RAGHUNATH H.M.
OBJECTIVE
E-MAIL Intend to structure my growth in pace with
************@*****.*** ever changing corporate environment in SAP
Supply Chain Management. Make my learning
curve to move in linear fashion along with
PRESENT ADDRESS: growth of my functional skills coupled with
450 W Doran St. overall personality development in order to
Apt # 222. face the challenging time ahead.
Glendale,
California
Zip code - 91203 EXPERIENCE
Total 17+ years of experience with 11 years
and 10 months of SAP experience and 5 years 4
CONTACT NO: months of Domain experience.
+1 - 646-***-**** Strong experience in the arena of Supply Chain
Management for varied industry segments.
Core expertise in the area of SAP Advance
MOBILE: Planning Optimization & SAP Production
+1 - 646-***-**** Planning.
A rich working experience in SAP at various
levels from end-user to consultant.
PERSONAL DATA Consistent performer with ability to take up
Date of Birth: 8th March responsibilities and deliver results.
1976 Strong organizing, negotiation and
Sex : Male interpersonal skills
Nationality : Indian
Marital Status : Married
EDUCATION QUALIFICATION
Bachelor in Mechanical Engineering from
PASSPORT DETAILS: B.L.D.E.A College of Engineering and
Passport No: G 7385559 Technology, Bijapur, Karnataka University,
Issued at: Bangalore Dharwad.
Year of Completion: 1997
Valid upto: 12st February Result: I Class with 74.2%
2018
ERP SKILL
SAP APO (version 5.1) in CIF, DP, SNP & PPDS.
SAP SolMan (Version 7.0).
SAP R/3 (version ECC5.0, ECC6.0, 4.7E & 4.6C)
in PP, QM & EHS.
TRAININGS ATTENDED
Attended training on Raw Material System at
Vishakapatnam Steel Plant and Internal
Auditor's on ISO 9001:2000.
Attended overview training on SAP xMII from
SAP Labs.
IT EXPERIENCE
PRESENT EMPLOYER: Tech Mahindra, USA.
Duration: November 2011 - Till date
Designation: Sr. Solution Architect
PROJECT 7: NUSA L1 production support in Demand and Supply Planning
Client Name : Nestle USA.
Team Size : 11
Duration : 19 Months
Environment : SAP R/3 ECC 6.0, & SAP APO 4.1 and 7.0 in DP,
SNP, PPDS and SAS.
Abstract : Project Lead for production support for DSP.
Responsibilities:
o Analyzing the business processes of the different business units within
Nestle USA
o Design solution and conduct Market Acceptance Testing for the
corresponding manufacturing sites
o Implement SAP APO PPDS and SAP R/3 PP modules and also performing
production support to plants and respective DCs for Nestle.
o Configuring APO and R/3 for master data like material masters, production
versions, work centers, BOM.
o Configuring the ECM for BOM, Master Recipe and PV.
o Configuring integration of SAP APO and SAP R/3 through the Core Interface
CIF.
o Configure PPDS transactions like PPT (Product planning table) and DS
(Detail Scheduling) board for planners to plan and sequence finite
production.
o Configuring PP - MRP planning run based on the scope of planning for
those materials that are not planned in APO.
o Implement Aggregated supply area planning (ASAP) to give national level
stock coverage to master production schedulers
o Setup subcontracting scenarios for co-manufacturers in APO PPDS.
o CIF monitoring and debugging.
o Analysis KPI reports such as weekly master scheduling attainment (MSA) to
measure performance of factories.
o Training users on SAP APO PPDS and CIF.
o Production support of plants, which are already live in SAP APO.
o Performing testing on activity like SPW21, SPW22, Kernel and Live cache
upgrade.
o Coordinating from Onshore to offshore team in resolving issues related to
CIF, MD and DP/SNP/PPDS.
o Performing Root cause Analysis on the repeated tickets of PPDS to reduce
the ticket generation.
PROJECT 5: Nestle SAP Functional L2 support in Demand and Supply Planning
Client Name : Nestle Europe and AOA.
