[pic]
CURRICULUM VITAE
ANGELITO SUIZA ECHANEZ
OLIT APARTMENT, ROAD 2, ARRIETA SUBD.,
BATANGAS CITY, PHILIPPINES
Mobile No.:091*-***-**-**
AL-NEFESAH SURVEY OFFICE
P.O. Box 18130, Riyadh 11415, K.S.A
Tel.Nos. +966-**-*******
Email address: ****.***********@*****.***
OBJECTIVES:
. To work professionally in the interest of the company where
offering an opportunity for further growth and development of my
professional career, value my expertise in the areas where
integrity and dedication contributes to the achievement of the
company's goals.
SUMMARY:
. Profile: Male, Married
. Nationality: Filipino
. Birthdate: October 03, 1974
. Age: 40 yrs. old
. Years of Experience: 19 years
. Educational Attainment: Associate in Marine Engineering,
Technological Institute of the Philippines
20th Ave., Cubao, Q.C.
. Current Position: Senior Land Surveyor / Computer
Operator
. Company: Al Nefesah Survey Office
P.O. Box 18130, Riyadh 11415, K.S.A.
SKILLS:
. Expertise in all kinds of surveying (topographical survey, as-built
survey, infrastructures survey i.e buildings, roads, bridges, tower
lines, power plants and lay-out of all structures (i.e anchor bolts
for precast, axis of columns of buildings) using Total Station
Instrument of any kind and GPS.
. Computer operator:
. Sokkia software program in surveying (Survey Data
Recorder, Mapping and Design)
. GRX2 Sokkia Pro link and GNSS solution for GPS data
. Auto Cad (Draftsman)
WORK EXPERIENCE:
May 1996 - Present Al-Nefesah Survey Office Riyadh, Saudi
Arabia
Senior Surveyor
This company is one of the most pioneers in land surveying all over Saudi
Arabia. With all the classic and modern equipment of surveying, all the
works were done agreeably.
DUTIES AND RESPONSIBILITIES:
. Site reconnaissance. Coordination with the owner or client on site
visit.
. Prepares required quotation for the projects, timesheet for
schedule of work and supervision, execution of detailed survey
works.
. Study of survey projects, thinking creatively to resolve practical
planning and development problems; calculation of expropriation and
calculation of quantities.
. Utilizing data from a range of sources, such as aerial photography,
satellite surveys and interpreting data using maps, charts and
plans.
. Traverse surveying to established main control points (primary and
secondary) and elevation for benchmarks.
. Verify the accuracy of survey data, including measurements and
calculations conducted at survey sites.
. Field surveying to obtain data and base plans, making exact
measurements and determining property boundaries and provide data
relevant to shape, contour, gravitation, location, elevation &
dimension of the land for engineering, mapmaking, land evaluation,
construction and other purposes.
. Field surveying to obtain longitudinal sections and cross sections
(i.e. Pipe line & Power line route plan & profile survey, Carry out
large scale topographic & utility surveys, geodetic network
densification and rehabilitation/geoids modeling.)
. Direct or conduct surveys in order to establish legal boundaries
for properties, based on legal deeds and titles.
. Implementation of accurate ground measurements and surveying
methodology in line with project plans as required by the client
including aspects such as large scale distances, angles,
coordinates and elevation using a range of equipment to produce
surveys, including GPS and conventional methods.
. Prepares appropriate drawings for the site project as required by
the client (i.e. topographical drawings, elevation and contour,
profiles and cross sections) using Survey Data Recorder Mapping and
Design (sokkia software) and Auto cad.
. Prepare and maintain sketches, maps, reports, and legal
descriptions of surveys in order to describe, certify, and assume
liability for work performed.
. Setting-out of all forms and kinds of structures (i.e. buildings
axis, foundations and columns, anchor bolts for pre-cast and steel
columns, tower lines footings, power plants turbines, pipelines and
road centerline alignment).
