TIMOTHY M. STODDARD II
*** ****** ******* **. ***.714 • Irmo, South Carolina 29063
864-***-**** • **********@*****.***
Project Management and construction field engineering skills consisting of planning and field experience with
pressurized water nuclear reactor AP 1000 reactor projects. Work experience includes work planning, estimating,
forecasting, and engineering standards for civil and mechanical construction engineering. Scope projects, establish
budgets, assess resources required, and compile project teams to execute project completion, without frequent
guidance. A proven history of deploying safety practices and processes that safeguard construction crews and
minimizing risk. Solid track record of delivering projects on time and under budget through strategy and cost control.
Understanding of business strategies and concepts using project management skills. Supervised and provided field
support for construction personnel in the following appropriate technical specifications and processes coordinating
with survey crews, design engineering, and architects to resolve field issues.
•Construction Engineering • Project Management • Mechanical Engineering • Field Planning & Support • Project Strategy • Civil Engineering • Safety • Mechanical Design • Project Prioritization • Budget Administration • Site Facilities
Management • Legal & Regulatory Compliance • Mechanical Systems • Mechanical Equipment Installation • Site Utility Installation • Pipe and Pipe Supports Installation • Concrete • Excavation Planning • Structural Steel• Rigging Lifting Plans •
EDUCATION & ACCOMPLISHMENTS
Bachelor of Science, Industrial Engineering
South Carolina State University, Orangeburg, South Carolina
ADDITONAL PROFESSIONAL TRAINNING
•ASME B31.3 & AWS D1.D, Process Piping Installation and Testing • Construction Welding Engineering Training •
NCCO Rigger Trained•
PROFESSIONAL EXPERIENCE
CB&I Jenkinsville, SC • 2013-Present
VC Summer Units 2 & 3 AP 1000
Turbine Building Lead Engineer
• Planned, coordinated, and implemented work scopes for
Civil/Structural/Mechanical/Piping/Electrical Turbine Island field engineering.
• Identified activities in schedule that had conflict due to constructability issues.
• Interface between Construction, field engineering, and designed engineering to ensure scheduling issues are resolved.
• Implemented a work package tracking system to identify planning issues.
• Provide management with daily reports of scheduled field activities.
• Developed, planned and coordinated resources to meet operational objectives
within Turbine Island.
• Observed and ensured construction practices as required for compliance of
construction operations/execution with federal, state, and local codes, industry standards, company procedures, and contractual requirements.
Mechanical/Piping Construction Engineer
• Planned, coordinated, and implemented work scopes for piping installation such as waste water piping, fire protection piping, and key component systems for Steam Turbine.
• In-process inspection of all construction activities (Including hydrostatic and pneumatic testing, backfill compaction and Welding).
• Experience with using P&ID and line list to properly install pipe, valves, and layout equipment per design.
• Experience with ASME B31.1 and ASME III piping installations.
TVA-Barlett Spring City, TN • 2012-2013
Watts Bar Unit 2 Competition Project
Mechanical Equipment Engineer
Plan and execute work for mechanical engineering discipline in the field to support construction on boiling water reactor designed project. As interfaced and coordinated activities with engineering, field construction supervision, and field subcontractors. Also supported field procurement, system turnover,
and commissioning for project completion.
• Installed and repaired plant fixed/rotating equipment such as pumps, gear
boxes, seals, etc. preformed equipment alignment for complete installation to
prepare for start-up system turnover.
• Observed and ensured construction practices as required for compliance of
construction operations/execution with federal, state, and local codes, industry standards, company procedures, and contractual requirements.
• Evaluated current construction methods and developed opportunities for
process improvement.
• Complete all updates within work packages and communicate to the field of
work change.
• Knowledge of welding techniques such as GTAW, GMAW, SMAW, and FCAW.
• Monitored piping installation and planning for delivery of construction materials
and equipment for an assigned work scope.
• Provided field support for rotating equipment to meet design qualifications and standards.
• Experience with ASME B31.1 and ASME III piping installations.
THE SHAW GROUP INC., Aiken, South Carolina • 2010-2012
MOX Project
Project Manager/Rigging Engineer
The MOX facility will take surplus weapon-grade plutonium, remove impurities, and mix it with uranium
oxide to form MOX fuel pellets for reactor fuel assemblies. These assemblies will be irradiated in
commercial nuclear power reactors.
• Delivered a Million Dollar construction project for the balance of facilities and analytical laboratory
facility. Managed scheduling and budgeting for minimal costs.
• Pre-Construction coordinator for civil, mechanical, and electrical contracts.
• Served as project manager for Tech Support Office Building and subcontract manager for Rigging, with a total of 8 construction contracts.
• Served as a main point for contact for technical questions for on and off-site subcontractors for facilities and equipment services.
• Knowledge of the subcontractor’s responsibilities and duties contained in subcontract documents.
• Coordinated contractor bid package reviews, and bid evaluations.
• Prepared and presented project metrics to show project and budget health for presentation to the client and upper management.
• Review subcontractor proposals and documentation to ensure subcontractor is operating within
the contractual procedures.
• Review specifications, purchase orders, subcontracts, inspection reports, delivery schedules, instruction manuals and technical data.
• Mentored and provided leadership in an environment which encouraged teamwork and growth.
• Provided input on jobsite logistics, organization, plant layout, equipment and manpower utilization.
• Assist the Project Superintendent in establishing and maintaining good safety and security
practices for the entire project in accordance with onsite safety program .
• Executed the company’s safety plan to eliminate and safety or hazardous issues that may arise in
the field.
• Provided drawings for load handling needs other than lifting to clearly convey the correct way to
execute the intended operation, such as hauling, jacking, trolleying, blocking or rolling.
• Developed rigging/lift plans for mobile, crawler, and overhead cranes.
Stoddard Plastering Co INC., Clinton, South Carolina • 2004-2009
Project Manager
• Develop scheduling plans for effective and efficient project completion.
• Consult with project owners, architects, and general contractors to coordinate construction progress.
• Managed projects from assignment to closeout/project critique, and ensured all phases of project met cost,
schedule, and quality requirements by specifications.
TECHNICAL SKILLS
SmartPlant, MicroStation, Premava 6, Bentley 3D Auto Plant, Imagination, AutoCAD, 3D lift Plan, Microsoft Office Suite, SharePoint.