CURRICULUM VITAE
PERSONAL INFORMATION
First name/surname : TA VAN THANH
Sex : M ale
Date of birth : 17-Aug.-1980
Nationality : VIET NAM
Address : **/**/* *** *** STREET, VUNG TAU CITY
Mobile : +84-968-***-***
Email : ********@*****.***
EDUCATION & QUALIFICATIONS
- Shipbuilding in Marine at Nha Trang University (2000-2004).
- Accomplished of Korea DNV Academy course (in 2006).
- ISO training course at Hyundai-vinashin.
- QCC (Quality control circle program) training course at Hyundai-vinashin
- Accomplished of DNV Academy in Viet Nam course (in 2009).
SKILL & ABILITY
- More than 9 years of experience in Shipbuilding and Design for Korea and
Australia.
- Set up the Structure Standard for Huyndai shipyard and Strategic Marine
Australia.
- Prepared the General Arrangement Plan.
- Section Modulus calculation
- Bollard pull procedure
- Equipment number calculation
- Hull and Hull outfitting Weight estimate
- B.O.M for material
BUILDING FOR THE FUTURE
- Paint Area calculation and Paint Schedule
- Prepared the Lifting Arrangement and Yard Facility
- Prepared Launching Procedure and Lifting Procedure.
- Good in Excel, Word, AutoCAD 2D 3D, Solid-works soft, Photoshop, etc
- Speak English well in work, good written
- Used to work under great press of working in design site with high
responsibility
- Experience on standard activities and rules, class
- Yard layout controller
- Yard facility arrangement.
- Shed fit plan.
- Set up procedure & leader for Sea - Trials new shipbuilding.
- Prepare & calculate the rubber airbags for Launching.
BUILDING FOR THE FUTURE
WORKING EXPERIENCE (2005 TO PRESENT)
From Feb. 2011 to Present: Work for Strategic Marine_Senior Fitout design.
From 2005 to 2011: Work for Hyundai-vinashin shipyard (Hyundai Mipo
dockyard)_Design Assistant Manager-Structure/Fit-out leader.
The type of vessel and structural steel project I have been designing as list below:
40.4m CFV STOCK VESSEL
26.2m CATAMARANS STOCK VESSEL
26m FAST CRAFT NAVAL VESSEL
1) OFF-SHORE SYSTEM
2) BUILK CARRIER VESSEL
3) PATROL BOAT
4) RO-RO VESSEL
5) FERRY VESSEL
6) CREW BOAT(FAST VESSEL)
7) UTILITY VESSEL
8) LANDING CRAFT
9) BARGE STRUCTURE
10) WIND FARM SERVICE VESSEL
11) STRUCTERAL STEEL
12) SHIP REPAIR.
40.4m CFV STOCK VESSEL(SM stock aluminium vessel):
ü Incharged all Hull outfitting system including fitout, boundaries and furniture
design for Below main deck, Main deck, Bridge/Wheelhouse deck.
ü Leader for Fitout/Piping/Machinery/Electric/HVAC.
- Working with Senior Project manager of SM group/Triyards, General
Manager of SMS, Operation manager of SMS to arrange the Fitout system
base on MLC standard.
- Working with Southerly Design in Australia to build the Fitout system
according to structural and speed of vessel.
- Working with Piping/Machinery/Electric/HVAC to arrange all vessel
system arcordingly.
- Design the Fitout Boundaries.
- Design the 3D model/render for Marketing team of SM company.
- Design the details of Furniture in accommodation.
- Lead for Furniture team to fabricate production.
BUILDING FOR THE FUTURE
- Design all doors and hatches schedule and details drawing.
- Design Fire & protection drawing
- Design Fire safety plan drawing.
26.2m CATAMARANS STOCK ALUMINIUM VESSEL
ü Incharged all Hull outfitting system including fitout, boundaries and furniture
design for Below main deck, Main deck, Bridge/Wheelhouse deck.
- Working with Senior Project manager of SM group/Triyards, General
Manager of SMS, Operation manager of SMS to arrange the Fitout system
base on MLC standard.
- Working with Southerly Design in Australia to build the Fitout system
according to structural and speed of vessel.
- Working with Piping/Machinery/Electric/HVAC to arrange all vessel
system arcordingly.
- Design the Fitout Boundaries.
- Design the 3D model/render for Marketing team of SM company.
- Design the details of Furniture in accommodation.
- Working with supplier equipment.
26m FAST CRAFT NAVAL VESSEL (Singapore Government)
ü Incharged all Hull outfitting system including fitout, boundaries and furniture
design.
- Working with Senior Project manager of SM group/Triyards, Techinical
Project Manager SMS, SHOXS supplier to arrange the Fitout system.
- Working with Southerly Design in Australia to build the Fitout system
according to structural and speed of vessel.
- Design the 3D model/render as below:
3D Cockpit Model
3D Electronics Room Model
3D Passenger Space Model
3D Meeting Room Model
I. OFF-SHORE SYSTEM
ü Tam Dao 3 project, Hyundai 423 project for Viet-So Petro Viet Nam & Korean
client.
- Carried out all detail design for Hull outfitting of projects, make sure that
detail design produced in accordance with basic designs, rules and
regulations, specification and other requirements for ship clients.
BUILDING FOR THE FUTURE
- Controlled & made the BOM material.
- Design the traffic system and checked drawing from designer.
- Controlled the As-built drawing of all projects.
II. BUILK CARRIER VESSEL
ü 56K B/C, 37K B/C, 82K B/C, 60K B/C Vessel for Germany, Norway, Korea.
- Control schedule & quality of details drawing as per master schedule.
- Collected the feedback from production supervisor, clients, Register and
revised to suit with rules.