. Coordination and interaction with foremen, supervisors and site
engineers to provide timely surveying information on all works
particularly in lay-out of structures and checking of as-built.
. Coordination to a staff of the Bureau of Lands for checking and
approval of final boundary of every site project for approval of
Land deeds and titles.
PERSONAL GOAL:
. Every project must be finish accordingly on time, because I do
believe that if a worker works double time with high quality
performance and determination he will avoid the rush of deadlines.
SPECIAL ASSIGNMENTS:
Company: AL BAWANI CO.
Project Name: King Faisal Specialist Hospital
Project Place: Thalatheen, Riyadh, K.S.A.
Date: October 2014
. Established control points.
. Topographical As-built survey of the proposed area for demolition.
. Ground Level survey with every 20 meters in distance interval using
Total station Instrument.
. Finalizing the as-built drawings of every details.(i.e. Building
faces, inside structures, ceilings, electrical, hvac, ducting,
etc.)
Company: PRINCE SULTAN PALACE
Project Name: Prince Sultan Palace
Project Place: Riyadh, K.S.A.
Date: March 2014
. Established control points using GPS static survey mode.
. Topographical Survey of all buildings, man-made structures.
. Ground Level survey with every 20 meters in distance interval using
Total Station instrument.
Company: PRINCE SULTAN FARM
Project Name: Prince Sultan Farm
Project Place: Janadriyah, K.S.A.
Date: July 2013
. Established control points using GPS static survey mode.
. Topographical Survey of the whole farm (area= 90,000,000.00 sq.m.)
including main roads, adjacent farm roads, electric posts etc.
. Setting-out of ARAMCO pipeline R.O.W.
. Checking by GPS with the ARAMCO Surveyors if the survey made are
correct based on AMANA and ARAMCO control points.
Company: ETHAR CO.
Project Name: National Guard Strategic Position (Government)
Project Place: Abha, K.S.A.
Date: August 2012
. Established control points using GPS static survey mode.
. Topographical Survey of the area.
. Setting-out of Boundary of every 100 meters for the total perimeter
of 24kms.
Company: SAUDI BIN LADEN GROUP (S. B. G.)
Project Name: Saudi National Guard Housing Project (Government)
Project Place: Al Qassim, K.S.A.
Date: April 2012
. Established control points using GPS static survey mode.
. Topographical Survey of proposed Project Site with an area of
1,200,000.00 sq. m. using X,Y,Z method.
. Ground Level survey with every 20 meters in distance interval using
GPS Kinematic survey mode.
. Contouring the whole area.
Company: ARABIAN BEMCO
Project Name: Power Plant Pipeline Saudi Electric Company Project
Project Place: Al Kharj, K.S.A.
Date: Dec. 2011-Jan.2012
. Established control points using GPS Static survey mode.
. Topographical Survey of proposed 13 kms. Pipeline route using X,Y,Z
method.
. Ground levels survey of 100m width from proposed centerline route
with every 20meters in distance interval using GPS Kinematic survey
mode.
. Contouring the whole area.
. Profiles and Cross section.
Company: KADI Co.
Project Name: Saudi Electric Company Project
Project Place: Jizan, K.S.A.
Date: April - May 2011
. Established control points using GPS Static survey mode.
. Topographical Survey of O.H.L. 32kv Power line route of 22kms.
using X,Y,Z method.
. Ground Level survey of 200m width from proposed centerline with
every 20meters in distance interval using GPS Kinematic survey
mode.
. Contouring the whole area.
. Profiles and Cross section.
. Lay-out of center of 60 Tower lines.
Company: MINISTRY OF INTERIOR (M.O.I)
Project Name: Government Project
Project Place: Riyadh, Taif, Abha and Jeddah, K.S.A.
Date: March 2010
. Established control points using GPS Static survey mode.
. Topographical Survey of the whole project area using X,Y,Z. method.
. Ground Levels survey of roads and inside the project area of every
10 meters in distance interval.
