*** **** *** ****** *******, KY *****

Phone 270-***-****

E-mail: ****************@*****.***

SUMMARY OF QUALIFICATIONS:

Over 22 years' experience in shutdowns, turnarounds and outages across the

power, petrochemical and industrial processing industries. Projects ranged

from fabrication, maintenance and repair work, to complete unit and system

installations. Familiar with ASME B31.3. Administered safety and auditing

programs with positive results. Proficient at managing crews on site.

Comprehensive understanding of project controls from estimating, to

bidding, negotiating, and administration of contracts. Successful track

record in maximizing profit. Especially skilled in relationship building

between contractors and plant personnel. Most efficient in Precip's and

boilers, all skills included but not limited to Estimating and Managing.

Very knowledgeable in planning using Microsoft project and Primavera 6. In

all of the following jobs my main objective was to keep personnel busy,

with also keeping our clients HAPPY.. I had to evaluate ALL JOB SITES to

see what equipment was needed and with my experience I had a good chance in

sales to save the company money with a profit to us and client.

PROFESSIONAL EXPERIENCE:

Sirius Technical Services 2014Dec-2015Feb

Was the liaison for Nucor Steel, they had a major tube leak which caused

major DAMAGE inside their furnace. Was also asked by the construction

supervisor to evaluate the FIELD operations, which included CRANE USE,

Scaffolding Awareness, Welding PROCEDURES and Safety.

Johnson Contracting Inc. Field Supt.

2014 Feb- 2014 Sept

Responsible of 25 welders and 12 fitters with 8 laborers. The majority of

work was outages, boilers, and Heavy wall pipe. Was also the safety manager

for the whole company to set the standards for our crew.

. Retubing of thirteen tubes at OMU Owensboro Kentucky

. Re-working of all the Duct work at Century Aluminum.

. Planned and scheduled using Primavera 6 fall outage for Big Rivers,

plant wide including our scope..

. Had to evaluate and sale ALL Projects to the Client's

Swift Worldwide Resources - Field Safety

2013June-2013 nov.

Responsible in charge for safety oversight of industrial boiler

refurbishment and selective non-catalytic reduction system for

environmental controls of boiler emissions consent decree program at

chemical plant in Texas:

. Boiler project was performed in unit with three other boilers in

continuous operation.

. Coordinated with plant safety and subcontractor's safety teams.

Performed routine formal safety audits, incident investigations, and

root cause analysis.

. Provided project close out, and construction scheduling consultation

to the Field Construction Manager.

. Made sure all Equipment on site was NEEDED and properly used.

A&D Constructors Inc. - Project Manager 2012-2013

Developed estimates for mechanical projects, process standards in

development of projects, established company quality control standards, and

ensured thorough project reviews.

. Charah SUL4R Plus Fast-track design-build soil amendment pelletizing

plant utilizing the synthetic gypsum from the scrubbers on site at

Louisville Gas & Electric Mill Creek Station.

. Charah SUL4R equipment consisted of dispersion dryer, conveyors and

elevators, pin mixer, rotary pan type pelletizer, bag houses, blowers,

tanks, pump skids, screen sizer, and fluid bed dryer.

. Kentucky Utilities Ghent Generating Station boiler re-tube projects.

. City of Springfield Missouri worked closely with Alstrom to develop,

estimate, and demo and repair three of their pecipitatorers. Was the

Project Leader for all three jobs and to coordinate 75 men.

Flatgard Mechanical - Project Manager - Estimator 2008-2010

Responsible in charge for maintenance crew located on various processing

plants. Scope of work also included high pressure steam piping, and

building pump skids..

. AK Steel Maintenance contract managed 45 man crew performing shift

live outages, boiler and high pressure steam line repairs, to complete

piping system projects. Worked hard to get Flatgard back into AK Steel

which I did thru sales and personality..

. Tyson Foods Managed 37 men crew for industrial process piping projects

in sizes from inch stainless steel to 22 inch carbon steel.

. Estimated and managed the replacement of both hot and cold side of

precip's for the utilities of North Carolina. Had 45 men to manage and

showed a 15% profit for project.

. Had to make ALL sale calls, since I was head of the mechanical

department. .

Titan Contracting - Construction Project Manager 2007

Responsible in charge for turnaround crews located on various power plants.

. General Electric two 635 MW coal fired units in California. Managed 85

man crew installed all piping high and low pressure piping systems,

and large bore HDPE pipe. First coal fired partnership with

California.

. Joppa Steam Plant located in Illinois converted bag house to fabric

filter system.

.

Gulf States Inc. - Pipe Foreman - Pipe Fitter 2005

Inspected projects to ensure that construction work was progressing

according to schedule. Resolved problems relative interpretation of

specifications and plans for contractors, and engineers. Responsible for

approving contractors' estimated construction schedules, progress report,

and requests for payment. Conducted final inspections of completed jobs.

. Dow Chemical located in Freeport, Texas. Process piping for new low

hydrocarbon plant process unit including pre and post weld thermal

treatment for welding up to 30 inch chrome-moly, and Victaulic piping

systems. Set various pieces of equipment.

