Post Job Free
Sign in

Project High School

Location:
Lapu-Lapu City, Central Visayas, Philippines
Salary:
5000 US dollar per month
Posted:
April 10, 2015

Contact this candidate

Resume:

CURRICULUM VITAE

RICHARD A. LOMORYA

Philippine Address : Ampalaya Village Gun ob Lapu Lapu City, Cebu.

Mobile No.: +639*********

UAE Address : Electra St., Abu Dhabi, UAE

Mobile No. : +971**-***-****

Email : aco4kh@r.postjobfree.com

OBJECTIVES :

To acquire a position where I can fully utilized my knowledge and abilities as Structural Fabrication.

SKILLS :

Communicate and interact with others.

Capable of working under time pressure.

A hard worker who eager to learn. Accept and follows direct easily and willing to invest time and effort to complete

certain responsibilities.

Have good moral and ethical standards.

EMPLOYEE HISTORY :

FABRICATOR

SIGED EMIRATES, ICAD 1 Mussafah Abu Dhabi, UAE

February 15, 2012 – Present

PROJECT ACCOMPLISHMENT :

Page 1 of 5

BUNDUQ CO. LTD., PRODUCING COMPANY OFFSHORE

Projects :

Replacement of Fire Water Line to AVIATION FUEL TANK.

Demolation of existing and installation of new spools “CU NI materials” to Aviation Fuel Tank, Ranging ”

Dia to 8” Dia and also install replacement new Valve with different sizes as per Projects requirements and

Hydrotest Operation as per required Pressure on each line replaced.

Replacement of Fire Foam Line to HELIDECK.

Demolation of existing and installation of new spools “CU NI materials” to Helideck, Ranging ” Dia, 2”

Dia to 4” Dia and also install replacement new Valve with different sizes as per Projects requirements and

Hydrotest Operation as per required Pressure on each line replaced.

Replacement of Fire Water Line to SEPARATOR and HEADER TEST.

Demolation of existing and installaltion of new spolls “CU NI materials” to Separator and Header Line Test

Ranging 4” Dia to 8” Dia also install replacement new Valves with defferent size Projects requirements

and Hydrotest Operation as per required Pressure on each line replaced.

ZADCO (ZAKUM DEVELOPMENT COMPANY) ZIRKU ISLAND PLANT PROJECT

Projects :

Replacement Shutdown individual Train I, II, III Liquid Relief Header 20’’ Dia

Demolation of existing 20’’ Dia Sch 60 Installation and Fit Up a new spools 20’’ Dia Sch 60 Carbon Steel

Materials and also the branches line 16’’ Dia and the by pass line 10’’ Dia. Replacement install.

Fit up a new Spool Carbon steel material Replacement and Install new valves with different size as per

Project requirements and Hydrotest Operation as per required Pressure (PSI) on each line replaced.

Replacement Cruide return Line 16’’ Dia

Issolated the Valve Tie Point Fit Up a Blind Flange or Speed Pad as per Project required.

Demolation of 16’’ Dia Pipe Line

Installation and Fit up new Pipe Spools 16’’ Dia Carbon Steel Materials

Installation of branches line 10’’ Dia and in bypass line 8’’ Dia replaced and install new Spool Carbon

Steel Material and Hydrotest Operation as per required Pressure 9PSI) on each replaced line

ADMA – OPCO OFFSHORE

Projects :

Solar panel deck extension

Slot conductor and Protection fender

Spiking line (6” diameter SCH. XXS)

Gas transfer platform shutdown

Wellhead Tower

Page 2 of 5

TAKREER REFINERY (ONSHORE)

Project :

U nitrogen (Intergas) Shutdown

HS High Pressure Steam

Sulphur Recovery Unit Shutdown

Demolition Fabrication and installation of steam coil for Sulphur pit, refurbishment of condenser and piping

replacement from Area 1, 2 and 4

STRUCTURAL FABRICATOR

GPC (GULF PIPING COMPANY), Sanaia Mussafah Abu Dhabi, UAE

November 28, 2005 to November 30, 2011

PROJECT ACCOMPLISHMENT :

SAUDI ARAMCO

Projects : SKID VALVE

Execute job as per drawing given by the supervisor

Fabricate DS24, DS20, DS06, DS03

Fabricate the Valve Skids (7 nos.) and fit up using the Pipe 8”, 6”, 4”

Erection/Fit up the 42” Dia. Carbon Steel Pipe 304 with Tee Reducer Pipe 16” and 16” Ball Valve into Skid

ADEN YEMEN

Projects : RTG (Rubber Tyred Gantry) CRANE

Responsible in planning on how to execute job as per drawing given by the supervisor

Installation of RTG CRANE with Capacity of 40 TON the maximum stack height 1 over 6 high cube capacity

Fit up the main pin into the vogue

Fitting the gear box and motor into the trolley

Fitting the main cable wire and alignment to the spider for the lifting of the container van

I am also selected by the client as back up responsible to upload for this project

CARGO HANDLING CORP. UNLIMITED MAURITIUS INDIAN OCEAN

Projects : STS (Ship to Shore) CRANE

Responsible in planning on how to execute job as per drawing given by the supervisor

Installation of STS Crane at Mauritius Container Terminal with lifting capacity of 40.8 tons each spreader and 72

tons under hooks.

Selected by the client as back up responsible to upload for this project

Page 3 of 5

ABB LUMMUS Global B.V.

Projects : MOLIKPAQ TIE IN

Responsible in planning on how to execute job as per drawing given by the supervisor

Structural Fabrication and Installation of Equipment

Installation of Gas Processing Modules and Supports

VETCO’S GOLF HINO II FPSO

Projects : MODULE I, II, III

Responsible in planning on how to execute job as per drawing given by the supervisor

Perform to layout the plate and I beam and also cleaning the materials

Perform to cutting the plate and I beam by using automatic track machine or manual cutting torch

Fabricate the flat form using the I beam 500mm flange 2m web 20m length we should have to follow the elevation

dimension and the diagonal

TRAINING AND CERTIFICATES :

TROPICAL BASIC OFFSHORE INDUCTION EMERGENCY TRAINING

OPITO APPROVED COURSE CODE – 5501

CERTIFICATE NO. 0058550109051441826

VALIDITY : 4 YEARS

EDUCATIONAL BACKGROUND :

1987 – 1990 : Pajo National High School

Lapu Lapu National High School

PERSONAL DETAILS :

Birth Date : February 18, 1973

Age : 41 Yrs Old

Nationality : Filipino

Civil Status : Married

Language Spoken : Filipino, English

Page 4 of 5

Height : 5’ 9”

DECLARATION :

This is to certify that the above information given is true and correct to the best of my knowledge and belief.

RICHARD A. LOMORYA

Page 5 of 5



Contact this candidate