Resume of
Rocco R Cacciatore
Phone# 253-***-****
Work# 907-***-****
Position seeking: Sr. Piping Designer/Lead Designer
Design Expertise
. Petro Chemical/ Oil Refining
. Recovery Boilers
. Naphtha Reactor/Reformers
. Crude Units
. Field Walk downs
. Diesel Generators
. Steam Co-generation Power Plants
. Light Ends/Natural Gas Cracking
. Coker Units
. Gas Compressor Stations
. Caustic Reactors.
. Evaporators and Crystallizers
. Kuparuk Alaska CPF 1 and CPF 2 Drill site Units
. Pulp and Paper
. Sulphur Recovery Units
Employment History
Sr. Piping Designer Nana-Worley Parsons -Alaska (Aug 2015 - now)
Currently assigned to the Kuparuk Field maintenance division for Conoco
Phillips/North Slope. Our projects include maintaining and updating
existing well sites, processing facilities, pig launchers, test separators
and pipe racks. Duties include flying to the North Slope and doing all
field walk downs in inclement weather conditions while determining tie-in
points, interfaces, and sketching piping routings. I attend meetings as
required and develop all piping design for the project to include;
isometrics, 3D models, piping plans/sections and BOM's. All material
tracking is performed using a program called SAP, a Conoco Phillips
materials/projects software system. I work single status on most jobs and
interface with a facility engineer during the design phase. I work with
high pressure piping systems; 1500# and 2500# at the well heads and 300#
and 150# in the processing facility. All work is designed using Bentley
Auto Plant.
Principle Designer TPG Services Inc., Carlsbad, NM. (Feb 2013 - June
2014)
I was assigned as a Sr. Piping designer, working on a new sulfur recovery
unit for NCRA Petroleum. My main assignment was to evaluate, calculate and
design the main pipe rack for the new plant to include all bent elevations,
spacing, routing of pipe and tie-ins for off- site piping, flare system
evaluation and establishing major equipment maintenance zones for shut
downs. I interfaced and communicated all layouts to the structural and
electrical departments via weekly meetings. All design was accomplished
using Auto Plant piping/equipment software along with Navisworks software.
Other duties included building equipment from data sheets, laying out PSV
platforms, utility stations and eyewash protection stations. Performed
stress analysis on hot piping, designing expansion loops where required and
reported directly to the lead engineer for all assignments and interface.
Sr. Piping Designer Anvil Corp., Bellingham, WA (April 2012- Jan 2013)
Sr. Piping duties for a new Naphtha Reformer/ Catalyst project for BP Oil.
My roles were to identify tie-ins, perform field walk downs, generate
fabrication isometrics, route new piping systems, layout equipment,
generated lines lists, checked P&ID's, generated stress isometrics and
create all necessary drawings to accomplish project goals. Routed piping
through a series of 4 phase heat exchangers, located pumps and designed the
"steam out" systems on all new equipment providing manifold systems and
steam traps. Used "Point Cloud" laser scans for existing piping locations
along with NavisWorks 9.0 for all model integration and visual needs. I
also worked on an existing HSL Diesel Generator project which added a new
coolant skid. Provided demo packages, tie-in details and new pipe routings.
Frequently asked to check others work using NavisWorks. All 3D Layouts
were created using AutoCAD 2012 and Bentley Auto Plant 2012 piping
software.
Sr. Piping Designer GE Water Technologies, Bellevue, WA. (July
2011 - Mar 2012)
Responsible for the layout and design of new "turnkey" boiler feed water
evaporator facilities for clients in northern Alberta, CA, providing
equipment layout, piping design, P&ID review, GA review, off-site tie-ns
and drawing packages. Routed piping between evaporator towers and
crystallizer's facilities, providing pipe support selection, stress
analysis (anchors and guides) piping and design reviews using NavisWorks.
Also assigned the task of checker working other's works in different
process sections of the plant using Bentley Auto Plant 2009 and Navisworks.
