ANIRBAN BANERJEE

Burdette Common Contact: 510-***-****

Fremont, CA 94536 Email: acor67@r.postjobfree.com

OBJECTIVE: A full time opportunity as a Senior Electrical Design Engineer

/ Project Lead with an established, goal oriented, purpose

driven organization with scope for career advancement and

professional development.

PROFESSIONAL EXPERIENCE:

Confidential, Sunnyvale, CA Oct.’2013 – Present

Electrical Designer

Industrial Research & Development Lab Upgrade, Palo Alto, CA

Lead Electrical Designer for upgrade of Industrial Lab

- Meeting all stakeholders including the Client, Facilities, Lab and others.

- Coordinating requirements, submission schedule and City delivery with

stakeholders.

- Field survey of existing facility and existing electrical infrastructure in

coordination with Facility group

- Develop Load calculations and Single Line diagram per the Facility

standards and Lab client requirements and inputs from Facility group.

- Study of Facility group and Lab’s standards, Code check.

- Coordination with Facility group approved vendors for electrical equipment

availability, lead times and collaborate with in-house estimator. Develop

Specifications for electrical switchboards, panels, disconnect switch,

circuit breakers type, receptacles, outlets and common electrical work.

- Coordination with Architect and stakeholders for Demolition plans

coordinating for removed, relocated and existing items.

- Lighting: Coordinate with Architect and Lighting Designer selecting lighting

fixtures per Lab’s requirements, lighting calculations. Coordinate with

other trades for final location of lights, creating Lighting Plans with normal

and emergency lighting.

- Power: Coordinate with Lab and Facility group for power and low-voltage

infrastructure requirements. Electrical Room layout and locating normal

panels and emergency generator panels in the lab area. Assessing and

designing plan per Lab’s layout and equipment requirements. Design,

sizing, circuiting and layout of NEMA type receptacles, outlets, dis-

connect, circuit-breakers per voltage & ampacity with conduits, wiremold

raceways, electrical feeders/conductors and grounding per 2011 NEC.

Specifying outlet, receptacle, circuit-breaker, disconnect type and

-1-

manufacturers per Facility Standards.

- Panel schedules and Load summary calculations. Assessing electrical

load on existing 12.47kV switchgear.

- Grounding: Assessing grounding requirement for lab and Low-voltage

cable-tray. Designing, sizing and layout of grounding grid. Connect

equipment to grounding grid and ground bus-bar connected to main bus-

bar in main electrical room.

- Low Voltage: Assessing and designing electrical infrastructure

requirements for tele/data and low-voltage requirements per Lab.

Designing, sizing and layout of conduit and circuits.

- Assessing, sizing, designing and mounting of raceways and cable-trays

per CAT 5e cable runs, bends and specifying model & manufacturer.

- Assessing, sizing, designing and ambient conditions of disconnecting

means for equipment of other trades.

- Coordinating with Architect and other trades for Design review, QA/QC

and incorporating those changes.

- Client submission, attend design review meeting.

- Incorporating design review changes in the drawings, responding to

Client’s comments and ensuring to stay within scope & budget.

- Plancheck submission of 90% CD package to the City with Load

Calculations, Title 24 calculations.

- Project successfully delivered on time, within budget and scope using

AutoCAD 2013, EnergyPrio 5.1, Visual. SKM to be used for Arc Flash

coordination by third party vendor.

University Research Lab, Palo Alto, CA

Lead Electrical Designer new Research & Development Lab at the University.

Job Start: Attending the job-kick-off meeting with the Project Manager, getting

project requirements, delivery schedules, coordinating for acquiring

the as-built drawings from the University, site visit and coordinating

with other trades, preliminary load calculations and Code check.

Design Phase:Prepare electrical plans for site, single line diagram, coordinating

with lighting designer for lighting layout, Title 24 calculations,

electrical room layout, power, tele-data, cable-tray, grounding,

enlarged plans using AutoCAD 2014, Energy Pro 5.1, Visual, MS

Xcel, MS word.

Coordinate with other trades and client for equipment requirements

and layouts.

Attend Design review meetings, prompt response to client’s

requests and design alterations as required to work with all team

members.

Successful delivery of electrical plans along-with other trades to

Client.

-2-

Sprig Electric, San Jose, CA Jan.'2010 – Oct.’2013

Design Engineer

University Medical Office & Counseling Center, San Jose, CA

A new three-story Medical Office & Counseling Center Building comprising of

outpatient medical offices, nurse-call center, x-ray room, diagnostic center,

Counselling center, Pharmacy, Administrative offices and support areas electrical

design engineering from Job-Start to Plan Check Submission.

