*** **** *** ****** *******, KY *****
Phone 270-***-****
E-mail: ****************@*****.***
SUMMARY OF QUALIFICATIONS:
Over 22 years' experience in shutdowns, turnarounds and outages across the
power, petrochemical and industrial processing industries. Projects ranged
from fabrication, maintenance and repair work, to complete unit and system
installations. Familiar with ASME B31.3. Administered safety and auditing
programs with positive results. Proficient at managing crews on site.
Comprehensive understanding of project controls from estimating, to
bidding, negotiating, and administration of contracts. Successful track
record in maximizing profit. Especially skilled in relationship building
between contractors and plant personnel. Most efficient in Precip's and
boilers, all skills included but not limited to Estimating and Managing.
Very knowledgeable in planning using Microsoft project and Primavera 6. In
all of the following jobs my main objective was to keep personnel busy,
with also keeping our clients HAPPY.. I had to evaluate ALL JOB SITES to
see what equipment was needed and with my experience I had a good chance in
sales to save the company money with a profit to us and client.
PROFESSIONAL EXPERIENCE:
Sirius Technical Services 2014Dec-2015Feb
Was the liaison for Nucor Steel, they had a major tube leak which caused
major DAMAGE inside their furnace. Was also asked by the construction
supervisor to evaluate the FIELD operations, which included CRANE USE,
Scaffolding Awareness, Welding PROCEDURES and Safety.
Johnson Contracting Inc. Field Supt.
2014 Feb- 2014 Sept
Responsible of 25 welders and 12 fitters with 8 laborers. The majority of
work was outages, boilers, and Heavy wall pipe. Was also the safety manager
for the whole company to set the standards for our crew.
. Retubing of thirteen tubes at OMU Owensboro Kentucky
. Re-working of all the Duct work at Century Aluminum.
. Planned and scheduled using Primavera 6 fall outage for Big Rivers,
plant wide including our scope..
. Had to evaluate and sale ALL Projects to the Client's
Swift Worldwide Resources - Field Safety
2013June-2013 nov.
Responsible in charge for safety oversight of industrial boiler
refurbishment and selective non-catalytic reduction system for
environmental controls of boiler emissions consent decree program at
chemical plant in Texas:
. Boiler project was performed in unit with three other boilers in
continuous operation.
. Coordinated with plant safety and subcontractor's safety teams.
Performed routine formal safety audits, incident investigations, and
root cause analysis.
. Provided project close out, and construction scheduling consultation
to the Field Construction Manager.
. Made sure all Equipment on site was NEEDED and properly used.
A&D Constructors Inc. - Project Manager 2012-2013
Developed estimates for mechanical projects, process standards in
development of projects, established company quality control standards, and
ensured thorough project reviews.
. Charah SUL4R Plus Fast-track design-build soil amendment pelletizing
plant utilizing the synthetic gypsum from the scrubbers on site at
Louisville Gas & Electric Mill Creek Station.
. Charah SUL4R equipment consisted of dispersion dryer, conveyors and
elevators, pin mixer, rotary pan type pelletizer, bag houses, blowers,
tanks, pump skids, screen sizer, and fluid bed dryer.
. Kentucky Utilities Ghent Generating Station boiler re-tube projects.
. City of Springfield Missouri worked closely with Alstrom to develop,
estimate, and demo and repair three of their pecipitatorers. Was the
Project Leader for all three jobs and to coordinate 75 men.
Flatgard Mechanical - Project Manager - Estimator 2008-2010
Responsible in charge for maintenance crew located on various processing
plants. Scope of work also included high pressure steam piping, and
building pump skids..
. AK Steel Maintenance contract managed 45 man crew performing shift
live outages, boiler and high pressure steam line repairs, to complete
piping system projects. Worked hard to get Flatgard back into AK Steel
which I did thru sales and personality..
. Tyson Foods Managed 37 men crew for industrial process piping projects
in sizes from inch stainless steel to 22 inch carbon steel.
. Estimated and managed the replacement of both hot and cold side of
precip's for the utilities of North Carolina. Had 45 men to manage and
showed a 15% profit for project.
. Had to make ALL sale calls, since I was head of the mechanical
department. .
Titan Contracting - Construction Project Manager 2007
Responsible in charge for turnaround crews located on various power plants.
. General Electric two 635 MW coal fired units in California. Managed 85
man crew installed all piping high and low pressure piping systems,
and large bore HDPE pipe. First coal fired partnership with
California.
. Joppa Steam Plant located in Illinois converted bag house to fabric
filter system.
.
Gulf States Inc. - Pipe Foreman - Pipe Fitter 2005
Inspected projects to ensure that construction work was progressing
according to schedule. Resolved problems relative interpretation of
specifications and plans for contractors, and engineers. Responsible for
approving contractors' estimated construction schedules, progress report,
and requests for payment. Conducted final inspections of completed jobs.
. Dow Chemical located in Freeport, Texas. Process piping for new low
hydrocarbon plant process unit including pre and post weld thermal
treatment for welding up to 30 inch chrome-moly, and Victaulic piping
systems. Set various pieces of equipment.