Sr. Piping Designer Chemithon Corp. Seattle, WA. (Oct 2007 - Jun 2011)
Created equipment layouts and piping design for modular "skid mounted" S03
and Hydrous ammonia generator skids. Created equipment locations, routed
all piping, provided electrical access, identified off site tie-ins and
created piping isometrics as part of the final package. I coordinated with
our on-site fab shop for any design issues that were overlooked. I worked
in the field during construction as part of a team for connecting and
starting up the skids. All 3D design was created on AutoCAD2007 using
Bentley Auto Plant.
*Took time off from work from Sept 2006 thru Sept 2007.
Sr. Piping Designer The Harris Group Inc., Seattle, WA. (Sept 96' - Aug
2006'.)
Created detail piping and equipment layouts for local oil refineries within
the Northwest area. My roles were to define and coordinate each project
assigned while being responsible for all piping layouts, isometrics,
support design, tie-ins, line numbers, valve lists, drawing indexes and
preliminary stress review. I also performed P&ID field walk downs, created
equipment layouts, piping isometrics, piping packages and support packages.
Projects to include: Crude Unit Heater, Light Ends Unit Storage project
and No.1 Diesel Unit Gas Compressor Installation. I was assigned to the
field at various times during construction. All design was created on
AutoCAD
using CADPIPE.
Sr. Piping Designer NLK Corp., Tukwila, Wa. (Jan 91' - Aug 96')
I was assigned to a new Pulp and Paper project in charge of the twin roll
press area and brown stock screening. My roles at first were to act as a
piping designer, laying out the twin roll presses, screens, conveyors,
pumps and piping. I was later promoted to area lead over this area and had
four people working under me. I generated manpower estimates for all the
piping drawings, sections and details, and held responsibility for the line
lists, equipment lists and tie in list. I oversaw all design progress and
held weekly meetings to oversee drawing progress. I was assigned later to
the field for construction for a period of one year. While in the field, my
roles were to assist during shut down, locking out tanks/equipment, re-
designing piping runs as needed, hydro testing, working with contractors
and general field support help.
Sr. Piping Designer Christensen Engineering, Bellingham, WA. (Jun 88'
- Dec 1990'.)
I was assigned to a new Coker Unit #2 for Shell Oil Corp. as a Sr. piping
designer. My roles were to generate manpower estimates, line lists,
equipment lists, tie in lists, as well as layout equipment and pipe rack
extensions. Other duties included supervising a team of four assigning
tasks and overseeing design progress. I was assigned to the field for
construction afterwards for a period of one year. Also worked on projects
for BP oil North Slope Alaska installing (2) pig launchers and receivers. I
worked off existing drawings and field notes to locate equipment and route
piping to include pipe supports and restraints. While in the field, my
roles were to assist during shut down, locking out tanks/equipment, re-
designing piping runs as needed, hydro testing, working with contractors
and general field support help.
Piping Designer Stearns & Roger Engineering, Denver, CO. (Apr 80 - May
88.)
I was assigned to the Kuparuk Sea Lift Project for Arco Oil Alaska. I
started off working in the layout department as part of the "mentoring"
program for skill growth. I attended a 6 month intensive piping school
modeled after The Flour Corporations piping school and was taught equipment
layout, piping layout, instrumentation and structural. My first assignment
was to be part of the layout of the gas compressors and all interconnecting
piping systems. I located equipment, utility stations, maintenance zones
and firewater/halon systems. I worked closely with all disciplines for
project coordination.
Another of my assignments was in the Model Shop building a 3/8" scale model
of the Compressor Module, creating the 3/8" scale plastic model.
Another role was providing design of water and steam injection systems at
the well sites for CPF1 and CPF2. Spent 1 year in Kuparuk, Al for module
interconnects.
Special Skills
Microsoft Office 2010
Microsoft Access 2010
Microsoft Project 2010
Microsoft Visio Professional
Microsoft Visual Basic. Net
Bentley AutoPlant 2012
CADWORX software
AutoCAD 2012
Education
Bellevue Community College (AA.) Information Technology
Eastern Idaho Tech. Idaho Falls, ID. (AA) Mechanical Technology
[pic]