. Contouring the whole area.
Company: KADI Co.
Project Name: Saudi Electric Company Project
Project Place: Rafha, K.S.A.
Date: February 2010
. Established control points using GPS Static survey mode.
. Topographical Survey of O.H.L. 32kv Power line route of 20kms.
using X,Y,Z method.
. Ground Level survey of 100m width from proposed centerline of the
entire 20kms route with every 20meters in distance interval using
GPS Kinematic survey mode.
. Contouring the whole area.
. Profiles and Cross section.
. Lay-out of center of 60 Towerlines.
Company: MILITARY INDUSTRIES CORPORATION
Project Name: Government Project (M. O. D. A.)
Project Place: Al-Kharj, K.S.A.
Date: October 2009 - January 2010
. Topographical Survey of the entire area (40 million square meters)
using X,Y,Z method.
. Ground level survey of the entire area with every 20meters in
distance interval using GPS Kinematic survey mode.
. Contouring the whole area.
. Established control points using GPS Static Survey Mode.
Company: AL-NAHDI SPORTS CLUB
Project Name: Government Project
Project Place: K.S.A.
Date: May - June 2008
. Established control points using Total Station Instrument.
. Topographical survey of the entire sports facilities (33 sports
club) using X, Y, Z method.
. Finalizing map drawings in computer using Survey Data Recorder
Mapping and Design Program before proceeding to another project
site.
Company: POWER TELECOM and TECHNOLOGIES
Project Name: 5th Air Defense, M. O. D. A. (Government Project)
Project Place: Safwa, Ras Al-Ghar, Jubail, K.S.A.
Date: April 2008
. Topographical survey of the entire 3 sites using X, Y, Z method.
. Profile survey for the proposed route of electric cable of
converter.
. Established control points using GPS Static Survey Mode.
Company: JATCO
Project Name: Government Pipeline Project (Ministry of Water)
Project Place: Layla Aflaj, K.S.A.
Date: February 2008
. Topographical survey of water pipeline proposed route including
right of way of 100meters using X, Y, Z method.
. Ground level survey of the entire route of every 20meters in
distance interval using GPS Kinematic survey mode.
. Established control points and benchmarks of every 500meters and
T.P. of every 250meters along the water pipeline proposed route.
. Profile survey and cross section.
Company: ARABIAN BEMCO
Project Name: Saudi Electric Company (SECO) Project
Project Place: Qurrayah, Abqaiq, K.S.A.
Date: August 2007
. Checking of the established Control points on site using GPS Static
survey mode.
. Topographical surveys of the required area for SECO sub-station
using X, Y, Z method.
. Ground level survey to know how much more backfill are required.
. Profile survey and cross section of the 5kms proposed road.
. Established control points along the proposed road.
Company: AL-QAHTANI and SONS CO.
Project Name: Land Development Project
Project Place: Jubail, K.S.A.
Date: May 2007
. Established control points by triangulation survey method.
. Topographical survey of the required boundary area (7million sq.
m.) including 4kms of shoreline using X, Y, Z method.
. Ground level survey of the entire area using GPS Kinematic survey
including 200meters of seawater from shoreline.
. Setting-out of property boundary points.
. Hydro Survey using GPS Kinematic survey and boat with CruzPro
gauges.
Company: ARABIAN BEMCO
Project Name: Riyadh Power Plant No. 10
Project Place: Al-Kharj, K.S.A.
Date: April 2007
. Established control points by triangulation survey method.
. Topographical survey of the entire boundary area (1.5 million sq.
m.) using X, Y, Z method.
. Ground level survey of the entire area at 50 meters in distance
interval using GPS Kinematic survey mode of GPS.
Company: ASTALDI ARABIA
Project Name: ARAMCO Project
Project Place: Khurais, K.S.A.