- Set up the schedule to Design the outfitting drawings and accommodation
drawing as per specification and rules.
- Calculated to moving the block for period erection.
- Weekly report to BOD.
- BOM & POR for material.
- Participated the Sea trial & carried out the noise measurement.
III. PATROL BOAT
ü 40m LTAC Customs Vessel - Ashmore Reef for Australian Government.
- Carried out all details drawing for Hull Outfitting & Accommodation, make
sure that details design produced in accordance with basic designs, rule &
regulations, specification and other requirement from Australian Custom.
- M ade the Hull outfitting, Accommodation, Fire & Safety Plan, Structure fire
protection drawings.
- Weight control.
- M ake the VCRM document.
- M ade the Moving plan.
- Calculated the Launching procedure.
- M ade the Inclining test & sea trial procedure including Noise level procedure.
- A ttend to Sea trial program.
- Sea trial report.
- A s built drawing & documentation.
IV. RO-RO VESSEL (Total 14 vessel)
ü Design Project engineer for elongation conversion 7,500 Pure Car & Truck carieer
Project with below function:
- Contact with Owner to do the plan, schedule, revised drawings, made
M eeting Memorandum
- Hull outfitting survey onboard
- Design hull outfitting system
- Revised the Safety plan drawing
BUILDING FOR THE FUTURE
- Participated Inclining test
- Participated Sea trial
V. FERRY VESSEL (Total 2 vessel for Oman)
ü 45.8M Ropax Catamarans Ferry for client National Ferries Company, Oman:
(The ferry has become the 2014 Work Boat Best Passenger Ferry)
- Carried out all details drawing for Hull Outfitting & Accommodation, make
sure that details design produced in accordance with basic designs, rule &
regulations, specification and other requirement.
- M ade the Hull outfitting, Accommodation, Fire & Safety Plan, Structure fire
protection drawings.
- Weight control.
- M ade the Moving plan.
- Calculated the Launching procedure.
- M ade the Inclining test & sea trial procedure including Noise level procedure.
- Successfully leader for Sea trial program.
- Sea trial report.
- A s built drawing & documentation.
VI. CREW BOAT(FAST VESSEL)
ü 40m Aluminium Crew Fast vessel (Malaysia, Mexico, Nigeria)
- Carried out all details drawing for Hull Outfitting & Accommodation, make
sure that details design produced in accordance with basic designs, rule &
regulations, specification and other requirement.
- M ade the Hull outfitting, Accommodation, Fire & Safety Plan, Structure fire
protection drawings.
- Weight control.
- M ade the Moving plan.
- Calculated the Launching procedure.
- M ade the Inclining test & sea trial procedure including Noise level procedure.
- Sea trial report.
- A s built drawing & documentation.
- Support design for Singapore yard.
VII. UTILITY VESSEL
ü 42m Aluminium/steel vessel (Malaysia)
- Carried out all details drawing for Hull Outfitting & Accommodation, make
sure that details design produced in accordance with basic designs, rule &
regulations, specification and other requirement.
- M ade the Hull outfitting, Accommodation, Fire & Safety Plan, Structure fire
protection drawings.
BUILDING FOR THE FUTURE
- Weight control.
- M ade the Moving plan.
- Calculated the Launching procedure.
- M ade the Inclining test & sea trial procedure including Noise level procedure.
- Sea trial report.
- A s built drawing & documentation.
VIII. LANDING CRAFT
ü 49.5m & 38m LB - Bhagwan LC vessel:
- Designed structural drawing for production
- Designed fit-out drawing base on Specification and Rule
- Designed Paint line details and Paint schedule
- Designed doors and hatches schedule
- Calculated lifting lug
- Calculated protection anode and arrangement
- Prepared As-built drawing for delivery
- Made the launch procedure
IX. BARGE STRUCTURE
- Designed fit-out drawing base on specification and rule
- Prepared launching drawing to delivery
X. WIND FARM SERVICE VESSEL
ü 26m Aluminium Catamaran vessel.
- Carried out all details drawing for Hull Outfitting & Accommodation, make
sure that details design produced in accordance with basic designs, rule &
regulations, specification and other requirement.
- M ade the Hull outfitting, Accommodation, Fire & Safety Plan, Structure fire
protection drawings.
- M ade the Moving plan.
- Calculated the Launching procedure.
- M ade the Inclining test & sea trial procedure including Noise level procedure.
- Sea trial report.
- A s built drawing & documentation.
- Support design for Singapore yard.
XI. STRCUTERAL STEEL
- Designed structrure for steel of project: Pontoons & Gangway, GLNG
pontoon, QCLNG poontoon, Rose bay pontoon, Neutral bay pontoon,
BUILDING FOR THE FUTURE
Hyntleys Pontoon, Double bay pontoon, Wiggins Island Surge Bin, Gladstone
Service, Brady Marine pontoon, Gremorne Point pontoon, Olympic Park
pontoon...etc.
- Prepared steel standard base on Rule and yard experience that they are
agreed by client and class
XII. SHIP REPAIR.
- M aking drawings for about 135 units of ship repair
- Floating Dock Extension (Vard shipyard project - 2013)
+ Calculated the pulling up of three blocks (Mega block 1: 824 Ton, Mega block 2:
814 Ton, Existing Floating Dock: 2400 Tone).
+ Air bags calculation to pull up the Mega block 1, Mega block 2 and Existing
Floating dock to Slipway.
+ Designed drawing to pull up Mega block 1, Mega block 2 and Existing Floating
dock to Slipway
+ Prepared drawing for Keeling Dock
+ Prepared drawing for launching
Date
S ign & Full Name)
BUILDING FOR THE FUTURE