Post Job Free
Sign in

Project Manager

Location:
Indonesia
Salary:
$7000
Posted:
February 12, 2015

Contact this candidate

Resume:

Personal Data

Name Ir. Prima Agaftha

Gender Male

Place and date of birth Pariaman/August 21, 1984

Fix Address Jl. Wr Supratman no 32 Pauh Pariaman, Kecamatan

Pariaman Tengah, Kota Pariaman, SUMBAR

Height/Weight 164cm/54kg

Marital Status Married

Religion Moslem

Phone Number 081********* & 082*********

E-Mail Address ************@*****.***

Linkedin ID id.linkedin.com/pub/prima-agaftha/43/6a1/b8a/

Education

2002-2008 Bung Hatta University (Industrial

Engineering) GPA 3.19 (on scale 4.00)

1999-2002 Senior High School (SMUN 1 Pariaman)

1996-1999 Junior High School (SLTPN 1 Pariaman)

1990-1996 Elementary School (SDN 08 Pariaman)

Personal Development

2014 Project Management for EPCI by Komintas

Migas Indonesia

2014 Kursus Pembinaan Insinyur Indonesia

(Engineering Development Course) by Persatuan Insinyur

Indonesia (Indonesian Engineering Community)

2014 Primavera P6 Profesional Advanced Rel 8.2

in Oracle University

Reference : Sachbudi Abbas Ras 081********

2012 ORACLE Primavera P6 Rel 8.0 Fundamentals

in Oracle University

Reference : Vinny Gemilia 081***********

2012 Workshop for preparing Project Execution

Plan in PT Krakatau Engineering

2010-2011 Management Trainee Program in PT Gunanusa

Utama Fabricators

2011 Introduction ISO 9001:2008 in PT Gunanusa

Utama Fabricators

2010 Working at height in PT Gunanusa Utama

Fabricators

2010 Basic Safety in PT Gunanusa Utama

Fabricators

2010 Waste Management in PT Gunanusa Utama

Fabricators

2010 Basic of Fire Fighting in PT Gunanusa

Utama Fabricators

2010 Permit to Work in PT Gunanusa Utama

Fabricators

2010 Hazard and identification Risk assesgment

in PT Gunanusa Utama Fabricators

2009 ISO 9001 : 2000, PT Mekonika Sembilanribu

2009 Petroleum Economy, PT Energi Mega Persada

2009 Development Strategy of Geothermal Source,

Chevron Geothermal Indonesia

2009 Green Operation in Oil and Gas Company,

Medco Energi

Qualification

Language Bahasa, English (both spoken and writeen)

Familiar with Project Management, Planning & Scheduling,

Primavera, Microsoft Project

Experince

January 2015 - Until now

Company :Jaya CM as Consultant

Position :Planner and Scheduler

Project :Podomoro City Deli Medan

Owner :Podomoro Land

Reference :Feydy Bonenehu as Project Control Manager(085*********)

Main duties tasks and responsibilities :

. Develop the Master Schedule.

. Review the daily, weekly and monthly progress report.

. Recommended necessary action for critical path.

. Modify the current project with realistic data.

. Distribute the analyze report to Site Manager and

owner about weekly, monthly and overall progress.

. Review the progress measurement report.

. Conduct the monthly progress meeting.

. Communicate project performance to the project team.

August 2012 - December 2014

Company :Black and Veatch/Jaya CM as Consultant

Position :Planner and Scheduler

Project :Banjarsari Minemouth Coal Fire Steam Power Plant 2x135 MW

Owner :PT. Bukit Pembangkit Innovative

Reference :Robert Cone (my.linkedin.com/pub/robert-

cone/15/100/b55)

Gerald W Peters as Site Manager (081********)

Main duties tasks and responsibilities :

. Develop the Master Schedule.

. Review the daily, weekly and monthly progress report.

. Recommended necessary action for critical path.

. Modify the current project with realistic data.