Johnson Manufacturing - Pipe Fitter 2004-2005
Certified Welder for structural and pipe. Fabricated lube oil skids to be
sent off shore for BP oil rigs.
Industrial Specialists -Plant Coordinator/Planner/Scheduler 2002-
2004
Developed project schedules providing for all major elements of
construction. Provided regular monitoring of the construction cost, change
management, and variances for Dow Chemical located in Freeport, Texas.
. Managed turnaround for three sets of electronic mag cell units with 82
man crew.
. Liaison between the Owner and subcontractors for 145 man crew for
daily projects such as maintenance, rebuilding pumps, and process
piping.
Basic Industries Inc. - Coordinator/Planner/Scheduler 2001-2002
Scheduled and conducted pre-construction, construction, and progress
meetings. Developed project schedules, providing for all phasing of
construction. Performed analysis for labor required, and reviewed the
availability of appropriate categories of labor for critical phases, and
made recommendations for actions designed to minimize adverse effect of
labor shortages. Approved contractors' estimated construction schedules,
progress reports, and requests for payment. On-Site Liaison for company
and contractor companies to Owner. Bayer Chemical Plant located in Baytown,
Texas.
Miken Specialties LTD - Estimator 1999-2001
Estimating and cost tracking for scaffolding and insulation during plant
maintenance projects. Performed take off from blueprints and ISOs.
Attended all pre-construction meetings, safety meetings, and was company on-
site liaison with the Owner.
Industrial Specialists - Estimator 1997-
1999
Projects located at various plants on the Gulf Coast. Estimating and cost
tracking for scaffolding and insulation during plant maintenance projects.
Performed take off from blueprints and ISOs. Attended all pre-construction
meetings, safety meetings, and was company on-site liaison with the Owner.
Industrial Specialists - Site Safety Director 1995-
1997
Responsible for the health and safety performance of company personnel
while on-site. Evaluated many different aspects of company's health and
safety policies, programs, and documentation.
. Policies initiated prevented workplace accidents, and injuries.
. Improved labor and management relations.
. Improved client and contractor relations.
Titan Contracting - Construction Project Manager 1995
Responsible for process standards in development of projects, establishing
quality control standards, ensuring thorough project review. Knowledgeable
of construction building codes and regulations, space programming and
allocation cost analysis, and contract negotiation. Secured multiple
subcontract bids on projects, evaluated and awarded subcontracts. Reviewed
vendor bids and approved for procurement.
. Kimberly and Clark 435 MW coal fired units modifications and re-tube.
Also was the Project Manager for the replacement of ALL Idelers and
convection doors for their precip.
Destec Energy, Inc. - Assistant Safety Director 1994-1995
Owner's representative for industrial construction projects. Worked with
owners, management, and supervision of companies with poor health and
safety records to develop the attitudes, skills, and knowledge necessary to
improve company performance. Hired additional personnel as needed on jobs.
Provided detailed information on construction health and safety hazards and
the knowledge necessary to eliminate or control these hazards wherever they
are known to exist. Responsibilities included:
. Incident/accident records
. Investigations
. Workplace monitoring
. Safety committee minutes
. Emergency information
. Claims Data Management
. Security
. Work permits
. Fire System Records
. Chemical Inventory
. Training Records
. Inspections
Century Contractors West Inc. - Quality Control/Assurance 1993-
1994
Owner's representative for industrial construction projects. Developed and
wrote new business "pressure routines". Reviewed completeness of work
orders and ordered material for new business service installations.
Completed assessments of contractor crews to ensure quality and safety.
Ensured high ratings on customer satisfaction. Resolved job site issues
with contractors and Owners.
Titan Contracting - Project Manager 1992-1993
Developed project construction schedules providing for all major elements,
phasing of construction. Resolved problems of inspection, including
interpretation and modification of specifications and plans for
contractors, subcontractors, and engineers. Approved contractors' estimated
construction schedule, progress reports, and requests for payment.
Conducted final inspections of completed jobs.
Titan Contracting - Pipe and Tank Foreman 1991-1992
Proficiency in the welding of overhead, vertical and flat positions.
Experienced in burning and in the use of 11018, 7018 and 6010 rods. Being
promoted to Pipe and Tank Foreman my duties was to insure quality in
fabrication. Knowledgeable of the sizes of pipes and material such as
copper nickel, nickel, stainless steel, carbon steel, and various other
alloys. Able to read and interpret schematics and blueprints. Good working
knowledge of condensers, preheaters, and superheaters. Experience with the
ability to bend tubes, roll tubes, and resurface boiler handhold plates and
manhole covers.
WORK SPECIFIC TRAINING
. Basic Rigging Safety
. CPR/First Aid/BBP
. Offshore Safety
. H2S Safety
. Hazardous Waste
. Job Relative Injuries
. Lead Removal
. Welding
. OSHA 10 Hour Course
. TWIC approved
. Computer Aided Drafting
. MS Office Suite
. Primavera 6