Single Line Diagram: Design Engineer single line diagram per Load summary,

preliminary equipment schedule, motor loads, mechanical

loads and other Spare capacity per 2010 NEC.

Site Plan: Site Electrical Plan showing location of existing feeders of

University per Civil Plans – route of feeders to main

switchboard. Site lighting per Landscape & Architectural

plans.

Lighting Plan: Laying out of normal & emergency lighting fixtures primarily

LED & CFL lights per Lighting Fixture schedules in

coordination with Architect & PM. Design engineer Lighting

Plan to meet Title 24 requirements, Title 24 Calculations,

lighting circuitry, lighting panel schedule for normal &

emergency.

Power Plan: Laying out of receptacles, outlets, electrical room, equipment

layouts per Arch & Client requirements. Design engineer of

Power plan of outpatient-offices, clinics, offices, nurse-call,

meeting centers, equipment, and per mechanical & plumbing

plans.

Panel schedules per Single Line Diagram, Single Line

updates per CD design, electrical details. Coordination with

Low-Voltage (Nurse Call, Security, Tele-Data)

consultants/engineers for their conduit, cable-tray and power

requirements.

Coordinate with the Architect, Client, mechanical and plumbing engineers for

updates & changes for completing design and successful delivery.

University Data Center, CA

-3-

Single Line Diagram: Create Single Line Diagram in consultation with project PM

a load calculations based on 4kW/rack. Existing Main

Switchboard used to feed the new Data Center. Data Center

PDUs' fed from Distribution Panels which are fed from

Distribution Board & UPS-battery system. Each Distribution

Board fed by normal & emergency generator; switching

through ATS. Each rack fed from PDUs' by overhead starline

bus with C.B protection.

Lighting Plan: Layout normal & emergency (battery-pack) fluorescent

lighting fixtures per space requirements & to meet minimum

egress foot-candle requirements. Run photometric

calculations using Visual Studio. Design engineer the

circuitry of the lights with motion sensors, day-lighting and

switching controls. Layout and connection of exit-signs per

Architects' egress plan. 2008 Title 24 calculations by Energy

Pro. Preparing Lighting Fixture cutsheet submittal

package.Coordination with other trades for final locations

due to space & elevation space constraints.

Power Plan: Coordinate rack requirements & power receptacle

requirements for each rack -row to be fed from starline

bus.Design engineer electrical room layout per 2007 NEC,

circuitry, grounding plan (connections between Ground Bus,

equipment, racks and to Main Ground Bus tied to system

ground). Coordinate with Mechanical, Plumbing, FA, Tele-

Data trades for route of conduits, connection to Mechanical

controlled by VFDs',Plumbing equipment by Disconnects.

Panel schedules, Equipment schedules, Load summary.

Coordination with other trades for space constraints & final

delivery.

Putting together the package for CD and Plan-check submissions.

Industrial Facility Expansion, CA

Single Line Diagram: Create Single Line Diagram by studying the existing As

Built information, 3-day meter reading, new equipment

schedules and by coordinating with field staff for field

verification of existing electrical infrastructure.

Power Plans: Design Engineer the Power plan per the equipment layout of

the Client, coordinate with client for disconnecting –

means/terminations to equipment, routing of feeders in an

open ceiling and connecting equipment so as to keep

-4-

construction cost low & electrical load balanced.

Timmons Design, San Francisco, CA Jan'2009 – Nov.'2009

Senior Electrical Engineer

Performing Arts Center, Livermore, CA

T his project is a three thousand seats three level auditorium building. The project

required close coordination with theaterical consultants, lighting designers, architect and

the owner. Performed Load calculations, single line development, sizing of main meter

equipment, sizing of conduits and feeders per NEC 2008, electrical equipment layout,

layout of receptacles, providing power to theatrical equipment & theatrical lights,

calculation of emergency egress foot-candle in common areas, providing general lighting

and power to common & support areas. Coordination with mechanical engineer for

providing power to roof-top air handling units, exhaust fans, chiller; coordinate with

plumbing engineerfor water-heater, fire-pump requirements. Putting together the

electrical specifications and submission to client for pricing.

Large Residential-Commercial Project, Abu Dhabi

T his is a large scale residential-commercial project in Abu Dhabi comprising of 80+

residential bungalows, commercial center and large site.

