GENCI JORGONI 416-***-****
** ******* ****** ****: 647-***-****
Toronto, ON, M1X 1Z5 Email: ********@*****.***
CANDIDATE PROFILE
Extensive background in underground and open pit mining at the technical and
managerial level. Demonstrated a track record of improvements at the operations
worked at, including Vale, Brigus, Golden Band and Ressources Appalaches. Having
recently finished up with Ressources Appalaches, looking for a role that will challenge
technical skills and allow to continue developing supervision and mentorship of junior
mining engineers.
Job title
Manager, Chief / Senior Mining Engineer
Professional qualifications/key skills
Professional Registered Engineer in Ontario, Saskatchewan and Nova
•
Scotia
Experienced mine management, mine planning and designing Engineer
•
who has worked in both open pit and underground mining operations
Familiar with wide range of mining methods, including open pit, long-
•
hole stoping, cut and fill, vertical block, stope and pillar, block caving and sub-level
stoping
Proven record of delivering on targets including reducing production costs
•
and increasing production levels
Excellent computer skills in AutoCAD, Vulcan, IGantt, A-Mine MS-
•
Project 2007 and MSO.
Strong communication skills and leadership experience, including
•
mentoring junior engineers
Education
Bachelor’s Degree in Mining Engineering Post
University Diploma in Mining Construction and Design
Reasons for seeking new position
Recently finished up with Ressources Appalaches and currently looking for next
challenge.
GENCI JORGONI 416-***-****
82 Pogonia Street Cell: 647-***-****
Toronto, ON, M1X 1Z5 Email: ********@*****.***
Notice period Available immediately
Preferred location Open to relocation
GENCI JORGONI 416-***-****
82 Pogonia Street Cell: 647-***-****
Toronto, ON, M1X 1Z5 Email: ********@*****.***
2014 – Present Chief Mining Engineer – Ressorces Appalaches, Dufferin Mine
• Worked on the underground mining operations for Dufferin
Mine
• Conducted mine improvement on ground support, ventilation,
dewatering and safety.
• Analyzed mining method and modified as per ore body
geometry, improving dilution, increase efficiency and safety.
• Reduced cost on all mining activities through cost -
manpower and mining processes analysis.
• Design bottom of mine, saddle 4 - 5 and 6.
Chief Mining Engineer – Brigus Gold Corp, Matheson, ON
Apr 2013 – Oct
Black Fox Mine
2013
• Worked on the open pit and underground mining operations
for Brigus Gold, Black Fox Mine.
• Conducted the Black Fox GS standardization.
Analysed and improved Black Fox Ground Support which
resulted in increasing the bearing capacity and reducing cost.
• Analyzed long-hole stope and improved the design
Created primary and secondary blocks
• Changed the mining sequences to improve dilution and
decrease stresses
• Improved long-hole patterns to protect HW eliminating failure.
• Change the BF system.
• Implemented CRF to handle LH stope for thick OB (10-20 m)
• Eliminated the sill pillar to reduce OB lost
• Reduced cost on all mining LH stope activities
• Improved the design holes pattern on OP waste rock
• Eliminated mine bottle necks which lead to an increasing in
production of 25%
• Implemented changes that decreased costs by 25%
• Decreased drilling, explosive and material consumables by
25%
• Redesign the East North side of the Open Pit operations
Increased the minable area by 3-months (16,000 ounces )
• Designed an open pit wall reinforcement
Eliminated pit failures and further reduced costs
Mar 2011- Feb Senior Mining Engineer – Golden Band Resources,
2013 Saskatchewan
• Senior Mining Engineer for the Bingo Mine and Komis Open
Pit mine
• Analyzed and improved Bingo mine project design to
increase production and efficiency
• Improved long hole pattern to solve deficiencies in rock
breakage, dilution and fragmentation
GENCI JORGONI 416-***-****
82 Pogonia Street Cell: 647-***-****
Toronto, ON, M1X 1Z5 Email: ********@*****.***
• Improved slot raise pattern through analysis and calculation
to manage opening of the stope
• Managed the cost and efficiency in development areas and
production to maintain two accesses in the stop.
• Management assessment of time activities to minimize cost
and increase production.
• Schedule and sequences analyze to find the most efficient
production in the other levels of mine.
• Analyzed and improved Komis Open Pit project through open
pit optimization
• Escalated waste and ore production working in more faces
and benches simultaneously
• Arranging sequences of activities, drilling, haulage and
mucking, improving equipment efficiency.
• Shrinking open pit boarders through changes in open pit
element designing optimization.
2007- March Mining Engineer – Vale-Inco, Thompson, MB
2013
• Designed the 124-Portal Ramp and Accesses using AutoCAD
and Vulcan
• Designed all cuts and pillars from 300L. to overburden using
Vulcan
• Analysed development and production to maintain two
accesses in the stope using Vulcan and Igantt
• Completed an assessment of time activities to minimize cost
and increase production using Igantt
• Provided bottle neck analyses to justify the different
improvement in ore and rock using Vulcan and Igantt
• Conducted the ground support design for different area of the
124 portal including establishing Rock Mechanics and
Ground Support Standards
2001 – 2006 Consulting Engineer, Toronto
• Completed various mining projects
• Also worked outside of the mining industry after moving to
Canada
1981 – 2000 General Manager / Chief Engineer / Mine Superintendent- Red
Stone Fe-Ni Mine, Pogradec, Albania
• Utilized management skills and focused on achieving key
outcomes in open pit and underground mine production and
safety
GENCI JORGONI 416-***-****
82 Pogonia Street Cell: 647-***-****
Toronto, ON, M1X 1Z5 Email: ********@*****.***
• Designed and supervised of the improvement of the Block
and Sub Level Caving system
• Designed a new Ground Support program and delivered an
improvement of dilution and production
• Developed new ways of development in ore and rock using
different analysis of the new Block and Sub Level Caving
mining method.
• Designed the new transportation method using vibrating
principle
• Designed, supervised and operated the new mine 1945L and
1968L.
• Worked with the stope and pillar mining method including the
development, loading haulage, dewatering, and ventilation,
drilling, blasting and ground support systems
• Provided assessment on cost and profit
• Analysed all systems’ elements to minimize cost and
increase production.
References upon request