parachute (Grand Valley), Colorado/, ConocoPhillips:

E. Timor Sea (NW Australia/Timor), Jack-up/, OXY: Amazon Rain Forest

(jungles), Ecuador/, TFE: Arctic Circle, Siberia, Russia/, Hurricane

Exploration: Kumkol & Kyzlorda, Kazakhstan/, UNOCAL: Gulf of Thailand,

Thailand, Jack-up/, Minijos Nafta: Gargzdai, Lithuania (FSU)/, Pioneer:

Gulf of Mexico, Jack-up/, PEMEX (Halliburton IS Alliance): Reynosa,

Mexico/, UNOCAL: Makassar Strait, Indonesia, Jack-up/, Seagull: Red Sea,

Egypt, Platform/Tender/, UTP/ARCO: East Sindh (desert), Pakistan &

Mediterranean Sea, Tunisia/, CONOCO: Aria Jaya (western jungle),

Indonesia/, Kerr McGee: Beijing, Bohai Bay, China PRC, Barge/, CNOOC: East

China Sea, China, PRC, Semi/, World Bank: Koglymneftegaz, Woodbine,

Surgutneftegaz, Tomskneftegaz, Sibneftegaz, Western Siberia, Russia/,

Maravan: Lake Maracaibo, Venezuela, SA, Barge/, Seagull: NLA, ETX, OK/,

ENRON & SONAT: NLA, ETX/, Florida Exploration: NLA, ETX, MS

Direct Employee: Latham Exploration, Sr Drlg Engr, Hunt Energy, District

Drlg Engr, TENNECO, Drlg & Compl Engr, Gulf Oil Co, Drlg Engr, ARK-LA, Drlg

Engr Supvr, Barnwell & Butler Johnson Drlg Co's, Roughneck, Derrickman

GEOGRAPHICAL AREAS:

USA: Land - N&S Louisiana, Alabama, N&S Ark, Okla, Miss, NMexico, E&W

Texas, California, Colo, Wyo, Mont, N.Dak, Utah, Maryland. Offshore - Cook

Inlet, Alaska, GOM-OCS, Inland Waters S.Louisiana & Texas, Santa Barbara

Channel, California.

International: Land - Siberia Russia (Koglym, Strezhevoy, Sugut, Tomnsk,

Khariaga - Arctic Circle); Gargzdai, Lithuania; Kumkol & Kyzylkiya,

Kazakhstan; Beijing, China, Irian Jaya (Jungles), Indonesia; East Sindh

Desert, Pakistan; Reynosa, Mexico; Amazon Rain Forest, Ecuador; Matruh

(Western Desert), Egypt; Marib, Al-Jawf, Damis Blocks (Desert) Yemen; Port

Gentil, Gabon, West Africa; Budapest, Hungary; Kurdistan, NE Iraq; E. Java,

Indonesia; Karlebo, Denmark. Offshore - Adaman Sea, Burma & Thailand; Lake

Maracaibo, S America; SE China Sea, Bohai Bay, China, PRC; Gulf of Suez,

Egypt; Mediterranean Sea, Tunisia; Makassar Strait, Indonesia; Gulf of

Thailand, Thailand; E. Timor Sea, NW Australia; North Sea, Scotland; Bac Bo

Bay, Vietnam, Bulgaria.

EDUCATION:

1973-74 LSU, Shreveport, Louisiana, 1974 Graduated -- BGS Degree

1969-72 Centenary College, Shreveport, Louisiana, (Geology & Engineering)



Contact this candidate