HARROLL MICHAEL TIPTON
DESIGNER - ******
SUMMARY
** ***** ** ********** ** plant design which includes working in the
pharmaceutical, chemical, petrochemical, power and nuclear power
industries. Work experience includes: design of electrical schematics,
panel layouts, DCS cabinet layouts, equipment and instrument location
plans, loop sheets, conduit routing plans, and P&ID layout and
development. Possess a sound knowledge of related Computer Aided Drafting
and Design. AutoCAD Release 2008, latest version of Intergraph and
MicroStation 95,SE, J, Plant Space, V8, SmartPlant P&IDs and SmartPlant
Electrical.
EDUCATION
Blountville Community College, Blountville Tennessee - 1989
A.A.S. in Electrical-Electronic Technology - 1989
East Tennessee State University Johnson City, Tennessee 1974-1975
CERTIFICATIONS/LICENSES
Union Carbide Oak Ridge, Tennessee - Certified Pipe Welder
COMPUTER SKILLS
Computer Aided Drafting and Design. AutoCAD Release 2008, latest versions
of Intergraph and MicroStation 95, SE, J, Plant Space, V8, SmartPlant P&IDs
and SmartPlant Electrical
EXPERIENCE
April 2011 - December 2014
Nana Worley Parsons (Prudhoe Bay, Dead Horse Alaska)
As-Built Designer generating Process Safety Documentation (P&ID's and
equipment layout drawings) per OSHA 1910.119 through field walk downs and
verification.
Responsible for development and drafting of piping and instrumentation for
as-built P&ID's.
January - March 2011
Progress Energy, Brunswick Nuclear Plant, Southport, NC
Designer
Responsible for field walkdowns and generating P&IDs and equipment layouts
using MicroStation V8.
April 2009 to December 2011
Nana Worley Parsons (Prudhoe Bay, Dead Horse Alaska)
As-Built Designer generating Process Safety Documentation (P&ID's and
equipment layout drawings) per OSHA 1910.119 through field walk downs and
verification.
Responsible for development and drafting of piping and instrumentation for
as-built P&ID's.
June 2008 to April 2009
The Shaw Group contracted through Caliper, Charlotte, North Carolina
Working in the Fossil group generating P&ID'S using SmartPlant P&ID.
May 2006 to June 2008
General Electric
Nuclear E&I Designer
Designing Logic, Simplified Logic Diagrams With 3 Key Master, Generate
ESBWR P&ID Symbology Standards and P&ID's with SmartPlant P&ID, Design
Control Document figures both flow and General Arrangement drawings &
drawing number and Title Block standards, Writing Procedures for NUMAC
lab., electrical drawings and instrumentation drawings for the new
generation GE Boiling Water Reactor
April 2005 to May 2006
Direct with Shaw-Stone and Webster @ a Honeywell Plant in Chester, VA
Process E&I Designer
Generating Process Safety Documentation (P&ID's and equipment layout
drawings) per OSHA 1910.119 through field walk downs and
verification. Responsible for development and drafting of piping and
instrumentation for as-built P&ID's.
March 2005 to April 2005
Progress Energy, Raleigh, NC
Drafter
Working in the Line and Substation department. Drafting on MicroStation V8
and AutoCAD 2005.
March 2004 to November 2004
Penta Engineering, Charlotte, NC
Process E&I Designer
Generating Process Safety Documentation (P&ID's and equipment layout
drawings) per OSHA 1910.119 through field walk downs and verification for
Pharmachem Laboratories located in Edenton, N.C. Responsible for
development and drafting of piping and instrumentation for as-built P&ID's.
July 2002 to October 2003
CDI Under contract to Bayer Pharmaceutical Division, Clayton, NC
Main priority working in the Electrical and Instrumentation Department
creating and updating Drawings.
Filled in when needed, working in the Architectural Department Laying Out
Buildings and Modular Buildings. Used Documentum to move drawings from
Project Drawings to System Drawings.
March 2000 to May 200
Modern Tech SI
Under contract to E.I. DuPont DE Nemours section Nylon Research and
Development
Worked on the conversion of MicroStation-J, P&ID's to Plant Space
P&ID's. Update or create as required PLC and DCS I/O schematics associated
with P&ID's. Update or create as required SCR and inverter control
schematics associated with P&ID's. Field walk down existing systems to
create P&ID'S.
February 1999 to March 2000
Direct with Penta Engineering. Charlotte NC
Process E&I Designer
Generating Process Safety Documentation (P&ID's and equipment layout
drawings) per OSHA 1910.119 through field walk downs and verification for
the Merck Elkton Virginia plant. Responsible for development and drafting
of piping and instrumentation for as-built P&ID's.
April 1992 to Jan 1999
Contracted to RUST Engineering then to Bechtel, Corp., Rock Hill, SC
Process E&I Designer
Generating Process Safety Documentation (P&ID's and Instrumentation data
sheets) per OSHA 1910.119 through field walk downs and verification for the
Celanese Celriver Plant. Responsible for development and drafting of
piping and instrumentation for as-built P&ID's. Involved in instrument and
electrical upgrades in the Celanese Rock Hill Chemical Terminal.
August 1991 to January 1992
Contracted to Badger, Cambridge, MA
Process E&I Designer
Designing and generating P&ID's on Intergraph for the Petrochemical
Industry.
January 1991 to July 1992
Contracted to Virginia Power, Glen Allen, VA
E&I Designer
Designing demolition and controls drawings from as-built, and laying out
DCS Cabinets on Intergraph.
June 1989 to January 1991
Yeargin Engineering, Eastman Kodak, Kingsport, TN
E&I Designer
Designing loop sheets and conduit routing plans on Intergraph,
and development of bills of materials used in purchasing for Holston
Defense Projects.