Operations Executive; I get the job done! CYCLE TIME IMPROVEMENT: COST IMPROVEMENT
INVENTORY REDUCTION: QUALITY IMPROVEMENT : I will bring these skills to you.
Gerald L. Koch 19608 Pruneridge Ave # 7108 Cupertino, California, 95014, 408-***-****, ********.**@*****.***
Noteworthy achievement – At Tandem Computers, researched designed managed, development and
implementation of a JIT/lean manufacturing environment, in a high volume computer assembly facility. The outcomes
were as predicted.
Noteworthy achievement – At Tandem Computers Australia, working independently led an offshore project that
completed the roll out of the first known point of sales network.
o Significant challenges;
The ability to synthesis information, knowledge, personnel then bring them to bear
on any issue
Working in multiple off shore countries: Development of working cross functional teams
Staffing and selection of manufacturing team: Completion of the design process
Material specification and sourcing: Roll out plan
Outcome! The product was installed on time, performed as designed and the company objectives were met.
The rest is history. Think of this endeavor as you swipe your credit card at the gas pump .
Noteworthy achievement – At Verillink independently with little direct supervision developed a manufacturing and
quality team system that designed manufacturing methods utilizing JIT/lean concepts.
This method was successfully transported to and implemented as part of an outsourcing program implementation time
was 5 months, productivity and quality level continued at previous levels.
Noteworthy achievement – At Lockheed, independently researched drove the implementation of modern
manufacturing methods in an Aerospace environment, there were significant obstacles from designing tests to validate
that automatically assembled electronics were of equal quality to hand assembled units.
The project reduced the assembly time of ground station electronics by 100%. This made it possible to meet the
contract parameters on time and budget. The amazing factor is that this was completed in a union possible to meet the
contract parameters on time and budget. The amazing factor is that this was completed in a union environment.
Gerald L. Koch 19608 Pruneridge Ave # 7108 Cupertino, California, 95014, 408-***-****, ********.**@*****.***
Employment Summary;
University of Phoenix adjunct instructor: concurrent with positions at DACA, Meyer sound Wellex and
Verilink
Meyer Sound: Vice President Operations
Wellex Electronic Contract Manufacturing: Vice president of Manufacturing
Varian Vacuum: ultra high vacuum systems – R & D and design
De Anza Cupertino Aquatics Aquatic Sports Management Corporation
Education:
MBA – University of Phoenix
BSBA – University of Phoenix
AA – Canada College
Basic engineering – Colorado School of Mines