Michael J. Wheeler *** Mill Street ( Boyertown, PA 19512 ( 610-367-
**** ( ***********@*******.***
Qualifications for Plant Management
Manufacturing professional equipped with an extensive track record of
success in progressively responsible manufacturing management roles.
Dynamic leader who offers excellent team building and motivational skills.
Resourceful problem solver adept in improving processes to reduce costs and
boost productivity. Knowledgeable regarding Systems Applications Products
(SAP), Statistical Process Control (SPC) and ISO 9000/9001/9002.
Proficient user of Microsoft Word, Excel, Outlook and Kronos attendance
system.
Career Track
JUST BORN INC., MANUFACTURING SUPERVISOR,
2009 - Present
Leading and directing the Molded Value Stream on 3rd shift for this candy
producer of several iconic brands. Managed all departments on all three
shifts when needed. Leading the implementation of new departments on 3rd
shift. Assists in developing SOP's and one point lessons for improvement in
processes for several different departments. Part of the team that
implemented SAP system. Forklift certified. First Aid/CPR certified.
Overseeing new production effort on 3rd shift in the Mogul department.
Completed company sponsored High Performance Leadership Development
training.
Participated in a 5S Kaizen event which resulted in a reduction of nearly
300 steps in foot traffic for two departments.
Mentors both new Supervisors and hourly associates in this union
environment.
Rees Companies Inc., Fabrication/Project Manager,
2008-2009
Directed day-to-day activities in a job shop environment, including
production scheduling, manufacturing, shipping, warehousing, and
maintenance, in support of construction project requirements for fabricated
metal assembles. Assisted in developing corporate strategy and implemented
operational actions that supported the strategy. Trained and evaluated
production staff. Ensured compliance with company policies and procedures.
Generated successful bids for both private and public works. Provided
project estimates for cost and delivery timing. Controlled inventory.
Designed programs to improve production operations, efficiency, and
profitability. Ensured on-time shipment of fabricated parts and
assemblies. Had P/L responsibility. Served on the safety committee.
Managed a $900,000+ project that was completed 17% under budget and 10 days
ahead of schedule.
Spearheaded a new quality initiative, creating documentation and protocol
that reduced rework by over 90%.
Produced OEM manuals per customer requests. Created SOP's and documents
outlining company policy.
Jacquet Mid Atlantic Inc., Plant Manager
2006-
2008
Planned, coordinated, and directed the daily operations of a steel plate
fabricator. Oversaw daily, weekly, and monthly production; presented
projections to sales on a daily basis. Participated in ongoing budget
development efforts. Managed various projects. Controlled inventory and
purchased production consumables, equipment, tooling, and replacement
parts. Initiated and maintained vendor relationships vital to production
processes. Recruited and hired shop personnel; administered disciplinary
action.
Improved production from $0 per month in October 2006 to $1.5 million per
month in October 2007 generating $11 million for calendar year 2007.
Negotiated a reduction in the cost of a high-use production consumable from
$.36/pound to $.15.5/pound, generating substantial savings, as the plant
used approximately 12,000 pounds of the consumable each month.
Organized the installation and start-up of the compressed air system as
well as the installation of a second water jet machine, including
coordinating the activities of outside contractors.
Handy & Harman Specialty Tube Co. Inc., Production Supervisor, - 2004-
2006
Directed the operations of the entire second and third shifts in a
unionized environment for a specialty tube manufacturer. Provided
leadership to five departments. Monitored, addressed, and communicated
production needs to drive goal attainment. Ensured the consistent
application of Lean Six Sigma principles. Was a key participant in Kaizen
events. Enforced disciplinary policy.
Participated in an initiative to improve internal company communications
through company-sponsored training.
Led a successful cleanup and retooling campaign during a two-week plant
shutdown.
Trained all members of the third shift to input data into new MIS data
collection devices.
Bally Ribbon Mills, Production Scheduler/ Shift Supervisor, 1980-2003
Scheduled eight departments for all shifts for a narrow textiles
manufacturer. Communicated lead times to sales. Monitored raw material,
machine, and personnel availability. Tracked production progress through
MIS. Scheduled new orders based on available resources. Ensured urgent
requests were expedited while minimizing disruption to the master schedule.
Contributed to "Sequence of Operations," published in conjunction with
Hamilton Cornell Associates. Was part of the management team that worked to
achieve ISO 9000, 9001 and 9002 certification. 9 years as lead loom fixer.
Coordinated a successful TQM effort.
Cut absenteeism on the third shift by 50% and guided the third shift to
rank #1 in the company for production.
Minimized redundant machine setup while reducing lead times through
effective production scheduling.
From 2003-2004, also served as a Certified Personal Trainer with Gold's
Gym, marketing and selling service products as well as designing and
implementing personalized fitness programs.
Education
Associate Degree, General Studies, Reading Area Community College
Fundamentals of Supervision Levels I and II, Manufacturers Association of
Berks County
Short Interval Scheduling Techniques, Hamilton Cornell Associates
Fundamentals of HACCP, Penn State University