Jeffrey Scott Hill

Subsea Construction Manager / Petrochemical Construction

Engineer

EXECUTIVE SUMMARY

World-class Operations Leader and Engineer with proven experience combining

expertise in Project and Construction Management, Process Improvement, Cost

Reduction, and Risk Management to create project solutions for

organizations worldwide. Extensive cross-functional and cross-cultural

collaboration. International experience managing projects and schedules of

all types for Gas Plants and Subsea Developments through Conception,

Design, Procurement, Fabrication, Testing, Construction, Hookup, Pre-

Commissioning and Commissioning stages.

Areas of expertise

Specializing in SCR's/Array Pipeline System Design, Development, Welding,

Non-Destructive Testing, Coating and offshore hardware and pipelay

installation (S-Lay/J-Lay configarations), Flowlines, Gas and Oil Export

Pipe/Pipelines - Pipe, Vessel, Tank and Plate Welding (setting/qualifying

of all types of welding procedures), Client Inspection Services through

Verification, Monitoring, Surveillance and Reporting for Fabrication,

Testing, Corrosion Coating and Installation, etc. Consulting for Subsea

Design, Development and Installation, Team Leadership & Motivation,

Distribution, Engineering, Subsea Hardware Fabrication and Equipment

Testing (FAT, SIT and SRT), Materials and Equipment Management,

Preservation of existing (Installed) and new equipment, Logistics,

Outsourcing, Procurement & Purchasing experience, Quality Control &

Analysis, NDE/NDT, Vendor Relations, Risk Management, Application

Development, AutoCAD Designer, Technical Support, Technical Writing of

Company SOP's, Procedures and Specifications, Risk Analysis, BOD, etc. DOT

Data Book Design and Development (Deliverables based on department and/or

Company requirements), Development of project P6 schedules through

Primavera and/or Microsoft Projects. All project planning aspects. Closeout

of Project Data Books, Subsea Geo-technical Survey Support and Final As-

Built s of as laid pipelines and Subsea Hardware.

Professional

Experience

LLOG Exploration/2H Offshore - Delta House Project

2014

Construction Manager and Project Consultant to 2H Offshore for all Welding

and Fabrication for the Titanium SCR Pipe Material

Responsible for managing all SCR Titanium Pipe, Coordinated all SCR welding

procedure qualifications (WPQ/PQR /WPS) as well as all production welding

for all 6', 8" 12" and 16" SCR pipe. Reviewed and approved the project ITP

and project schedule for all fabrication, testing and inspection aspects.

Coordinated all AUT NDE testing as well as all RT and MPI for SCR's and

components (Forgings/Hang-off Collar etc) with RTD Inc. Coordinated the

fabrication of the AUT Calibration Block for procedure and production weld

testing. Prepared all completed components for fatigue testing (low/medium

and high stress), heat treatment, final machining and dimensional surveys.

Enbridge Energy - Walker Ridge Projects - WRGS/Big Foot/Platform Hub South

Shoal 332A - 2013

Construction Manager, Project Coordinator and Completions and Turn-Over

Manager, Enbridge Energy - Houston, TX - Walker Ridge Projects (Walker

Ridge Gathering Systems and Big Foot Oil Export Pipelines

Responsible for managing all onshore fabrication, developing project

fabrication and installations schedules with all vendors and

subcontractors, qualifications of all welding procedures (WPQ/PQR/WPS),

NDE, Coating as well as installation of the 8" Risers tying into the S'S

332 A Platform. Managed the Electrical Isolation Joints from the +12 ft. to

topside. Managed the installation for the Umbilical from topside to PLET.

Turnover Manager for the project. Designed and developed the Operations

Turnover Plan for Enbridge Projects to handover to Enbridge Operations.

Review and approved all as-built surveys and dwgs. Assisted in closing out

all Riser and Topside documentation deliverables.

Intecsea- Chevron/CABGO - Angola, Africa- The Lucapa Project 2012 to 2013

Lead Subsea Installation Engineer, INTECSEA - Houston, TX - Chevron Lucapa

Project

Responsible for providing technical oversight for the Lucapa FEED project

installation studies scope of work. This includes development of

installation methods study for all major subsea equipment including

flowlines/pipeline and jumpers, subsea installation specification,

flowlines/pipeline testing and per-commissioning plan and specification,

and deep water flowlines/pipeline repair capability studies as well as

developing SCR installation methodology statements and plans for the Lucapa

filed development. Interface lead with the SEV FEED team for all subsea

hardware installation needs and requirements. Developed and maintained

projects schedules through FEED aspect by the use of Microsoft Projects.

Chevron - Nigeria Limited (CGUC) - Nigeria/Mid-Africa SBU- The Escravos Gas

to Liquid Project 2008 to 2012

PMT/Sr. Construction/Completions Engineer/Chevron Procurement and Materials

Manager in Nigeria/West Africa- Chevron Escravos Gas to Liquids Project

(EGTL

As Construction Engineer, lead entire construction projects from inception

through planning and scheduling activities, directing, design/field

modifications through real-time construction phases. Perform surveys and

test ground and water level through civil construction, preparing and

implementing project safety plans. Collaborate cross-functionally to

coordinate efforts with contractors, supervisor personnel, and design

professionals to streamline construction through all phases. Lead daily

meetings with sub and prime contractors. Oversee all testing functions as

well as Chevron POT interface for system hand-over's and project

completions. Leverage knowledge of erect ion and installation of structural

steel, mechanics, piping, all types of coating system, insulation, and

electrical systems. Guide testing aspects, including phonemic, visual and

hydrostatic testing, all forms of NDE; PT, MT, VT, RT, UT and AUT methods.

