Personal Data
Name Ir. Prima Agaftha
Gender Male
Place and date of birth Pariaman/August 21, 1984
Fix Address Jl. Wr Supratman no 32 Pauh Pariaman, Kecamatan
Pariaman Tengah, Kota Pariaman, SUMBAR
Height/Weight 164cm/54kg
Marital Status Married
Religion Moslem
Phone Number 081********* & 082*********
E-Mail Address ************@*****.***
Linkedin ID id.linkedin.com/pub/prima-agaftha/43/6a1/b8a/
Education
2002-2008 Bung Hatta University (Industrial
Engineering) GPA 3.19 (on scale 4.00)
1999-2002 Senior High School (SMUN 1 Pariaman)
1996-1999 Junior High School (SLTPN 1 Pariaman)
1990-1996 Elementary School (SDN 08 Pariaman)
Personal Development
2014 Project Management for EPCI by Komintas
Migas Indonesia
2014 Kursus Pembinaan Insinyur Indonesia
(Engineering Development Course) by Persatuan Insinyur
Indonesia (Indonesian Engineering Community)
2014 Primavera P6 Profesional Advanced Rel 8.2
in Oracle University
Reference : Sachbudi Abbas Ras 081********
2012 ORACLE Primavera P6 Rel 8.0 Fundamentals
in Oracle University
Reference : Vinny Gemilia 081***********
2012 Workshop for preparing Project Execution
Plan in PT Krakatau Engineering
2010-2011 Management Trainee Program in PT Gunanusa
Utama Fabricators
2011 Introduction ISO 9001:2008 in PT Gunanusa
Utama Fabricators
2010 Working at height in PT Gunanusa Utama
Fabricators
2010 Basic Safety in PT Gunanusa Utama
Fabricators
2010 Waste Management in PT Gunanusa Utama
Fabricators
2010 Basic of Fire Fighting in PT Gunanusa
Utama Fabricators
2010 Permit to Work in PT Gunanusa Utama
Fabricators
2010 Hazard and identification Risk assesgment
in PT Gunanusa Utama Fabricators
2009 ISO 9001 : 2000, PT Mekonika Sembilanribu
2009 Petroleum Economy, PT Energi Mega Persada
2009 Development Strategy of Geothermal Source,
Chevron Geothermal Indonesia
2009 Green Operation in Oil and Gas Company,
Medco Energi
Qualification
Language Bahasa, English (both spoken and writeen)
Familiar with Project Management, Planning & Scheduling,
Primavera, Microsoft Project
Experince
January 2015 - Until now
Company :Jaya CM as Consultant
Position :Planner and Scheduler
Project :Podomoro City Deli Medan
Owner :Podomoro Land
Reference :Feydy Bonenehu as Project Control Manager(085*********)
Main duties tasks and responsibilities :
. Develop the Master Schedule.
. Review the daily, weekly and monthly progress report.
. Recommended necessary action for critical path.
. Modify the current project with realistic data.
. Distribute the analyze report to Site Manager and
owner about weekly, monthly and overall progress.
. Review the progress measurement report.
. Conduct the monthly progress meeting.
. Communicate project performance to the project team.
August 2012 - December 2014
Company :Black and Veatch/Jaya CM as Consultant
Position :Planner and Scheduler
Project :Banjarsari Minemouth Coal Fire Steam Power Plant 2x135 MW
Owner :PT. Bukit Pembangkit Innovative
Reference :Robert Cone (my.linkedin.com/pub/robert-
cone/15/100/b55)
Gerald W Peters as Site Manager (081********)
Main duties tasks and responsibilities :
. Develop the Master Schedule.
. Review the daily, weekly and monthly progress report.
. Recommended necessary action for critical path.
. Modify the current project with realistic data.
. Distribute the analyze report to Site Manager and
owner about weekly, monthly and overall progress.
. Review the progress measurement report.
. Conduct the monthly progress meeting.
. Communicate project performance to the project team.
August 2012 - December 2014
Company :Black and Veatch/Jaya CM as Consultant
Position :Planner and Scheduler
Project :Transmission Line 150 kV Banjarsari - Lahat Substation
Owner :PT. Bukit Pembangkit Innovative
Reference :Robert Cone (my.linkedin.com/pub/robert-
cone/15/100/b55)
Gerald W Peters as Site Manager (081********)
Main duties tasks and responsibilities :
. Develop the Master Schedule.
. Review the daily, weekly and monthly progress report.
. Recommended necessary action for critical path.
. Modify the current project with realistic data.
. Distribute the analyze report to Site Manager and
owner about weekly, monthly and overall progress.
. Review the progress measurement report.
. Conduct the monthly progress meeting.
. Communicate project performance to the project team.
November 2011 - August 2012
Company :PT Krakatau Engineering as Contractor
Position :Project Control Engineer
Project :Indonesia Integrated Steel Mill Power Plant 2x100MW
Owner :PT. Krakatau Posco
Reference :Irfan Alfaiz as Project Manager (081********)
Main duties tasks and responsibilities :
. Develop the Master Schedule.
. Prepare the Project Execution Plan.
. Record the progress each area working plan.
. Tracking the progress activity and actual costs.
. Controling project finance condition.
. Recommended necessary action to catch up project
progress.
. Reforecast the schedule if necessary.
. Modify the current project with realistic data
. Distribute the daily, weekly and monthly progress
report to owner.
. Communicate project performance to the project team
. Prepare the Project Measurement Report
. Communicate with Contract Administrator about the
payment to owner.
. Monitoring sub-contractors progress
April 2011 - August 2011
Company :PT KSB Indonesia
Position :Order Processing and Purchasing
Prooduct :Pumps
Reference :Vhony as Order Processing and Purchasing (085*********)
Main duties tasks and responsibilities:
. Checking quoatation and order from customer.
. Processed order with equip "order review checklist",
make order calculation, purchase order for goods
import and order confirmation.
. Coordination with Finance, Engineering, Logistic,
Services, Warehouse, Sales Support, Forwarder and PPC
about goods status.
. Monitoring import goods to factory until goods ready
for sent at factory then continued by Dept import to
regulate the delivery passes sea or air through
forwarding agent.
. Monitoring goods that bought local done by PPC pass
local purchasing.
. Contact the customer if the good already send to
their company.
February 2010 - March 2011
Company :PT Gunanusa Utama Fabricators as Contractor
Position :Production Staff
Project :ICP-R Process Platform Project MHSRP II
Owner :ONGC India
Reference :Ardhani Widaryoko as Project Coordinator (081*********)
Agus Putra Djaja as Supertendent (021-
8804443)
Main duties tasks and responsibilities :
. Assist Project Coordinator jobs.
. Monitor the implementation of the task sheets in the
field.
. Monitor the location of goods made in cut profile of
disciplinary structure
. Prepare methods or tools to solve the fabrication
problems.
. Coordinate with supervisors to perform fabrication,
installation and erection.
. Monitoring daily and progress activities.
. Select the new employee for Pipe Fitter.
November 2008 - August 2009
Company :PT Global Internasional Industries
Position :Lead Production
Product :Lamps (Shinyoku branded)
Reference :Liem Liak Hui as Production Manager (021********)
The main duties and responsibilities :
. Running the daily production schedule.
. Ensuring the work undertaken can be achieved by an
efficient and timely manner.
. Ensure zero bottlenecks in the assembling line.
. Mapping production lines and the number of operators
required for each type of production items.
. Coordination with QC to ensure that incoming raw
materials in accordance with the specifications and
requirements.
. Coordination with the PPIC to ensure the arrival of
material and production scheduling.