CRAIG J.SCHMID
Human Resource Department
This correspondence concerns my desire to establish a productive working environment for myself
and a more profitable environment for my employer. I feel an established company of your stature
can benefit greatly in hiring an individual with my character and experience.
It is imperative in today’s construction environment for project managers and field superintendents to
be well organized people who can honestly evaluate a problem situation and turn it around without
affecting the profit margin. I take pride in my ability to accomplish this.
I would be interested in meeting with members of your firm to discuss an empl oyment opportunity,
which can benefit us both. I have been dealing with subcontractors and trade union s in the metro
area for over twenty years and have over thirty years experience in the construction field. Please feel
free to contact me at the below mentioned telephone number and or e -mail address. I thank you for
your time and look forward for a personal interview.
Respectfully yours,
CJS
Craig J. Schmid
P.O. BOX 423 • GREENWOOD LAKE, NY • 10925-0423
PHONE: 845-***-**** / *******@*********.** T
–2– December 12, 2013
Craig J. Schmid
845-***-**** • PO Box 423 Greenwood Lake, NY 10925 •*******@*********.***
Qualifications for Project Management / Field Supervision
Offers over twenty (25) years of experience in the construction industry, accumulating successes in
business administration, field supervision and project management. Commands super ior skills with
MS Word, Excel, and Project; Timberline and Expedition
Professional Experience
•Project Manager•
Permasteelisa North America 2012-2013
Responsible for all site activity with Local 580 Iron Workers (Installers), company liaison with clien t.
Site safety, material deliveries, logistics interacting / scheduling with other subcontractors.
All Seasons Siding Incorporated 2009 - 2012
Worked with owner to incorporate an estimating/accounting program, computerize existing office .
Managed multimillion dollar Architectural Sheet Metal projects utilizing union workforce from inception
to close-out.
DHI Construction Services, Inc. 2004-2007
On-site Project Manager, worked mostly high end occupied facilities with stringent time schedules.
Represented the company at site meetings, negotiated all change orders, approved sub -contractor
payment requisitions, valued engineered unforeseen conditions to the satisfaction of the client.
Smith McCord Construction 1999-2003
Represented the company on a Water Treatment Facility site, controlling daily field operations such
as scheduling, AIA billing, site meeting and subcontractors. Turned a profit, protected company
interests and bonding despite a two-year delay in the completion of a major project with nine (9)
prime contractors. Negotiated all contracts with subcontractors.
•Administration•
Custom Exterior Systems, Inc. 1995-1999 / 2007-2009
Recruited to handle all administrative business duties, including work contraction, contract review,
purchasing, scheduling, trade union relations, account payable/receivable and payroll . Set up
bonding and a line of credit to deliver the company into the public sector. Expanded the workforce
from three (3) to thirteen (13) union employees, concurrently trimming insurance costs.
•Owner•
Skytight Inc.
Directed all startup operations and all daily operational aspects of the business with one partner and
three employees. Created custom glass luxury building fixtures such as curtain walls, solariums and
skylights. Designed and built an 8,500 square-foot, two story atrium in partnership with a licensed
architect. Tripled business within four (4) months of start up, generating more than $750K in revenue
in one year. Established a remote franchise with Florian Glass in lower Manh attan.
Professional Development
Course work in Architectural Design at Orange County Community College – OSHA 30 – 16hr
Suspended Scaffolding
Willing to travel / Relocate
–3– December 12, 2013
Project List
Westchester Water Treatment Facility
3.8M / 18 month duration
Turned a profit, protected company interests and bonding despite a two -year delay in the completion
of a major project with nine (9) prime contractors. Negotiated all contracts and CO’s with
subcontractors, project included the insulated metal panel roof, all i nterior framing, finishes, fixtures,
millwork and epoxy coatings in the chemical areas.
Montefiore Hospital
1.6M / 120 day durations
Installation of an MRI unit in the lower section of the original hospital. This project included major
demolition to an existing occupied area. Construction of a technician area a waiting room and utility
room for the new MRI.
Rye Country Day School
850K / 90 day duration
Major roof project remove and replace / change 60 ton HVAC unit / construct new office space
/ Make acoustical adjustments to a newly constructed gymnasium.
Westchester Country Club
2.3M / 180 day duration
Major roof project remove and replace / change out Twelve (12) HVAC units / Major interior
renovation (keeping the building in use at all times) consisting of a new fitness area, men’s
and ladies locker room bathrooms, steam rooms and sauna’s / Upgrade gas and electrical
services.
King and Low Hayward Thomas School
680K / 45 day duration
Create new entry which included rerouting existing heating / electrical lines / concrete footings
and stairway / Construct new reception area / add additional HVAC.
Yorktown Jewish Center
1.3M / 8 month duration
Major building renovation, interior / exterior / remove and replace roof / new HVAC system / new
boilers / new electrical system / renovate existing classroom area / create a new entry / aluminum
storefront / Renovate a 5000 square foot social hall / create new office space / paving.
LaGuardia Air Control Tower
2.8M / Duration 22 months
Estimated, negotiated, sold the exterior composite metal siding and metal roofing, managed the
project to its completion including punch list and close-out and negotiations with the FAA,
Mott Haven School
5M / 2 year duration
Estimated, negotiated and sold this field assembled i nsulated metal wall panel system with integrated
windows, metal roofing, composite metal and zinc wall panels. Involved with all negotiation with the
SCA
Delaware Catskill Ultraviolet Water Disinfection Facility
Perform a takeoff for a specialty contractor (Roofing / Siding / Glazing), submitted a proposal,
negotiated and secured a 5 million dollar contract.