MICHAEL C. DONOVAN
PO Box ******
Hesperia, CA **340
Mobile 760-***-**** Msg: 760-***-**** *******@*****.***
EXPERIENCE
Global Environmental Products Inc. Assembly Technician
*/**** - */*014 San Bernardino, CA
Assembly production work of Diesel, hybrid and CNG powered street sweeper
vehicles from beginning line, sub-assembly, final completion and rework
through quality control requirements. In-house hydraulic hose production,
with high personal integration of lean management and constant upgrades to
and including engineering department growth. Using related work experiences
to create in-house engineering layouts for quality control, ISO and R&R
improvements.
ICR Staffing Services Inc. Customer Service Representative
5/2010 - 9/2012 Victorville, CA
Handled potential candidates for work employment utilizing phones,
computers (extensive typing, MS Word, Excel and Outlook capabilities.),
network searches, drug, background and experience screening for clients'
needs. All facilities of Human Resources and employment opportunities.
*Facilitated contract position with Scott Turbon Inc. running a water jet
cutting machine - 5 months.
Ecolite Concrete USA, Inc. Jr. Cad Modeler / Logistics Supervisor
3/2007- 1/2010 Moreno Valley, CA
Auto-CAD re-design of architectural designs and plans to meet production,
manufacturing plant support through re-engineering as needed. Management
support across all levels; material needs, safety issues, IT and field
operative support with required documentation and computer support.
Logistics from material to finished product design, direct operations with
trucking firms local and nationally, understanding of both state and DOT
federal laws. Load designs, capacities and time management with client.
Previous; Operations (running procedures, staff management, safety
orientation and maintenance) of an automated computer controlled cement
batch plant. Quality control of the created product through compression
test equipment and related fields. Quality Control / Batch Operations /
Maintenance - Repair: Handled the batch controls and quality control
operations for a proprietary concrete mix design. Handled HDMI based
programming and evaluation of design flows through mixing units for
emulsification standards.
trueCycle, Inc. Quality Assurance Lead Tech
9/2006-4/2007 Victorville, CA
Supported a network system through the implementation of new computer
standards and company procedures. Acquired, refurbished, sold e-waste
based material (i.e. computers, DVD players, etc.) back to the public.
Double M Flooring Flooring Craftsman
1/2005-4/2006 Phelan, CA
Installing carpeted flooring and tile in new facilities through the use of
power tools, logic and reading of blue prints.
Rick's Auto Automotive Technician
1/2000 - 11/2004 Phelan, CA
Auto technician, everyday repairs, replacement and removal of automotive
components, diagnostics; both foreign and domestic vehicles and trucks
Casino Data Systems Inc. Slot Machine Production
10 / 1994 - 3 / 1995 Las Vegas, NV
Building of slot machines and such equipment from beginning production to
end with Quality Control standards & operations, use of hand tools, trouble
shooting, acquirement of equipment & employee training. Complete logistics:
shipping & inventory control through warehouse.
EDUCATION
Westech College AUTO CAD program 2006-2007
Victorville, CA
Victor Valley College General studies 1998-2000
Victorville, CA
No Degrees - Computer Information Systems, General Automotive
Serrano High School Diploma 1990-1992
Phelan, CA
CERTIFICATIONS
Automotive air conditioning certification through Mobile Air Conditioning
Society (MACS) 7 / 2003 #874023
900 Auto CAD hours completed certification from Westech College
SKILLS
Administrative & management level experiences. Working with computers; both
hardware & software based issues (troubleshooting). Windows operating
systems 95, 98, ME, XP, 2000, Vista experience, MS Word, PowerPoint, Excel;
Viso & Project. DOS oriented - OS problem solving. Software & Hardware
installing /computer Auto CAD- mechanical & architecture based design.
Extensive hand & power tools experiences, machinery maintenance and direct
setup & use, soldering experience. Schematics & blueprint experience. Data
entry 10 key / typing 35 WPM Lean management, production flow.