Schematic Design Document: This phase of the project involed gathering of information

about the varous utility providers like ADDC, study of The Wiring Regulations,

muncipality requirements & ADDC regulations, available electrical systems, coordination

with their utility providers, assessment of site requirements, load calculations,

ascertaining of middle-east market ready switchgear & electrical systems, sizing of main

11kV switchgear system and down-stream requirements. Putting together the

specifications per the Abu Dhabi Wiring Regulations conforming to the British Standard.

Construction Design Document: This phase required receiving & understanding the

clients' detailed requirements, designing the 11kV-400/230V systemfor the entire site,

designing the single line of the entire power system. For each bungalows included layout

of socket-outlets, seprated extra-low voltage socket outlets, lights per lighting designer

requirements, switches, coodinate location of the main-meter & Final Distribution Board

(main panel), main feeder, earthing, coordinating power requirements for mechanical for

heat-pump, fan-coil system, condensate pump; water-heater, circulating pump from

plumbing, providing outside lighting and socket-outlet in roof areas & entrance per Abu

Dhabi The Wiring Regulations.

The commercial center, required laying of socket-outlets, switched-outlets for freezer &

other equipment, providing power for lighting per lighting designer, coodinating the

location of main panel, providing power & isolator (disconnects) for mechanical air-

conditioning system, providing power & isolator for site water-pumps, fire-pump and

electrical infrastructure for tele-data, cable and security.

The main electrical room and the sub-electrical room design layout, layout coordination

with client, main switchgear selection, switchboard, panel isolator, circuit breaker sizing

& selection, main feeder & distribution feeders, coordination with electrical equipment

-5-

manufacturer, underground routes for the bungalows, commercial center & site

infrastructure, route for tele-com & security conduits with space for future expansions.

Coordination with client and resident consulting engineer for application for new service

main meter application, feeder routes, room selection and other requirements.

ATI, San Ramon, CA Nov.'2007-Dec.'2008

Design Engineer

ARMC Medical Office Building, CA

Schematic Design of Medical Office Building per client requirements. Develop Single

Line drawing, Load Summary, electrical site plan showing location of existing & new

utility services and route of new underground feeders. Laying out electrical switchboard,

electrical panels, fire-alarm panel. Prepare application package for service upgrade to

PG&E. Perform preliminary T24 calculations. Put together lighting fixture schedule with

lighting fixture cut sheets, electrical switchboard, and electrical panel cut sheets for

submission for client review.

Dynergy Motors

Inspection and observe witness testing of (1) 900rpm & (2) 1200 rpm 6860 HP, 13.2kV

motors at client selected maintenance plant. Witness the testing of insulation of rotor

winding of each motor by Partial Discharge Test and PDMA testing by third party vendor.

Compiling test reports and observation summaries into project report as final deliverable

to client.

DL Engineering, Glendale, CA Feb'2007 - Oct'2007

Project Engineer

NORDHOFF PLAZA, Nordhoff, CA (Retail Building)-140,000 sf

Load Calculations per CEC 2002, design of preliminary single-line drawing, proposed

routing of feeders, coordination with SCE for load requirements, location of utility

transformer.

Electrical room layout, location of switchboards, panels, location of fire-alarm panels,

telephone board, feeder-conduit, telephone & fire-alarm conduit requirements.

Layout and Engineering design of lighting plans, power plans, communication & fire-

alarm plans, single line diagram, panel schedules, load summary, T24 calculations

leading to plan-check submission.

SPEEDY CASH, Fullerton, CA (Retail Shop)

Lighting layout, lighting fixture schedule, Title 24 calculations, lighting circuiting plan and

lighting panel schedules.

Coordinate equipment schedule with architect & client, power outlets, wiremold raceway

-6-

layout, tele/data outlet layout, power circuitry, providing conduit and power for security

cameras, motion-detectors and designing single line drawing & panel schedules.

Coordinating with the mechanical and plumbing engineer for providing power to hvac &

plumbing equipment.

Plan check submission-approval and sending out the bid package.

Storms & Lowe, Los Angeles, CA May 2006 - Feb'2007

Project Electrical Engineer

Multi-use High rise Condominium & Commercial Building (200, 000 sf)

Lighting Plan (Retail Podium & Condos): Coordinate lighting fixture schedule with the

architect & client, Title 24 calculations including outside lighting, roof lighting & signage,

lighting circuiting plan layout of normal & emergency circuits and panel schedules.

