Brownsville, TX. Cell (956) 455 – 0785

*************@*******.***

Mario A. Peña - Leal

Summary Seasoned manufacturing professional with extensive experience in

warehouse supervision and maintenance supervision in injection

molding area. Additional skills include plant maintenance, preventive

maintenance program implementation and corrective actions

maintenance program.

Experience

Dec 2012 – Feb-2014 Igloo Products, Corp. Katy, TX.

Manufacturing area Sup.

Supervising the manufacturing area which includes the molding

injection area with 20 presses in different capacities and

materials from 200 tons to 1500 tons. Blow molding area with 20

machines, 15 to 25 operators, 4 process technicians, 2

manufacturing lead operators, 2 materials handlers and 2 forklift

drivers

Jun 2003 – Jun 2012 Milwhite, Inc. Brownsville, TX.

Molding area & warehouse supervisor

Managing all activities related in molding area as maintenance, process

control, production scheduling using 800 tons capacity molding machines.

Managing warehouse activities as keep up dated inventory, control IN /

OUT material, etc.

Feb 2001 – May 2003 Titan Tire Corp. Brownsville, TX.

Electrical maintenance sup.

In charge to provide corrective maintenance and preventive

maintenance to all electrical equipment and controls. Five maintenance

technician under my direct supervision.

Sep. 97 – Feb 2000 Cepillos de Matamoros S.A. H.

Matamoros,Tam.

Maintenance Supervisor

Injection and blow molding area, corrective and preventive maintenance

program implementation, salary and wage employees under my direct

supervision. Wide experience in hydraulics & pneumatics systems and

plc’s controls. Our objective: Provide an effective execution to our

responsibilities.

Mar 93 – Sep. 97 Plas Internacional S.A. H.Matamoros,Tam.

Molding superintendent

First assignment, follow the installation and startup of all molding area

equipment (injection molding machines, resins dryers, grinders, air

compressor, etc.) After completing this project, responsibilities changed

and became the molding superintendent. That included managing

production and inspection area, process and maintenance area,

supervised 60 employees (wage and salary).

Product: Automotive windshield plastic wipers.

Jun 81 – March 93 Rimir S.A. H.Matamoros, Tam.

Electrical equipment engineer

Began working as the plant was being constructed. My first assignment

was to supervise the installation and startup of all electrical equipment.

Main responsibilities; maintain all the electrical equipment in excellent

condition for efficient operation, such as ovens, conveyors. Paint booths,

air make up equipment, heaters, molding machines (RIM process), PLC’s,

electrical substations and all electrical controls. This was accomplished by

having a preventive maintenance program, which started and was applied

under my supervision.

Product: Polyurethane bumpers fascias for GMC.

Project engineer. Follow up the s-rim plant project, my responsibilities

included the supervision of erection and construction work, mechanical

installation of all equipment, installation of all services (electrical

substations, water, nitrogen, air compressed, etc.). Included start up all the

installed equipment and maintain efficient operation. At the end of this

project, I became maintenance supervisor

Education 1974 - 1978 Tecnológico de Matamoros H.Matamoros,Tam.

BS/EM 1978 Electromechanical Engineer

Interests Hunting, shooting practice.

Civil status Married

Spouse name: Maria A. Peña

Children: Claudia A. (27)

Mario A (24)

Adrian G.(22)



Contact this candidate