Team Size : 11
Duration : 20 Months
Environment : SAP R/3 ECC 6.0, & SAP APO 4.1 and 7.0 in DP,
SNP, PPDS.
Abstract : Leading the L2 Functional Sustain activity from
offshore for Demand and
Supply Planning
(DSP).
Responsibilities:
o Worked as a SAP APO PPDS consultant in SAP APO version upgrade from 4.1
to 7.0 for AOA Region.
o Worked in resolving issues and change request activity related to
Interface, CIF, MD and SNP/DP/PPDS.
o Resolving the issues in PPDS within the SLA.
o Assisting the users in resolving issues related to Interface, CIF, MD &
SNP/DP/PPDS.
o Training Market after analysis on the repeated issue.
o Supporting APO and R/3 for master data like material masters, production
versions, work centers, BOM.
o Supporting integration of SAP APO and SAP R/3 through the Core Interface
CIF.
o Supporting buyer in MRP execution and analysis the exception.
o Supporting issues that come due to SAP APO PPDS Heuristics like standard
lot heuristics, multi-level MRP heuristic, continuous I/O heuristics and
scheduling heuristics such as schedule sequence heuristics, Custom Nestle
finite heuristic.
o Supporting PPDS transactions like PPT (Product planning table) and DS
(Detail Scheduling) board for planners to plan and sequence finite
production.
PREVIOUS EMPLOYER: IBM (India) Pvt. Ltd., Bangalore.
Duration: December 2007 - October 2011
Designation: Senior Advisory Consultant
PROJECT 5: SCIPIO (Supply Chain Initiative on Process & Inventory
Optimization) & SIGN (System
Integrated Global supply chain Network).
Client Name : Philip Morris International, Switzerland.
Team Size : 12
Duration : 38 Months
Environment : SAP R/3 ECC 6.0, 4.7E & SAP APO 5.1 in DP, SNP.
Abstract : Leading the Deployment, Run & Support activity
from offshore for SCIPIO
& SIGN.
Responsibilities:
o Offshore Project Leader for Deployment, run & support activity for SIGN &
SCIPIO.
o Coordinating/assisting the offshore team in resolving issues related to
Interface, CIF, MD & SNP (MTP & AP).
o Leading the team for connecting multiple R/3 & ECC instances with one APO
system with unit and integration testing.
o Coordinating with the Batch job monitoring team for SCIPIO & BW and
providing solutions to optimism the batch job performance.
o Involved in deployment activity for CIF, DP, AP and SNP for new Rollouts
(WAVE).
o Coordinate and involve in other actives like BCS testing, Livecache up-
gradation, System migration (SIGN) Interface change (E-gate to SAP PI),
GUI up-gradation, SMPSI modification from SMDL to SCIPIO.
o Involved in all the activity related to sunset of SIGN system.
o Presenting the report on Project performance on a Weekly & Monthly basis
for Delivery Managers and Client.
PROJECT 4: METHODOLOGY AND REVIEW
Client Name : Philip Morris International, Switzerland.
Team Size : 3
Duration : 9 Months
Environment : SAP Solution Manager 3.2 & 7.0.
Abstract : Leading the activity related to Migration/Merge,
up-gradation, Run & support
for SAP SolMan.
Responsibilities:
o Project Leader for SAP Solution Manager Migration (Merge) Project.
o Interacting/assisting the Client from Initial stage of migration project
for SAP Solution Manager Application from version 3.2 to 7.0
o Project Leader for all the enhancement Projects within the SAP Solution
Manager application (Synchronized Customization, BPM - Technical
Implementation, Work Center)
o Solving the Service requests related to Global Functions Solution Manager
within the SLA with RCA.
o Assisting technical team to develop ABAP reports.
o Testing the Functionality of the System for the support pack.
o Effectively Coordination with Client, Onsite and offshore team for all
the tasks.
o Preparation of Application Information Document and also regular update
based on Service & Change Request.
PREVIOUS EMPLOYER: Wipro Technologies, Bangalore.
Duration: August 2005 - November 2007
Designation: Associate Consultant in SCM
PROJECT 3: INFINEUM UK SUPPORT
Client Name : Infineum International Limited, UK.