. Distribute the analyze report to Site Manager and

owner about weekly, monthly and overall progress.

. Review the progress measurement report.

. Conduct the monthly progress meeting.

. Communicate project performance to the project team.

August 2012 - December 2014

Company :Black and Veatch/Jaya CM as Consultant

Position :Planner and Scheduler

Project :Transmission Line 150 kV Banjarsari - Lahat Substation

Owner :PT. Bukit Pembangkit Innovative

Reference :Robert Cone (my.linkedin.com/pub/robert-

cone/15/100/b55)

Gerald W Peters as Site Manager (081********)

Main duties tasks and responsibilities :

. Develop the Master Schedule.

. Review the daily, weekly and monthly progress report.

. Recommended necessary action for critical path.

. Modify the current project with realistic data.

. Distribute the analyze report to Site Manager and

owner about weekly, monthly and overall progress.

. Review the progress measurement report.

. Conduct the monthly progress meeting.

. Communicate project performance to the project team.

November 2011 - August 2012

Company :PT Krakatau Engineering as Contractor

Position :Project Control Engineer

Project :Indonesia Integrated Steel Mill Power Plant 2x100MW

Owner :PT. Krakatau Posco

Reference :Irfan Alfaiz as Project Manager (081********)

Main duties tasks and responsibilities :

. Develop the Master Schedule.

. Prepare the Project Execution Plan.

. Record the progress each area working plan.

. Tracking the progress activity and actual costs.

. Controling project finance condition.

. Recommended necessary action to catch up project

progress.

. Reforecast the schedule if necessary.

. Modify the current project with realistic data

. Distribute the daily, weekly and monthly progress

report to owner.

. Communicate project performance to the project team

. Prepare the Project Measurement Report

. Communicate with Contract Administrator about the

payment to owner.

. Monitoring sub-contractors progress

April 2011 - August 2011

Company :PT KSB Indonesia

Position :Order Processing and Purchasing

Prooduct :Pumps

Reference :Vhony as Order Processing and Purchasing (085*********)

Main duties tasks and responsibilities:

. Checking quoatation and order from customer.

. Processed order with equip "order review checklist",

make order calculation, purchase order for goods

import and order confirmation.

. Coordination with Finance, Engineering, Logistic,

Services, Warehouse, Sales Support, Forwarder and PPC

about goods status.

. Monitoring import goods to factory until goods ready

for sent at factory then continued by Dept import to

regulate the delivery passes sea or air through

forwarding agent.

. Monitoring goods that bought local done by PPC pass

local purchasing.

. Contact the customer if the good already send to

their company.

February 2010 - March 2011

Company :PT Gunanusa Utama Fabricators as Contractor

Position :Production Staff

Project :ICP-R Process Platform Project MHSRP II

Owner :ONGC India

Reference :Ardhani Widaryoko as Project Coordinator (081*********)

Agus Putra Djaja as Supertendent (021-

8804443)

Main duties tasks and responsibilities :

. Assist Project Coordinator jobs.

. Monitor the implementation of the task sheets in the

field.

. Monitor the location of goods made in cut profile of

disciplinary structure

. Prepare methods or tools to solve the fabrication

problems.

. Coordinate with supervisors to perform fabrication,

installation and erection.

. Monitoring daily and progress activities.

. Select the new employee for Pipe Fitter.

November 2008 - August 2009

Company :PT Global Internasional Industries

Position :Lead Production

Product :Lamps (Shinyoku branded)

Reference :Liem Liak Hui as Production Manager (021********)

The main duties and responsibilities :

. Running the daily production schedule.

. Ensuring the work undertaken can be achieved by an

efficient and timely manner.

. Ensure zero bottlenecks in the assembling line.

. Mapping production lines and the number of operators

required for each type of production items.

. Coordination with QC to ensure that incoming raw

materials in accordance with the specifications and

requirements.

. Coordination with the PPIC to ensure the arrival of

material and production scheduling.



Contact this candidate