Power Plan: Locate receptacles on plans, identify power requirements, site visits to

ascertain existing power systems, design proposed load summary and single line

diagrams for the retail-podium, condominiums and roof plan. Fault-level calculation

based on available fault level, sizing of switchboards, transformers, conduits, bus-bar,

voltage-drop calculations.

Sizing of Emergency generator .Coordinate location of equipment with architect & client.

Coordinate with Mechanical, Plumbing engineers for power requirements of AC units,

Fan-coil units, sump-pumps.

Security Camera & Parking Station Plan: Draw plans on AutoCAD for Closed Circuit

system in parking garage & provide power & conduits for parking station. Coordination

with client & architect for selection of security camera power source, routing of cables in

conduits & location of security cameras & equipment.

Coordination with the City of Los Angeles Plan-checker for approval of Electrical

drawings.

Simon Wong & Associates, Los Angeles, CA M ay 2003 – May 2006

Sr. Electrical Design Engineer

COMMERCIAL HIGH RISE, Los Angeles, CA (12,500 Sq.Ft.)

Lighting Plan: Coordinate lighting fixture schedule with the architect & client, Title 24

Calculations, lighting circuiting plan layout of normal & emergency circuits and panel

Schedules.

Power Plan: Coordinate equipment schedule with architect & client, power circuitry and

tele/data layout in the floor plan and data center, coordinating with architect& client for

UPS requirements for workstations and panel schedules. Coordinating with the

mechanical and plumbing engineer for providing power to fan-coil units, exhaust-fans

and water-heaters.

Single Line Diagram: Sizing of Transformers, conduits, circuit-breakers and coordinating

with tenant for layout of electrical panels, transformers in tenants’ electrical room.

-7-

Coordination with architect for architectural drawings, setting-up backgrounds for use in

MEP drawings.

PERES SURGERY CENTER (4300 Sq. Ft.)

Lighting Plan: Coordinate lighting fixture schedule with the architect & client, Title 24

Calculations, lighting circuiting plan layout of normal & emergency circuits and panel

Schedules.

Power Plan: Coordinate power and tele/data requirements with client for medical

equipments, designing power circuitry plan, coordinating with client for equipments on

emergency power; coordinating with mechanical & plumbing engineers for providing

power for condensing-units and electric water heaters.

Single Line Diagram: Sizing of incoming feeders, transformer, ATS, circuit-breaker,

generator and wires.

Coordination with architect for architectural drawings, setting-up backgrounds for use in

MEP drawings.

Ted Jacob Engineering, Pasadena, CA July 2002 – May 2003

Electrical Design Engineer

KAISER PERMANENTE MEDICAL CENTER

W est Wing Tower Add.– 200, 000 sq.ft. new expansion

* Prepare and design electrical plans including normal and emergency (life-safety

and critical) power distribution, lighting, controls, communications, nurse-call, public-

address and security systems. Interface with architect, mechanical and plumbing

engineers for system design coordination. Perform fieldwork survey to verify existing

electrical systems.

CHILDREN’S HOSPITAL CENTER

New Inpatient Tower, Sunset Blvd., LA – 400,000 sq. ft. expansion

* Prepare and design electrical plans including normal and emergency (life-safety

and critical) lighting systems. Interface with architect and mechanical engineers for

system design coordination.

Antieri & Assoc., Los Angeles, CA June 2001 – July 2002

Electrical Designer

* Perform electrical design of lighting, power and communication systems of tenant

improvement projects. Perform field survey to verify existing electrical systems.

-8-

Senbo Engineering Ltd., Calcutta, India M arch 2000 – May2001

Electrical Engineer

* Performing design and site supervision of Street Lighting system installation for

Calcutta Transport Infrastructure Development Project (Phase-II), Gariahat Fly-over

Project.

* Performing design and site supervision of H.T Cable laying and HT Feeder Pillars,

and Testing for Calcutta Transport Infrastructure Development Project (Phase-II),

Gariahat Fly-over Project.

EDUCATION/CERTIFICATIONS:

BSEE, Nagpur University, 1994 - 1998

Nagpur, India

Degree: Electrical Engineering

Engineer-In-Training,CA 2002

Electrical Design & Construction, 2002

UCLA-Extension, Los Angeles, CA

COMPUTER SKILLS:

Auto CAD 2013, Energy Pro5.1, MS Word, MS Excel, MS PowerPoint, MS Outlook.

RESIDENCY STATUS: Permanent Resident Card (Green Card)

REFERENCES: Available upon request.

-9-



Contact this candidate