CURRICULUM VITAE
RICHARD A. LOMORYA
Philippine Address : Ampalaya Village Gun ob Lapu Lapu City, Cebu.
Mobile No.: +639*********
UAE Address : Electra St., Abu Dhabi, UAE
Mobile No. : +971**-***-****
Email : aco4kh@r.postjobfree.com
OBJECTIVES :
To acquire a position where I can fully utilized my knowledge and abilities as Structural Fabrication.
SKILLS :
Communicate and interact with others.
•
Capable of working under time pressure.
•
A hard worker who eager to learn. Accept and follows direct easily and willing to invest time and effort to complete
•
certain responsibilities.
Have good moral and ethical standards.
•
EMPLOYEE HISTORY :
FABRICATOR
SIGED EMIRATES, ICAD 1 Mussafah Abu Dhabi, UAE
February 15, 2012 – Present
PROJECT ACCOMPLISHMENT :
Page 1 of 5
BUNDUQ CO. LTD., PRODUCING COMPANY OFFSHORE
Projects :
Replacement of Fire Water Line to AVIATION FUEL TANK.
•
Demolation of existing and installation of new spools “CU NI materials” to Aviation Fuel Tank, Ranging ”
Dia to 8” Dia and also install replacement new Valve with different sizes as per Projects requirements and
Hydrotest Operation as per required Pressure on each line replaced.
Replacement of Fire Foam Line to HELIDECK.
•
Demolation of existing and installation of new spools “CU NI materials” to Helideck, Ranging ” Dia, 2”
Dia to 4” Dia and also install replacement new Valve with different sizes as per Projects requirements and
Hydrotest Operation as per required Pressure on each line replaced.
Replacement of Fire Water Line to SEPARATOR and HEADER TEST.
•
Demolation of existing and installaltion of new spolls “CU NI materials” to Separator and Header Line Test
Ranging 4” Dia to 8” Dia also install replacement new Valves with defferent size Projects requirements
and Hydrotest Operation as per required Pressure on each line replaced.
ZADCO (ZAKUM DEVELOPMENT COMPANY) ZIRKU ISLAND PLANT PROJECT
Projects :
Replacement Shutdown individual Train I, II, III Liquid Relief Header 20’’ Dia
•
Demolation of existing 20’’ Dia Sch 60 Installation and Fit Up a new spools 20’’ Dia Sch 60 Carbon Steel
Materials and also the branches line 16’’ Dia and the by pass line 10’’ Dia. Replacement install.
Fit up a new Spool Carbon steel material Replacement and Install new valves with different size as per
Project requirements and Hydrotest Operation as per required Pressure (PSI) on each line replaced.
Replacement Cruide return Line 16’’ Dia
•
Issolated the Valve Tie Point Fit Up a Blind Flange or Speed Pad as per Project required.
Demolation of 16’’ Dia Pipe Line
Installation and Fit up new Pipe Spools 16’’ Dia Carbon Steel Materials
Installation of branches line 10’’ Dia and in bypass line 8’’ Dia replaced and install new Spool Carbon
Steel Material and Hydrotest Operation as per required Pressure 9PSI) on each replaced line
ADMA – OPCO OFFSHORE
Projects :
Solar panel deck extension
•
Slot conductor and Protection fender
•
Spiking line (6” diameter SCH. XXS)
•
Gas transfer platform shutdown
•
Wellhead Tower
•
Page 2 of 5
TAKREER REFINERY (ONSHORE)
Project :
U nitrogen (Intergas) Shutdown
•
HS High Pressure Steam
•
Sulphur Recovery Unit Shutdown
•
Demolition Fabrication and installation of steam coil for Sulphur pit, refurbishment of condenser and piping
•
replacement from Area 1, 2 and 4
STRUCTURAL FABRICATOR
GPC (GULF PIPING COMPANY), Sanaia Mussafah Abu Dhabi, UAE
November 28, 2005 to November 30, 2011
PROJECT ACCOMPLISHMENT :
SAUDI ARAMCO
Projects : SKID VALVE
Execute job as per drawing given by the supervisor
•
Fabricate DS24, DS20, DS06, DS03
•
Fabricate the Valve Skids (7 nos.) and fit up using the Pipe 8”, 6”, 4”
•
Erection/Fit up the 42” Dia. Carbon Steel Pipe 304 with Tee Reducer Pipe 16” and 16” Ball Valve into Skid
•
ADEN YEMEN
Projects : RTG (Rubber Tyred Gantry) CRANE
Responsible in planning on how to execute job as per drawing given by the supervisor
•
Installation of RTG CRANE with Capacity of 40 TON the maximum stack height 1 over 6 high cube capacity
•
Fit up the main pin into the vogue
•
Fitting the gear box and motor into the trolley
•
Fitting the main cable wire and alignment to the spider for the lifting of the container van
•
I am also selected by the client as back up responsible to upload for this project
•
CARGO HANDLING CORP. UNLIMITED MAURITIUS INDIAN OCEAN
Projects : STS (Ship to Shore) CRANE
Responsible in planning on how to execute job as per drawing given by the supervisor
•
Installation of STS Crane at Mauritius Container Terminal with lifting capacity of 40.8 tons each spreader and 72
•
tons under hooks.
Selected by the client as back up responsible to upload for this project
•
Page 3 of 5
ABB LUMMUS Global B.V.
Projects : MOLIKPAQ TIE IN
Responsible in planning on how to execute job as per drawing given by the supervisor
•
Structural Fabrication and Installation of Equipment
•
Installation of Gas Processing Modules and Supports
•
VETCO’S GOLF HINO II FPSO
Projects : MODULE I, II, III
Responsible in planning on how to execute job as per drawing given by the supervisor
•
Perform to layout the plate and I beam and also cleaning the materials
•
Perform to cutting the plate and I beam by using automatic track machine or manual cutting torch
•
Fabricate the flat form using the I beam 500mm flange 2m web 20m length we should have to follow the elevation
•
dimension and the diagonal
TRAINING AND CERTIFICATES :
TROPICAL BASIC OFFSHORE INDUCTION EMERGENCY TRAINING
OPITO APPROVED COURSE CODE – 5501
CERTIFICATE NO. 0058550109051441826
VALIDITY : 4 YEARS
EDUCATIONAL BACKGROUND :
1987 – 1990 : Pajo National High School
Lapu Lapu National High School
PERSONAL DETAILS :
Birth Date : February 18, 1973
Age : 41 Yrs Old
Nationality : Filipino
Civil Status : Married
Language Spoken : Filipino, English
Page 4 of 5
Height : 5’ 9”
DECLARATION :
This is to certify that the above information given is true and correct to the best of my knowledge and belief.
RICHARD A. LOMORYA
Page 5 of 5