Johnson Manufacturing - Pipe Fitter 2004-2005

Certified Welder for structural and pipe. Fabricated lube oil skids to be

sent off shore for BP oil rigs.

Industrial Specialists -Plant Coordinator/Planner/Scheduler 2002-

2004

Developed project schedules providing for all major elements of

construction. Provided regular monitoring of the construction cost, change

management, and variances for Dow Chemical located in Freeport, Texas.

. Managed turnaround for three sets of electronic mag cell units with 82

man crew.

. Liaison between the Owner and subcontractors for 145 man crew for

daily projects such as maintenance, rebuilding pumps, and process

piping.

Basic Industries Inc. - Coordinator/Planner/Scheduler 2001-2002

Scheduled and conducted pre-construction, construction, and progress

meetings. Developed project schedules, providing for all phasing of

construction. Performed analysis for labor required, and reviewed the

availability of appropriate categories of labor for critical phases, and

made recommendations for actions designed to minimize adverse effect of

labor shortages. Approved contractors' estimated construction schedules,

progress reports, and requests for payment. On-Site Liaison for company

and contractor companies to Owner. Bayer Chemical Plant located in Baytown,

Texas.

Miken Specialties LTD - Estimator 1999-2001

Estimating and cost tracking for scaffolding and insulation during plant

maintenance projects. Performed take off from blueprints and ISOs.

Attended all pre-construction meetings, safety meetings, and was company on-

site liaison with the Owner.

Industrial Specialists - Estimator 1997-

1999

Projects located at various plants on the Gulf Coast. Estimating and cost

tracking for scaffolding and insulation during plant maintenance projects.

Performed take off from blueprints and ISOs. Attended all pre-construction

meetings, safety meetings, and was company on-site liaison with the Owner.

Industrial Specialists - Site Safety Director 1995-

1997

Responsible for the health and safety performance of company personnel

while on-site. Evaluated many different aspects of company's health and

safety policies, programs, and documentation.

. Policies initiated prevented workplace accidents, and injuries.

. Improved labor and management relations.

. Improved client and contractor relations.

Titan Contracting - Construction Project Manager 1995

Responsible for process standards in development of projects, establishing

quality control standards, ensuring thorough project review. Knowledgeable

of construction building codes and regulations, space programming and

allocation cost analysis, and contract negotiation. Secured multiple

subcontract bids on projects, evaluated and awarded subcontracts. Reviewed

vendor bids and approved for procurement.

. Kimberly and Clark 435 MW coal fired units modifications and re-tube.

Also was the Project Manager for the replacement of ALL Idelers and

convection doors for their precip.

Destec Energy, Inc. - Assistant Safety Director 1994-1995

Owner's representative for industrial construction projects. Worked with

owners, management, and supervision of companies with poor health and

safety records to develop the attitudes, skills, and knowledge necessary to

improve company performance. Hired additional personnel as needed on jobs.

Provided detailed information on construction health and safety hazards and

the knowledge necessary to eliminate or control these hazards wherever they

are known to exist. Responsibilities included:

. Incident/accident records

. Investigations

. Workplace monitoring

. Safety committee minutes

. Emergency information

. Claims Data Management

. Security

. Work permits

. Fire System Records

. Chemical Inventory

. Training Records

. Inspections

Century Contractors West Inc. - Quality Control/Assurance 1993-

1994

Owner's representative for industrial construction projects. Developed and

wrote new business "pressure routines". Reviewed completeness of work

orders and ordered material for new business service installations.

Completed assessments of contractor crews to ensure quality and safety.

Ensured high ratings on customer satisfaction. Resolved job site issues

with contractors and Owners.

Titan Contracting - Project Manager 1992-1993

Developed project construction schedules providing for all major elements,

phasing of construction. Resolved problems of inspection, including

interpretation and modification of specifications and plans for

contractors, subcontractors, and engineers. Approved contractors' estimated

construction schedule, progress reports, and requests for payment.

Conducted final inspections of completed jobs.

Titan Contracting - Pipe and Tank Foreman 1991-1992

Proficiency in the welding of overhead, vertical and flat positions.

Experienced in burning and in the use of 11018, 7018 and 6010 rods. Being

promoted to Pipe and Tank Foreman my duties was to insure quality in

fabrication. Knowledgeable of the sizes of pipes and material such as

copper nickel, nickel, stainless steel, carbon steel, and various other

alloys. Able to read and interpret schematics and blueprints. Good working

knowledge of condensers, preheaters, and superheaters. Experience with the

ability to bend tubes, roll tubes, and resurface boiler handhold plates and

manhole covers.

WORK SPECIFIC TRAINING

. Basic Rigging Safety

. CPR/First Aid/BBP

. Offshore Safety

. H2S Safety

. Hazardous Waste

. Job Relative Injuries

. Lead Removal

. Welding

. OSHA 10 Hour Course

. TWIC approved

. Computer Aided Drafting

. MS Office Suite

. Primavera 6



Contact this candidate