H EEJUNG LEE
Unit* ** Beresford Rd Strathfield NSW 2135
*********@*****.***
Objective a nd C areer Summary :
1. To get a stable job in the field of welding in a solid company that could utilize
my welding skills.
2. 8 years of experiences with Oil & ship companies as a pipe welder and a
fabricator.
Skills and Att ributes:
• Oxy and Plasma cut ting all Positions
• SMAW - Shield Metal Arc Welding 6G
• FCAW - Flux Cored Arc Welding 1F, 2F, 3F, 4F
• GTAW - Gas Tungsten A rc Welding (Carbon Steel, Low Temperature Carbon
S teel, Stainless Steel, Duplex Stainless Steel, Inconnel, Cu-Ni) 6G all positions
• GTAW - Sheet metal experience(1-3t mild steel, stainless steel and aluminium)
• Reading and understanding of drawings including ISO
Work H istory:
I n Australia
• CFL ENG Pty Ltd.
February 2015 - Currently
Position: welder
Performing Pipe welding, structures and pipe supports
Fix some repairs (X-ray problems)
Qualified 6G GTAW
Overseas experiences (in South Korea)
• Young-sung ENG(the subcontractor of Hyundai Heavy I ndustry)
J uly 2012 – December 2014
Position: first class pipe welder
Performed high-quality GTAW pipe welding and to fix some repairs (x-ray
p roblems)
Carbon Steel, Stainless Steel, Duplex Stainless Steel and nickel alloys from half to
30 inch examined by the X-ray or ult rasonic waves)
Projects: Delta House FPS hull (the project of L LOG), Q204 FPSO (the project of
BP) and Ofon FPS phase2 top side (the project of Total)
• I l-won ENG(the subcontractor of D aewoo Shipbuilding & Ma r ine
E ngineering)
November 2010 – July 2012
Position: first class pipe welder
Performed high-quality GTAW pipe welding and to fix some repairs (x-ray
p roblems)
Carbon Steel, Stainless Steel from half to 30 inch examined by the X-ray or
u ltrasonic waves
Projects: CLOV FPSO (the project of Total)
• Yu-sung ENG
June 2008 – October 2010
Position: pipe fi t ter and first class pipe welder
Performed high-quality GTAW and FCAW pipe welding
Carbon, Stainless Steel and nickel alloys using turning table
Fit ting pipes including making a part of supports
• Dong-bo heavy industry
December 2005 – June 2008
Position: fabricator and second class welder
Performed fabrication, erection of steel works such as steel structures, fences,
conveyers, covers etc
Cutting steel plate using oxy or plasma equipment
FCAW (co2 only), SMAW, GTAW welding for pipes, sheet and heavy metal (1-
30mm plates)
Carbon, stainless steel and aluminium
Educational Background:
In Australia
• Work safely in the construction industry (WHITE CARD)
• Certificate in engineering – FABRICATION TRADE (AQF 3)
Overseas
• Certification of GTAW published by Hyundai Heavy Industry with ASME
s tandard
6G Carbon Steel Pipes (thickness: max 22mm, diameter: unlimited)
6G Duplex and Super Duplex Stainless steel pipes (thickness: max 11mm,
d iameter: unlimi ted)
6G Inconnel Pipes (thickness: max 22mm, diameter: unlimi ted)
• Certification of GTAW published by Daewoo Shipbuilding & Marine
E ngineering w ith ASME standard
6G Carbon Steel Pipes (thickness: max 30mm, diameter: unlimited)
6G Stainless Steel Pipes (thickness: max 22mm, diameter: unlimi ted)
Referees:
CFL ENG Pty L td. Manager: Yui-nam Hwang
I l-won ENG Co-worker: Dea-soo Han