Post Job Free
Sign in

Engineer Management

Location:
Texas
Posted:
February 24, 2015

Contact this candidate

Resume:

Jose Gerardo Hernandez ******@*******.***

Houston, Texas • Phone: 832-***-****

SUMMARY

Accomplished System Integrator Engineer with over 12 years experience in the Oil & Gas, energy and

Food & Beverage manufacturing sectors. Self-starter with a strong technical background in IT and

automation systems; including control systems, Statistical Process Control, benchmarking, Quality

Assurance, risk management, logistic, stakeholder management. Customer oriented and deadline conscious

with strong communication skills.

HIGHLIGHTS

Proficient on Six Sigma methodology (DMAIC)

•

Supervisory Control and data acquisition, SCADA, PLC Allen Bradley, GE Fanuc Technology

•

Extensive experience on Microsoft O/S and Office software and MAC OS.

•

SAP R3/ BW (Certification MM, PP & SD)

•

High speed manufacturing environment (PET, Can and bottling)

•

CAREER EXPERIENCE

Catalog Coordinator – Weatherford. Houston, TX Jan 2013 – Present

Work assignments carried out for the Procurement Supply Chain Management Data Team

•

Review and process materials and parts master requests for engineering and non-engineering

•

components used in exploration, drilling, completion and Artificial lift systems.

Training and support on material and parts creation to internal customers working on drilling and

•

completions projects led by the company.

Identify data issues and concerns about materials, parts and components related to the assembly

•

and production process.

Risk engineering lead – SANTOS CMI Houston, TX May 2011 – Jul 2012

Technical-Financial Management for the power generation ‘Peaky Project’, budgeted for a total

•

expenditure of $77MM.

Worked closely with all relevant stakeholders, including engineering, procurement, construction,

•

human resource, logistic, finance and corporate management.

Critical path analysis included technical, commercial, logistics and operative aspects.

•

Mitigation plan was proposed to overcome key project challenges. Implementation was

•

accomplished thru different IT and statistical applications.

System architecture was devised for IT system, including the Internet Server.

•

Assessed IT and Telecommunication contractors to ensure technical specification, budget and

•

schedule was met. Activity included the interface with project management and contracting and

procurement team.

Negotiated terms and conditions for main IT and telecommunication contractors, including

•

mobilization and demobilization to site.

Production Coordinator – Pepsicola Venezuela Jul 2005 – Jul 2008

Successfully led turnkey solution for the TETRA PAK technology manufacturing line, which

•

included a whole new juice presentation PepsiCo Venezuela.

Managed the soft drink 5-line production plant; implementing a continuous improvement

•

approach, which led to a 15% increase in throughput.

Continuous customer support to define optimum delivery schemes to optimize further production.

•

Implemented QA/QC process to improve HSSE performance. This involved training over 80

•

people, including operation and maintenance personnel.

Regular meetings with relevant stakeholders were key to implement proposed improvements.

•

Established plant productivity baseline.

•

Responsibilities included KPI definition and data-entry process to SAP MM.

•

Coordinated third party contractors to fulfill relevant maintenance activities, including SAP

•

process.

Gap Analyst – Pepsicola Venezuela Feb 2004 – Jun 2005

Implement methodology to determine baseline productivity (benchmark world wide with

•

others PepsiCo Plants) and a continuous improvement process for a bottling plant in

Caucagua, PepsiCo Venezuela

Achieve levels of productivity from 45% to 90% in a year period reducing substantially

•

downtimes occurred during the manufacturing process

Mitigate downtimes through the Sig Sigma methodology

•

Consolidate the communication channels between the departments involved on

•

manufacturing process

Develop the Gap Analyze Methodology (DMAIC) to the manufacturing process, fitting this

•

for two different industrial process

Responsibilities included Gap Analysis, IT platform architectural design and integration with

•

PepsiCo Venezuela corporate systems

Advocate to the continuous improvement program, which included all production line

•

aspects, e.g. logistics, distribution, 3rd party contractors, etc.

Executive summary and SAP BW reports to manufacture and corporate management.

•

Assign roles to all members involved into the improvement process

•

Quantitatively analyze data from every downtime in order to create activities that increase

•

the rehabilitee of the process

Key contributor to obtain the ‘Best World-wide PepsiCo Bottling Plant’ award in 2005 and

•

2006 for the Caucagua bottling plant in Venezuela.

Field Engineer - Omicron Feb 2002 – Mar 2003

Field engineer specialized in multi-phase flowmeter, flow computers and RTU’s installation,

•

commissioning and troubleshooting.

Led bid process to provide 1000 flow computers to Halliburton via HB joint venture in 2002.

•

Supported the IT and telecommunication upgrade project aim to improve customer services. Task

•

included installation and commissioning of multiple servers and wireless communication

infrastructure.

Instrument Engineer – Reelvensa Jul 2001 – Jan 2002

Control system and SCADA detailed design, installation and start-up of ‘Alturitas II’ flow station.

•

Automation included water treatment and injection control and monitoring. Customer BP

Holding Limited, Venezuela.

Design, installation, configuration and programming of Allen Bradley PLC based control system.

•

Integration included Panelview HMI, Scada Wonderware Intouch. Work was part of thesis

dissertation for undergrad studies.

Commissioning and start-up of RTU based network, integrated to existing SCADA system and

•

Central Control Room. RTUs were intended to monitor and control remote water injection

facilities.

EDUCATION

Polytechnic Institute University Santiago Mariño, Venezuela Nov 2002

•

Bachelor in Sciences Mayor on System Engineering



Contact this candidate