Post Job Free

Resume

Sign in

Maintenance Plant

Location:
Georgia
Posted:
February 11, 2015

Contact this candidate

Resume:

TONY W. ADKINS

*** ***** ******* ***** ****

Rossville, Ga 30741

Phone (H): 706-***-****

(C) 423-***-****

E-mail: acn9q2@r.postjobfree.com

Over 35 years of experience in the areas of Nuclear, Industry and Oil Refinery maintenance

mechanical experience in the repair of valves, valve operators, pumps, heat exchangers and other

mechanical equipment. Additionally have provided and assisted with Supervisory positions being

responsible for parts procurement, work package planning and scheduling, personnel safety tagouts,

holding safety pre-job briefs and schedule adherence. Great interpersonal skills that allow me the ability

to lead, mentor or work in diverse work environments. Master Data experience includes the complete

walk down of plant equipment/systems, developing equipment data records, PM plans and Bill of

Material requirements for the same.

WORK EXPERIENCE

Pro2 Serve Jul 2014 – Present

Paducah Diffusion Plant, Paducah, KY

Procedure Writer

• Duties include reformatting maintenance procedures to a new format, checking the

procedures for accuracy, clarity of instructions, and safety.

MetaPower Canada Ltd Nov 2011 – Jun 2013

Suncor Energy Inc., Ft. McMurray, Alberta, Ca

Procedure Writer

• Duties include the reviewing, updating and reformatting of maintenance procedures for an

Oil Sands facility.

• Ensuring that the procedure and related drawings, specifications, and manuals are tied to the

correct functional location within the Plant Maintenance Module of SAP.

The Shaw Group Jan. 2011 – Nov. 2011

San Onofre Nuclear Generating Station

San Clemente, Ca

Construction Planner

• Duties include Walkdown and Planning work package development of scheduled maintenance

activities within the Plant Maintenance Module of SAP R/3 for both Weekly and Outage/Turnaround

Maintenance Work Activities.

• Provide the identification of potential safety hazards during walkdowns.

• Identification and procurement of required parts and materials.

• Duties included SAP Step listing and task list development.

• Additionally developed a configuration software control database within the Planning Organization

for in-house planner use for drawing and document retrieval.

The Atlantic Group Sep 2010 – Jan 2011

Sequoiah Nuclear Generating Station

Soddy Daisy, Tn

Planner

• Duties include Walkdown and Planning work package development of scheduled maintenance

activities within the Maximo for both Weekly and Outage/Turnaround Maintenance Work Activities.

• Provide the identification of potential safety hazards during walkdowns.

• Identification and procurement of required parts and materials.

• Additionally developed a configuration software control database within the Planning Organization

for in-house planner use for drawing and document retrieval.

Street Legal Industries Feb. 2010 – Sept 2010

Oak Ridge East Tennessee Technical Park

Oak Ridge, Tn

Facility Engineer

• Duties include Walkdown and Planning work package development of scheduled maintenance.

• Provide the identification of potential safety hazards during walkdowns.

• Identification and procurement of required parts and materials.

Volt Technical Services June 2009 – January 2010

San Onofre Nuclear Generating Station

San Clemente, Ca

Planner

• Duties include Walkdown and Planning work package development of scheduled maintenance

activities within the Plant Maintenance Module of SAP R/3 for both Weekly and Outage/Turnaround

Maintenance Work Activities.

• Provide the identification of potential safety hazards during walkdowns.

• Identification and procurement of required parts and materials.

• Duties included SAP Step listing and task list development.

• Additionally developed a configuration software control database within the Planning Organization

for in-house planner use for drawing and document retrieval.

• Functioned as the primary contact within the Planning Organization for indoctrination and training of

new planning personnel with SAP Training.

Metapower Canada, Ltd. July 2006 - Present

Suncor Energy Inc., Ft. McMurray, Alberta, Ca

Planner/Scheduler - Millennium Upgrader Plant, Secondary side.

• Duties include Walkdown and Planning work package development of scheduled maintenance

activities within the Plant Maintenance Module of SAP R/3 for both Weekly and Outage/Turnaround

Maintenance Work Activities.

• Provide the identification of potential safety hazards during walkdowns.

• Identification and procurement of required parts and materials.

• Duties included SAP Step listing and task list development.

• Additionally developed a configuration software control database within the Planning Organization

for in-house planner use for drawing and document retrieval.

• Functioned as the primary contact within the Planning Organization for indoctrination and training of

new planning personnel with SAP Training.

G. D. Barri and Associates Memphis, TN April 2006 - May 2006

Valve Technician

• Duties included the repair of Fisher valves and operators in a valve repair shop.

• Responsible for the identification of required parts for re-build.

The Atlantic Group, Nine Mile Point Nuclear Station Feb. 2006 - April 2006

Valve Supervisor

• Duties include parts procurement, logistics and tracking,

• Work package planning and scheduling for required repairs.

• Personnel safety tagout verification and holding safety pre-job briefs for an 8 man crew.

• Performed maintenance on various types and sizes of valves and valve operators.

