David Berty, P.E.
New Palestine, IN 46163
**********@*******.***
Summary of Qualifications:
Versatile, intelligent, dedicated engineer with experience to handle the challenges.
Experienced in a variety of technical areas including process and energy optimization,
technical writing, project management, equipment sizing, utility operations and
system design. Familiar with design and material specifications from API, ANSI,
ASME, and ASTM. Skills include strong ability to foster a team environment,
communication across multiple disciplines, and cultivating a customer/client-focused
plan.
Education & Memberships:
o Rose-Hulman Institute of Technology, Terre Haute, IN
B.S. Mechanical Engineering, May 2002
o Member- ASHRAE & ASME
Professional Experience:
Covance Laboratories
2010-Present Greenfield, IN
Utility/Mechanical Engineer- Facilities Management
Regional/national engineering technical support for large pharmaceutical research
company. Project manager and technical ownership of all utility and mechanical
systems, providing assistance to operations and maintenance for all technical needs.
Accomplishments in this position include:
o Led master planning effort for campus utility infrastructure
o Implemented 1st phase of master plan to replace a chiller system, managed all
aspects of the $5M project.
o Led effort to find and implement HVAC energy savings across campus.
Citizens Thermal
2005-2010 Indianapolis/Greenfield, IN
Utility Engineer/Engineering Advisor- Facilities Management
Led efforts to increase efficiency of utility operations. Managed capital projects
involving all ranges of powerhouse equipment and systems, including wastewater
treatment. Technical ownership of all utility systems, providing assistance to
operations and maintenance for all technical needs.
Advisory role over engineering group at multiple facilities; entails capital budget
oversight and technical guidance.
Accomplishments in this position include:
o Managed project to install new air compressor equipment for powerhouse.
o Led effort for in-house layout and design of temporary boiler piping.
o Managed project to install waterside economizer to save ~$85,000/year.
Bibb and Associates
2002-2005 Lenexa, KS
Mechanical Engineer
Size equipment and pipelines and write equipment purchase specifications. Perform
technical bid evaluations and negotiations. Utilize computer software to model and
analyze power plant operation. Design piping systems for proper in-service operation;
setting design conditions, and locating equipment.
Accomplishments in this position include:
o Utilized value engineering principles to save project over $200,000 in piping costs
by optimizing pipe design criteria.
o Successfully led the company-wide implementation of new software to analyze
piping transient behavior, saving each project cost and man-hours.