Charles Hart
Griffith, IN 46319
****************@*******.***
Phone: 219-***-****
PROFESSIONAL SUMMARY
A Process Improvement/Continuous Improvement professional with knowledge of cost saving strategies
and employee development programs implemented. Demonstrated a multitude of mathematical and
mechanical skills while working with such materials as dampers, barrier mats, fiberglass, fiber pads,
injected foam, and sheet metal damping assemblies.
Experience:
1996-Present
UGN Inc., Chicago Heights, IL / Valparaiso, IN
Process Improvement Specialist
• Implemented cost saving strategies resulting in $350,000 in additional revenue.
• Created and maintained corporate process documentation, such as Standardized work, Job
Break downs and process flow charts, along with supervising the training of operators in new
process steps and operations.
• Used TPS methodology to reduce cost savings in the mold department resulting in 350k a
year
• Used TPS and lean manufacturing to cut waste and labor cost by 10 %
• Created multiple training and educational programs to support employee development
• Demonstrated the ability to successfully design and fabricate new equipment as well as
the redesigning and modification of existing equipment.
1990-1996
White Castle, Dalton, IL
Assistant Supervisor
• Managed a successful team of employees in the support of the store manager
• Responsible of the financial operations of each shift
• Regularly managed all aspects of store inventory
• Trained new employees on company policies and procedures
• Ensured the store met sanitation guidelines in order to maintain a professional work
environment.
• Overseen all aspects of quality control
EDUCATION:
Lake Ridge School, Griffith, IN
GED-2010
CERTIFICATIONS:
• TPS systems, 5-S systems, FIFO inventory, Lean Manufacturing