CIRRICULUM VITTAE
PERSONAL DETAILS:
NAME: STEVEN SNEDDEN
DOB: 4/2/1974
TRADE: WELDER
ADDRESS: ** ****** ********
GRANGEMOUTH
STIRLINGSHIRE
FK3 9JT
TEL NO: (01324) 879203
E.MAIL ***********@*******.***
MOBILE NO: 077********
CCNSG SAFETY NO: 734111 EXP. 05/09/14
ACE CARD NO: 20836
ECITB CERTIFICATE: NVQ QEW30/2
EDUCATION: MATHS(3), ENGLISH(3),
CHEMISTRY(3), FRENCH(4),
MODERN STUDIES(3), PE(1).
EMPLOYMENT HISTORY
MARCH 94 – SEPT 95: E.C.I.T.B
BLUE COURT, CHURCH LANE,
KINGS LANGLEY
HERTS
WD4 8JP
DUTIES: APPRENTICESHIP.
CAXIOS ON SITE TRAINING AT BP
GRANGEMOUTH THEN
METCOM TRAINING CENTRE
GRANGEMOUTH FOR BASIC
PIPEFITTING, RIGGING, PLATING,
WELDING SKILLS.
MARCH 96 – APR 2013: DOOSAN BABCOCK ENERGY LTD
INEOS OILS GRANGEMOUTH
MAINTANENCE & VARIOUS PROJECTS
DUTIES: CONTINUED AND COMPLETED WELDING
TRAINING AT TIPTON WELDING SCHOOL
TO CLASS 1 ASME 9 6G/BS EN287 AND
LLOYDS CERTIFICATION.
PROJECT: C.O.D 1,2,3 TARS, WELDING VARIOUS
PIPEWORK/
STEELWORK, INCLUDING 5 CHROME 6
INCH PIPE
COILS, TIG WITH PURGE. 100% RAD, MPI.
POWERSTATION TAR, CARBON STEEL
BOILER
TUBES TIG 100% RAD,MPI, STEELWORK,
SUPPORTS,
DUCTING, USING MMA/MIG. MAIN STEAM
INLET
VALVES 9 INCH XXL 2 CHROME TIG
ROOT, MMA
FILL AND CAP 100% RAD/MPI. 36 INCH
CARBON
STEEL WATER RING MAIN TIG ROOT, MMA
FILL/CAP
HYDROCRACKER TAR, 84 INCH
CARBONSTEEL
VESSEL, FLUX CORE MIG ROOT FILL AND
CAP.
6 INCH INCONEL XXL FLANGES ON MAIN
HEADER
TIG ROOT/PURGE SYSTEM, MMA FILL/CAP
100%
RAD/MPI. 42 INCH PARALLOY T. PIECE, TIG
ROOT/
PURGE, MMA FILL/CAP, 100% RAD/MPI.
COCKENZIE POWERSTATION TAR.
VACUUME LINE
10 INCH SCH10 STAINLESS STEEL 316L.
100%RAD/
MPI.
HAVE WORKED ON ALL MAJOR TARS
THROUGHT
EMPLOYMENT AT INEOS GRANGEMOUTH,
LONGANNET/COCKENZIE POWERSTATION.
VASILIKOS POWERSTATION CYPRUS,
LANGERLO POWERSTATION BELGIUM,
FLOTTA ORKNEY.
KINNEIL TO FINART PIPELINE
HAVE EXPERIENCE IN ALL PIPEWORK
FROM
CARBON STEEL TO CHROME 1 , 2 , 5%,
9%,
INCONEL, PARALLOY, STAINLESS STEEL,
COPPER/
NICKEL. ALSO EXPERIENCE IN
MIRROR/WINDOW
WELDS. FABRICATION WORKSHOP
EXPERIENCE.
REFEREES: MR. Raymond Burt. (welding supervisor)
DOOSAN BABCOCK ENERGY LTD.
INEOS OILS GRANGEMOUTH.
TEL: (01324) 666981.
Email : *****@*************.***
MAY-2013- MAR 2014: SERIMAX – SHETLAND GAS PLANT
LAGGAN TORMORE
PROJECT/DUTIES: NEW PROJECT BUILD/ SHETLAND GAS
PLANT
WORK TO A HIGH STANDARD OF SAFETY
INCLUDING A SAFE AND TIDY WORK
AREA
SET UP WELDING MACHINERY AND
CABLES
SAFELY AND IN A TIDY MANOR.
WELD 42” 316L SCH40 T.I.G TO
PROCEDURE
WELD 10” 316L SCH10 T.I.G TO
PROCEDURE
WELD 6” 316L SCH40 T.I.G TO PROCEDURE
WELD 2” 316L SCH80 T.I.G TO PROCEDURE
WELD 6” C.S XXXL T.I.G TO PROCEDURE
WELD 18” C.S SHC40 T.I.G TO PROCEDURE
WELD 3” C.S SHC40 T.I.G TO PROCEDURE
WELD 12” C.S XXXL T.I.G TO PROCEDURE
WELD 2” C.S SHC40 T.I.G TO PROCEDURE
WELD 20” C.S XXXS TIG ROOT, FILL+ CAP
M.I.G/FLUX CORE TO PROCEDURE.
WELD 16” C.S XXXL TIG ROOT, FILL+CAP
MIG/FLUX CORE TO PROCEDURE.
WELD VARIOUS PIPEWORK FROM 2” TO
42”
VARIOUS SHC PIPE STAINLESSSTEEL/
CARBONSTEEL INCLUDING LOW TEMP
C.S
REFEREES MARTIN CHISOLM WELDING
SUPERVISOR
SERIMAX. SHETLAND GAS PLANT
MARCH-2014- PRESENT BECHTEL/CURTIS ISLAND
PROJECT/DUTIES: NEW BUILD PROJECT/LNG PLANT
QUEENSLAND/AUSTRALIA
SPECIAL CLASS WELDER
WORK TO A HIGH STANDARD OF
SAFETY
INCLUDING A SAFE AND TIDY WORK
AREA
SET UP WELDING MACHINERY AND
CABLES
SAFELY AND IN A TIDY MANOR.