Date: March 2007
. Established primary control points of the required area for further
construction using GPS Static Survey Mode of GPS
Company: KING ABDULAZIZ CITY OF SCIENCE AND TECHNOLOGY
Project Name: Solar Village (Government Project)
Project Place: Jubaylah, K.S.A.
Date: January 2006
. Established primary control points of the required area for further
construction using static survey mode of GPS.
. Topographical survey of the entire boundary area (700,000.00 sq.
m.) using X, Y, Z method.
. Ground level survey of the entire area of every 20 meters in
distance interval.
. Contour
Company: KING ABDULAZIZ EQUESTRIAN CLUB
Project Name: Equestrian Club Project
Project Place: Thumamah, Riyadh, K.S.A.
Date: November 2005
. Established primary control points.
. Topographical survey of the entire boundary area (77 million sq.
m.).
. Traverse survey for control point adapting UTM coordinates with
scale factor.
Company: DAR AL RIYADH
Project Name: Land Development Project
Project Place: Green City, Ban-Ban, Riyadh, K.S.A
Date: August 2005
. Established primary control points.
. Topographical survey of the entire boundary area (13million sq.
m.).
. Setting-out of required property line
. Setting- out of road center lines and required off-sets.
. Setting-out of round-about.
Company: COMITCO
Project Name: Pre-casts Building Construction
Project Place: Olaya, Riyadh, K.S.A
Date: May 2004
. Setting-out of points for excavation of building foundations based
on 2 given reference control points.
. Lay-out of foundation as per plan
. Lay-out of anchor bolts pre-casts foundation of 5 two storey
building.
Company: KADI CO.
Project Name: Saudi Electric Company Project
Project Place: Qassim, K.S.A
Date: May 2004
. Established primary control points.
. Topographical survey of the proposed route of sceco 320kv overhead
lines. (30kms route of tower lines from SCECO sub-station to Qassim
university)
. All survey was adapted to UTM coordinates using X, Y, Z method.
. Profiles and cross section survey of the proposed route and remote
elevation measurement for overhead lines.
. Setting out of tower lines location and foundations.
Company: SAUDI ENGINEERS
Project Name: Salwa-Batha Road Project
Project Place: Salwa, K.S.A.
Date: October 2003
. Established control points and double set-up Benchmark of every
500meters for road construction.
. Topographic of the existing road 120kms from salwa to batha.
. Provide survey notes as required.
. Profile survey and cross sections to obtain data for the designer
of proposed road.
. Setting out of road center line alignment and point of curves (BCC
and ECC).
Company: SAUDI BINLADIN GROUP (S.B.G.)
Project Name: Water Treatment Plant
Project Place: Salboukh, Riyadh, K.S.A.
Date: June 2003
. Established primary control points.
. Topographic survey of the required area.
. Ground level survey of the required area.
. Setting out of property boundary points for the construction of new
building.
. Profile and cross-section for waste water way.
Company: SAUDI BINLADIN GROUP (S.B.G.)
Project Name: Earth Satellite Station
Project Place: Dirab, Riyadh, K.S.A.
Date: January 2003
. Established primary control points.
. Topographic survey of the required area.
. Ground level survey of the required area.
. Setting out of satellite foundation.
Company: KING FAHAD COASTAL SPORTS CITY
Project Name: Government Project
Project Place: Jeddah, K.S.A.
Date: June 2002 1998
. Established primary control points.
. Topographical survey of the entire sports facilities.
Company: SAUDI BASIC INDUSTRIES CORPORATION (S.A.B.I.C.)
Project Name: SABIC Main Office Building
Project Place: Riyadh, K.S.A.
Date: March 1998
. Established primary control points.
. Topographic survey of the required area (i.e. buildings, roads,
centerlines) to determine the exact property line.
. Ground level survey of every 10meters in distance interval.
. Setting-out of property boundary points.
. Contour
Company: MINISTRY OF INDUSTRY AND ELECTRICITY
Project Name: Government Project
Project Place: Hail, K.S.A.