G. D. Barri and Associates, Ganzales, La Nov. 2005 - Dec. 2005

Valve Technician

• Duties included the repair of various types of valves and valve operators at several hurricane

damaged plants in Louisiana.

• Coordinated materials and required logistics.

The Atlantic Group, North Anna Nuclear Station Oct. 2005 - Nov. 2005

Valve Technician

• Repack of various types and sizes of valves.

• Additionally coordinated materials and parts.

The Atlantic Group, DC Cook Nuclear Station Feb. 2005 - April 2005

Valve Supervisor

• Duties include parts procurement.

• Work package planning and scheduling.

• Personnel safety tagout verification and holding safety pre-job briefs for an 8 man crew.

• Performed maintenance on various types and sizes of valves and valve operators.

G.D. Barri, Chattanooga, TN Nov. 2004 - Feb. 2005

Master Equipment List (MEL) Subject Matter Expert

• Duties included the establishment of a plant warehouse.

• Assignment of bin locations and the creation of warehouse ID numbers for plant surplus equipment.

• Creation of bill of materials (BOM’s) for plant equipment.

The Atlantic Group, DC Cook Nuclear Station Sept. 2004 - Nov. 2004

Valve Supervisor

• Duties include parts procurement.

• Work package planning and scheduling.

• Personnel safety tagout verification and holding safety pre-job briefs for an 8 man crew.

• Performed maintenance on various types and sizes of valves and valve operators.

Asset Management Analysis Group, Chattanooga, TN May 2004 - Sept. 2004

Master Equipment List (MEL) Subject Matter Expert SAP Plant Maintenance Module

• Duties included the walkdown of plant equipment.

• Red lining of plant P&IDs for further revisions.

• Creation and training of user's manual in the use of EMS (Engineering Material System) for plant

personnel.

The Atlantic Group, DC Cook Nuclear Station Feb. 2004 - May 2004

Valve Supervisor

• Duties included the procurement of parts and materials.

• Work package development, planning and scheduling.

• Personnel safety tagout verification and conduct of safety pre-job briefs.

• Performed maintenance on various types and sizes of valves and valve operators.

Asset Management Analysis Group March 2000 - Feb. 2004

Seaford, De, Camden, SC and Chattanooga, TN

Master Equipment List (MEL) Subject Matter Expert / Lead Technician/Project Lead

• Duties included the gathering of equipment manufacturers’ data and bill of materials.

• Red-lining of plant P&IDs for later revision.

• Warehouse setup and bin location assignment for one of the plants.

• Creation of a user's guide and training in the EMS (Engineering Maintenance System) software

system (Held the role of Master Data Resource in SAP (OEM software).

• Responsible for the creation of equipment records, functional location records and equipment bill of

material records within the Maintenance Module of SAP.

• Created System drawings showing the various equipment and functional locations.

Aerotek, Nine Mile Point Nuclear Station Feb. 2000 - March 2000

Staff Augmentation

• Duties included the resolution of mechanical deficiency reports with respect to Maintenance training

and procedural adherences.

The Atlantic Group, Dresden Nuclear Station Nov. 1999 - Dec. 1999

Valve Supervisor

• Duties include parts procurement.

• Work package planning and scheduling.

• Personnel safety tagout verification and holding safety pre-job briefs for an 8 man crew.

• Performed maintenance on various types and sizes of valves and valve operators.

G.D. Barri, LaSalle Nuclear Station Sept. 1998 - May 1999

Staff Augmentation

• Duties included the resolution of mechanical maintenance deficiency reports.

• Assisted Mechanical Supervision in work package closure and parts procurement.

• Held Maintenance Outage Manager role insuring the timely completion of system work prior to plant

startup.

G.D. Barri, LaSalle Nuclear Station Nov. 1997 - May 1998

Staff Augmentation

• Duties included the resolution of mechanical maintenance deficiency reports.

• Assisted with work package closure and parts procurement.

• Supported the Maintenance Outage Manager during outages assuring completion of system work

prior to plant startup.

The Atlantic Group, Dresden Nuclear Station June 1996 - June 1997

Valve Supervisor

• Duties include parts procurement.

• Work package planning and scheduling.

• Personnel safety tagout verification and holding safety pre-job briefs for an 8 man crew.

• Performed maintenance on various types and sizes of valves and valve operators.

G.D. Barri, Quad Cities Nuclear Station Jan. 1996 - May 1996

Valve Superintendent

• Responsible for the completion of work for 6 crews of valve technicians.

• Duties included personnel safety tagout verification, parts procurement and schedule

adherences during a nuclear refuel outage.

(Additional work summary upon request)

U. S. Naval Submarine Force June 1974 - June 1984

Machinist Auxiliary Mate & Yeoman (Honorable Discharge)

• Duties included the repair and preventative maintenance on ship's mechanical equipment including

pumps, valves, COH2 burners/scrubbers, and O2 generators.

PROFESSIONAL TRAINING

SAP, WC Mosse, EWCS, Passport and GWOS (scheduling tool).

Microsoft Word, Excel, PowerPoint, Access and other word processing software.

REFERENCES (Available upon request)



Contact this candidate