Coordinated and managed all material movement to and from the plant with

contractor and CVX procurement and logistical operations. Managed all

material for the site.

Chevron (CIEP) STAR Deepwater Petroleum- Nigeria/Mid-Africa SBU - The

Agbami Project 2005 to 2008

PMT/Sr. Construction Manager/Installation Coordinator/Chevron Procurement

and Materials Manager in Nigeria/West Africa

Served as Sr. Construction Manager for 12 manifold systems and 12 suction

piles fully fabricated in Nigeria. Oversaw installation and maintenance of

TEF flexible risers, umbilical's, jumpers, connectors, and steel/electrical

flying leads. Simultaneously acted as FPSO Buoy/Pile construction

completions coordinator, SIC SRT Testing and support coordinator, SEV

Coordinator for all FAT, SIT-2 and SRT testing. Led procurement activities

for all materials, and logistics coordination for the entire Agbami field

OPS. Guided each phase of construction, and ensured schedule adherence and

budget constraints. Audited contractor and subcontractor quality management

systems. Ensuring compliance with HAZOP and HAZID. Etc

Devon Energy - Project Devon Recovery

2005

Client Technical Specialist/Consultant - Subsea Coordinator

Developed offshore specifications for Saipem, procedures, cutting plans,

Sym Ops, and data books for all Platforms. Created and rolled out all diver

training procedures and conducted the diver training and cutting tool

program. Prepared all contractors, including Saipem, Cal Dive, Wood Group,

Wild Well, and E.W. Wachs. Led design of deck layout for Cal Dive Sat-11

diving system.

Dominion E&P - Triton/Goldfinger Field Development

2005

Client Technical Specialist/Subsea Consultant

Monitored welding processes on GTAW and FCAW for 6"& 10" PIP

flowlines and 6" SCR pipe. Reviewed and signed all

Welding parameters for Technip's ALX weld tracking machines for the

welding processes. Reviewed / provided personal

Input on all welding procedures per client request. Document

control. Monitored all welding processes and

Documentation for the installation of the PLET's, flowlines,

pigging lines, SCR's and flex Joints on-board the CSO

"Deep Blue" installation spool vessel.

Enterprise Field Services, LLC. - The Independence Trail and Hub Project

2004 to

2005

Client Technical Specialist/Subsea Coordinator

Coordinated offload of flow line and SCR pipe at TBC. Handled on-site

coating production, safety and NCR issues at TBC. Coordinated pipe

logistics, and supported through means of testing setting of all bending

parameters for induction bending, pipe bend mechanical testing, fabrication

welding for processes; GTAW and FCAW. Directed post heat treatment

hydrostatic testing, and mitigated all quality control and assurance

issues. Served as point of contact for client's on-site. Assessed real-

time project gaps and tailored specifications to remedy. Built all data job

books and induction bend as-built for the work scope per Enterprise and DOT

industry requirements.

Murphy exploration & production co. /Williams PARTNERS L.P. - front runner

pipeline project 2003 to 2004

SCR Array Developer / Installation Manger/Subsea Coordinator

Contracted again to Design, developed and construct the oil and gas SCR

algorithm array program for the 2 additional 12" flow lines with Williams

Partners/Gas L.P. Managed and Coordinated offshore field location pipe lay

through then various stages of construction from supply barge offload,

welding, NDT and coating. Commissioned lines developed as-built's and

closed out project requirements.

Murphy exploration & production co. - Medusa pipeline project

2002/2003

SCR Array Developer / Installation Coordinator

Designed, developed and constructed the oil and gas SCR algorithm array

program for the 2 -12" flow lines. Managed and Coordinated offshore field

location pipe lay through then various stages of construction from supply

barge offload, welding, NDT and coating Commissioned lines, developed as-

built's and closed out project requirements.

Additional Subsea and Management Experience provided upon request.

Professional Profile

Education Degree in Engineer Design - All

Engineering Principles (i.e. Structural, Civil, Mechanical,

Process Piping, Architectural, Project Management, AutoCAD

Design, etc.) - 2000'

Trainings Falack Ashford -HUET/Water Survival Training 2013- 2017

Marine Safety & Training -

Texas A&M University

BP gHSEr Safety - Field Safety Trainer

Marathon Oil Company - Permit writing and issuing certification class

Hazardous Materials, Hazcom, Incident & Investigating,

Advanced Safety Auditing, HSE Management Planning, EMS

Training.

Chevron Corp/CIEP - Safety Captain/Champion & Incident &

Injury Free (IIF) Trainer

TWIC Gulf of Mexico 2013-2018

American Welding Society (AWS) - Active member since 2004 / CWI

#04090364



Contact this candidate