Date: October 1997
. Established primary control points.
. Topographic survey of the required area (i.e. buildings, roads,
centerlines) to determine the exact property line.
. Setting out of boundary points and subdivision lots.
Company: AL SEIF CO.
Project Name: Kingdom Holdings Tower
Project Place: Oruba, Riyadh, K.S.A.
Date: August 1997
. Established primary control points.
. Topographic survey of all existing structures (i.e. buildings,
roads, centerlines) to determine the exact property line.
. Setting-out of boundary point.
. Topographic survey of excavation for foundation.
. Ground and excavation level survey and volume computation.
Company: SAUDI BINLADIN GROUP (S.B.G.)
Project Name: Al Faisaliyah Tower
Project Place: Olaya, Riyadh, K.S.A.
Date: June 1997
. Topographic survey of excavation for foundation based on given
control points.
. Ground and excavation level survey and volume computation.
Company: SAUDI AMERICAN GENERAL ELECTRIC CO. (S.A.M.G.E.)
Project Name: Riyadh Power Plant No. 9 (PP9)
Project Place: Khurais, Riyadh, K.S.A.
Date: February 1997- March 1997
. Designated as a site engineer and consultant.
. Consultation of as-built structure if it was constructed as per
plan.
. Final submission of reports with color code to the American
Consultants.
Company: SAUDI BINLADIN GROUP (S.B.G.)
Project Name: Riyadh Power Plant No. 9 (PP9)
Project Place: KHURAIS, RIYADH, K.S.A.
Date: November 1996 - February 1997
. Report everyday to the superior engineer for every aspect and
details of each required jobs for the day.
. Lay-out of all structures and elevation (i.e. gas cylinders on
turbines, pipelines alignment and elbows.)
. As-built survey.
WORK EXPERIENCES - PHILIPPINES
Position: Contractual Draftsman
Date: Jan. - Dec. 1995
Office: Land Classification Division
National Mapping And Resource Information Authority (NAMRIA)
Department of Environment and Natural Resources (DENR)
Address: Fort A. Bonifacio, Makati city
Project: Gov't Project
Old Growth Forest and Old Growth Boundary
Disaster Zone Boundary of Prone Disaster areas
. Worked as a contractual Draftsman and plotting of plan of old
growth forest and old growth boundary.
. Drafting and plotting of disasters zone boundary of the ten bays of
the Philippines that is prone to disaster/calamities.
Position: Survey Aide
Date: August 1994
Office: Land Resource Division
National Mapping And Resource Information Authority (NAMRIA)
Department of Environment and Natural Resources (DENR)
Address: Fort A. Bonifacio, Makati city
Project : Mt. Makiling Forest Reserve
University of the Philippines, Los Banos, Laguna
. Worked as a survey aide in surveying the relocation of Monument
boundary of Mount Makiling Forest Reserved.
Position: Survey Aide
Date: June 1994
Office: Land Resource Division
National Mapping And Resource Information Authority (NAMRIA)
Department of Environment and Natural Resources (DENR)
Address: Fort A. Bonifacio, Makati city
Location: Pilar, Sorsogon
. Worked as a survey aide in surveying the land if it is alienable or
disposable.
Position: Survey Aide
Date: April 1993
Office: Land Resource Division
National Mapping And Resource Information Authority (NAMRIA)
Department of Environment and Natural Resources (DENR)
Address: Fort A. Bonifacio, Makati city
Location: San Jose, Tarlac
. Worked as a survey aide.
Position: Data Encoder (Student Summer Job)
Date: April-May 1991
Office: Land Resource Division
National Mapping And Resource Information Authority (NAMRIA)
Department of Environment and Natural Resources (DENR)
Address: Fort A. Bonifacio, Makati city
. Encode data from field work and digitizing map.
I hereby certify that the above information are true and correct to the
best of my knowledge.
ANGELITO S. ECHANEZ
Senior Land Surveyor