LEWIS C. OUZTS
Weirsdale, Fl. **195
352-***-**** Email: ******.*@*******.***
352-***-****- cell
Project Superintendent
May 2013 to Present
J Kokolakis Contracting, Inc.
202 E. Center Street
Tarpon Springs, FL. 34689
Northwest Transfer Station
Constructing a new Solid Waste Transfer Station building over an existing
building, then demoing the old structure from the inside of the new
structure while not disturbing the operation of the Transfer Station and
construction of new truck scales, cranes, access roads, pavement overlay
of existing, underground utilities, hydro demolition of existing building
slab on precast panels and pour back of 8,000 psi tipping floor, fire
alarm, gas detection, new electrical and fire pump buildings to support the
new facility.
Project Superintendent
September 2012 to May 2013
Satterfield & Pontikes Construction
Suite 105
Veterans Blvd.
Kenner, LA. 70062
PK-12 School Phoenix, LA - $28 Million
Correcting hurricane damage to a new 225K sq. ft. school project for FEMA.
Site Superintendent
June 2011 to June 2012
CAPE Inc.
6851 Oak Hall Ln. Suite 200
Columbia, MD 21045
Dobbins ARB, GA - $7 Million
Design/Build contract to modify F-16 hanger to Air Ground Equipment
Maintenance.
Hanger 10 Andrews AFB, MD - $12 Million
Design/build contract to modify post WWII hanger to accept USAF KC 135
aircraft tanker.
General Superintendent
May 2003 to April 2011
Yates Construction
115 Main Street
Biloxi, MS 39530
Battle Command Training Center - $30 million
Fort Bragg, NC 28307
General construction of a training and educational center for tactical
operations, after action review, offices and work cells for US Army Corps
of Engineers.
Design Build Package 11 - $80 Million
Kessler AFB, MS 39503
Design/build of a Fire Crash Rescue station, new Student Dormitory, Golf
Course Clubhouse and Community Center to replace facilities damaged by
hurricane Katrina.
A3 Test Stand - $16 Million
Stennis Space Center, MS
Fabrication and erection of steel structure (3100 tons) for NASA's new J-2X
rocket engine test stand used in the Constellation program.
Margaretville Casino and Hotel - $700 Million
Biloxi, MS
Construction of a casino and hotel on a 20' podium on the beach. Completed
$150 million when investor's finances were cut off by the banking industry.
Seminole Hard Rock - $127 Million
Tampa, FL
144k sq.ft. expansion of existing casino, new gaming area, steakhouse,
buffet, 2 working kitchens, 1 viewing kitchen, 2 bars, executive offices
and 7 story parking structure.
LSU Tiger Stadium West Side Expansion, $76 Million
Demolition of the upper elevated deck and replacement with larger deck,
expansion of existing stadium.
Evangeline Down - $60 Million
Construction of a Casino and Horse Racetrack on 525 acres in Opelousas, LA.
Supervising all subcontractor trades, big box construction with a 1,647
slot machine gaming area, 5 restaurants, 3-story grandstand.
Superintendent
August 2002 to May 2003
AMEC Civil LLC
1633 Broadway
New York, NY
John Kerr Lake Bridge - $78 Million
Erection of a 4900' bridge crossing John Kerr Lake Reservoir for Highway 58
by-pass in Clarksville,Va.
Site Manager
Sept. 2000 to August 2002
Metso Minerals
4800 Grand Ave., Pittsburgh, PA 15225
Sincor Oil, Jose, Venezuela - $36 Million
Installation of a Dual Orbiting/Slewing Shiploader system for Sincor Oil's
Coke Terminal. This machine is a prototype and all conveyors were erected
on a dock/jetty 2.5 kilometers offshore to load 65K metric ton ships.
Finished 4 months ahead of schedule.
Florida Power Corporation, Crystal River, FL - $23 Million
Demolition of 5-story transfer towers, foundations, chutes, conveyors and
2.5 million-pound bucket wheel stacker/reclaimer. Civil/site work for new
coal handling system. Erection of new transfer towers, chute work, mile
of conveyors and 2500 ton per hour new bucket wheel stacker/reclaimer.
Senior Project Manager
Oct. 1992 to Aug. 2000
(3 years) (5 years)
DCL Construction Inc. Metropolitan Construction Inc.
Orlando, FL Maitland, FL
(Both companies owned by same people)
General Construction Projects;
Hotels Health Care Centers Schools
Restaurant
LaQuinta (4) Beverly Health Care: St. Pete Jr. College
Treats
Fairfield Inn Tampa Lk Brantley High
Barney's
Springhill Inn Rosemont Deland Middle Uno
Pizza
Embassy Suites (3) Lake Underhill Banks Water
Treatment Plant
Summer Bay (2) West Palm Beach First Union (4) Dyal
(City of Cocoa)
Tenant Build Outs Orlando International Airport
Church
Sunglass Concession Customs Air Side (A & B) St. James
Assembly
Tie Rack Baggage Claim
Warehouses
Warner Bros. New Escalator Foundations (4) Lucent
Technologies
Plant Manager
Sept. 1990 to Oct. 1992
Carolina Steel Corporation
795 Industrial Park Road, Bristol, VA 24201
Complete responsibility, including production, maintenance, budget,
payroll, consumables and utilities for a 400,000 sq. ft steel fabrication
plant engaged in fabricating plate girders for bridges.
Superintendent / Project Manager
Dec. 1988 to July 1990
Industrial Steel, Inc.
Steel Erection of Weather Protection at complex 39A for the Space Shuttle,
platform install on complexes 40 & 41 and various Fabrication and Erection
jobs on Kennedy Space Center and Cape Canaveral AFS.
1980 - Community College of Beaver County, Monaca, PA - AS in Industrial
Management
1980 - 1985 - 300+ CEU's in Management from Wittenberg University,
University of Pittsburgh & Penn State
2008 - U.S. Army Corps of Engineers - Construction Quality Management for
Contractors
OSHA - 30 Hour, First Aid & CPR
2013 - Hazwhoper 40 hour