MARCUS PAULO DE OLIVEIRA
Address: Estrada da gua Grande, 303, Bloco 2, Iraj, Rio de Janeiro Brazil CEP:
E-mail: *********@*****.*** Telephones: +55-21-981**-**** / +55 (21)
Birthday: 11/03/1980 Marital Status: Married
Professional Briefing
Mechanical Engineer with MBA in Project Management, MBA in Business
Administration ongoing, with 5 years of experience on Projects and
Maintenance Engineering, including international project, following
up the production of Metr Rio's new fleet of 19 trains in China.
Worked on companies as PepsiCo, Silimed and Metr Rio. Internal
Auditor on standards ISO 9001:2008, 14001:2004 and OHSAS 18001:2007.
Fluent English and Portuguese. Available for business trips.
Education
. Post-graduation: MBA on Business Administration at Funda o
Get lio Vargas (FGV). Conclusion: November/2015
. Post-graduation: MBA on Project Management at Funda o Get lio
Vargas (FGV). Conclusion: November/2013;
. Graduation: Mechanical Engineering at Universidade do Estado do
Rio de Janeiro (UERJ). Conclusion: May/2008;
. High School: Souderton Area High School, Souderton - PA - EUA.
Conclusion: June/1999.
Languages
. ENGLISH: Fluent. Certificate of Proficiency in English from
Michigan University - USA
. PORTUGUESE: Fluent.
. GERMAN: Basic.
Professional Experience
Oceaneering (Maintenance Engineer)
From 09/01/2014 (Current job)
. Analysis of manufacture's maintenance and operation manuals in
order to assure the most adequate maintenance of Petrobras'
TAGs:
o Maintenance generic (in order to apply in different equipment)
and specific information (to assure the correct maintenance for
each equipment);
. Concept elaboration, which informs the activity to be done, its
interval and a FMECA analysis.
. Quality check regarding project documentation in order to
minimize the possibility of missing information and/or wrong
cross-reference;
. Elaboration of Statoil's maintenance program to input on SAP;
. Definition of technical hierarchy of Statoil's TAGs;
. P&ID analysis;
. Tools used: SAP, Kamfer, Citrix
Metr Rio - Concess o Metrovi ria do Rio de Janeiro S/A (Maintenance
Engineer)
From 01/04/2013 to 04/07/2014
. Analysis of the new fleet maintenance necessities:
o Maintenance checklist and procedures elaboration for supplier's
approval;
o Identification of critical items for nationalization;
o Responsible for document the knowledge from trains production
monitoring in China;
. Interaction with other departments from Maintenance Engineering
(Methods and Processes; Materials Engineering; Maintenance
Planning and Control and Technical Engineering) in order to
align short, mid and long term necessities;
. Interface between Maintenance Engineering and Projects, Supplier
and Consultants in order to fulfill the area's necessities:
o Responsible for implementing the Reliability Analysis and
Configuration Control at Maintenance Engineering;
. Responsible for TMS study to develop Maintenance Engineering
team by doing benchmarking and visits to train operators
throughout the globe;
. Leader of a Formal Study Team in order to foresee depot,
equipment, tools and materials needed for CRC's overhaul
maintenance;
. Structure of equipment hierarchy to be load to the SAP system.
Metr Rio - Concess o Metrovi ria do Rio de Janeiro S/A (Project and
Commissioning Engineer)
From 09/19/2011 to 01/04/2013
. Project with an investment of R$320MM and focused on the major
events to be held in Rio de Janeiro (Confederations Cup, World
Cup, Olympics);
. Current fleet assessment team leader:
o Analyzing the best option: refurbishment or substitution of the
fleet;
o Leading meetings twice a week with team members (including
consultants) to update the study progress;
. Metr Rio's representative in China:
o CRC's trains production monitoring reporting, daily, the status
to directors, project manager and other members of the team;
o Responsible for the quality assurance of documents and
production of new fleet in China;
o Leader of production and test progress evaluation team for the
new fleet in China;
. Responsible for the spare parts list for the new fleet according
the different types of maintenance;
. Responsible for commissioning the new fleet:
o Leading daily meetings with supplier and consultants in order to
assure that the commissioning plan was met;
o Responsible for depot arrangement in order to gain commissioning
time;
o Responsible for making materials and tools available for
commissioning.
Silimed - Ind stria de Implantes Ltda. (Research & Development
Analyst)
From 01/04/2010 to 09/16/2011
. Elaboration of Project Planning, Protocol, Verification Report,
Device Master Record and Manufacturing Specification;
. Working in Accordance with National and International Standards
as EN ISO, ABNT, NBR.
. Project Monitoring using MicroSiga Project Management Tool;
. Technical Drawings Analysis and Process Optimization (AutoCad);
. Process Optimization Analysis;
. Elaboration of Manufacturing Order;
. Elaboration of Mold and Prototypes Manufacturing Plan;
. Elaboration of Mechanical Assays Plans;
. Manufacturing Process Supervision to Reduce Losses;
. All Project Documents go through internal or external auditing.
Pepsico do Brasil Ltda. (Maintenance Engineering Intern)
From 09/09/2008 to 02/27/2009
. To Assist on the Elaboration of Technical Drawing for Different
Projects;
. Supervised Monitoring for Parts Assembling, Projects Development
on Various Programs, Automation Projects, Maintenance Reports
and Maintenance Plans (Corrective, Preventive and Predictive);
. Ergonomic Projects Participation;
. Maintenance Supervision;
. Machinery Security Weak Points Identification and Protection
Elaboration to Prevent Work Accident;
. Process Auditing to Identify Problems, Reducing the Time of
Service;
. Information exchange with machinery operators to identify
maintenance needs;
. Elaboration of Tool Assembling Manual;
. Pro-activity Award;
. Record Time Autoclave Installation Award;
. Responsible for the Collecting and Reusing the Machinery
Lubricant.
Complementary Formation
. Internal Auditor on Standards ISO 9001:2008, 14001:2004 and
OHSAS18001:2007
. Solid Works Basic: UERJ Credit Hours: 40 h Conclusion: 2005
. Metrology Reliability: SENAI Credit Hours: 48 h Conclusion: 2013
. Experience in China supervising production and raising quality
issues (12/2011 - 06/2012);
. Work Accident Prevention Certificate for Components of Internal
Committee on Accident Prevention.
. Volunteer work:
o Construction of houses for needy people - Habitat for Humanity
(Philadelphia - PA - USA - 1998);
o Physics classes in community high school (Nova Friburgo - RJ -
2005).