Team Size : 26
Duration : 24 Months
Environment : SAP R/3 4.6 C, IS-Oil, SAP APO 4.1 in DP & GATP &
SAP BW 3.5.
Abstract : Handling all Fault tickets related to Global
Manufacturing in the existing
SAP landscape. Handling
change requests with complete ownership.
Responsibilities:
o Solving the Help desk Tickets related to Global manufacturing & Global
APO applications within the SLA with RCA.
o Performing Monitoring activity for CIF.
o Interacting/assisting the end users/power users for solving the tickets.
o Assisting technical team to develop ABAP reports.
o System testing and Integration testing for the support pack.
o Trained other team members in Global manufacturing application (PPPI, QM
& EHS) about the client business process.
o Preparation of System Maintained Technical Document and also regular
update based on fault & change requests.
o Involved in preparing questionnaire regarding the upgrade to client.
PROJECT 2: FOMSA BUSINESS SOLUTION
Client Name : Wales & West Utilities, UK.
Team Size : 50
Duration : 4 Months
Environment : SAP R/3 4.7 E - PM & PS.
Abstract : The primary objective is to
realise a single integrated system to manage,
maintain and operate
assets throughout Wales & West Utilities network.
Responsibilities:
o Preparation of Functional Specifications for MI reporting.
o Assisting technical teams in developing ABAP reports
o Preparation of UTP and assisting client in testing and User training
PREVIOUS EMPLOYER: eMatrix Enterprise Solutions, Bangalore.
Duration: April 2003 - July 2005
Designation: SAP PP Consultant
PROJECT 1: SAP R/3 IMPLEMENTATION & SUPPORT
Client Name : Adeep Locks Ltd., India.
Team Size : 14
Duration : 28 Months
Environment : SAP R/3 4.6C
Abstract : Studying the existing business process and
mapping it with SAP R/3 to suit
business requirement,
end user Training and support.
Responsibilities:
o Conducted detailed study of the production processes & strategies for
mapping into SAP.
o Worked in close coordination with Project head to finalize project
Methodology and the Project standards and Documentation.
o Configuration and testing business processes as per blueprint.
o Involved in the integration testing of PP module with other modules such
as FICO, MM, PM, QM and SD.
o Ensuring data-consistency during upload into SAP R/3 from legacy system.
o Core-user training.
o Preparing Functional specifications for non-standard SAP reports.
o Supporting core-users in end-users training.
o Solving day-to-day issues in PP module.
o Configuration Documentation as per ASAP methodology.
DOMAIN EXPERIENCE
Employer's Name: Chayagraphics (India) Pvt. Ltd., Bangalore.
Duration: November 2000 - March 2003
Designation: Production & Quality Manager
Responsibilities:
o Preparation of Monthly Production Planning based on quarterly & monthly
projection provided by marketing team.
o Preparation of Process Planning chart with proper monitoring of
production on shop floor to execute as per the production plan.
o In line quality control of Automatic Medical X-ray film processors &
Instradry during production
o Conducting technical training for service engineers & assembly
executives.
Employer's Name: Ramsons Garments Finishing Equipments Ltd., Bangalore
Duration: December 1999 - October 2000
Designation: Production Supervisor
Responsibilities:
o Preparation of monthly Production Planning based on the forecast from
marketing team.
o Coordination with contractors and arrangement of material required for
production of Industrial Washing Machine, Hydro Extractor, etc as per the
production Schedule.
Employer's Name: Bellary Steels & Alloys Ltd., - Integrated Steel Plant,
Bellary
Duration: December 1997 - December 1999
Designation: Executive - Mechanical
Responsibilities:
o Ordering, Engineering, Supply Expedition, Inspection, Testing, Erection,
Commissioning, Operation & Maintenance of Wagon Tippler - Side Arm
Charger, Stacker, Reclaimer & Transfer Car, 5 km Conveyor system for Raw
Material Handling System (RMHS) & 1 km Conveyor system for Coal Handling
Plant (CHP).