Post Job Free
Sign in

Senior Planner and Electric Engineer

Location:
Santiago, Santiago Metropolitan Region, Chile
Posted:
February 06, 2015

Contact this candidate

Resume:

SUMMARY

Qualified Senior Planner / Scheduler Primavera P6 and

Microsoft Project, working more of 17 years in field

conditions, in Projects in many different areas of Electrical and

mechanical construction such as Mine Copper, Energy

Plants, Hydro and Thermal, GNL Plants, Chemical Plants,

Telecommunications Switch and Cellular sites.

Qualified Senior Electrical Engineer with Plus as Project

Manager in Energy Projects (High Voltage – Middle Voltage )

COVER LETTER SENIOR PLANNER / SCHEDULER

Dear Sirs:

I am writing to express my interest in participating in the selection process for a Planner/ Scheduler Position as Primavera P6

Expert.

I am a Senior Planner / Scheduler Engineer with a strong orientation to construction projects of power Plant in Industrial area. I

did work too in some construction projects in the areas of Chemical Plants, GNL Plantas, mine plants, industrial plants and

telecommunications industries, in whole of this areas, i worked principally as Planner/ Scheduler Engineer or as Project

Manager in assembly works of disciplines electrical and instrumentation .

I have 17 years’ experience in my profession as electrical engineer, most of which I served in mining activities and industrial

building projects of some importance as Planner / Scheduler Engineer or Project Manager, such as Power Plants and substations

for milling plants, mills traditional, SAG mills, crushing plants, plant flotation, thickeners and the whole production line of the great

mining. In the industrial plants area, I worked in charge of the construction electrical and instrumentation assembly and

automatic control of chemical plants, production of chlorate for pulp for example, water plants for mining and others. In the energy

area, I worked in electrical construction work for power plants and substations, normally 220 kV large transformers.

The diversity of my endeavors, as well as having developed all professional duties in the field of industrial projects (Project

Manager, Site Planner, Chief Technical Office, etc), using project management methodology and planning and controlling them,

has allowed me to achieve an adequate level to manage and understand multiple projects simultaneously, therefore I hope meet

their expectations for properly displaying the status of ongoing projects in your organization or the correct application of state of the

art in specific disciplines.

For my training, closely linked to the construction on site, I was able to complement my training as an electrical engineer with

knowledge of mechanical assembly, pneumatic and other, as well of civil construction, which is a plus when it takes control a

group of multidisciplinary projects .

I am proficient in Primavera Project Planner and Microsoft Project and work whit this programs for many years.

Several of the contracts of my responsibility were executed under standard EPC or EPCM, it which has allowed me a good

experience in achieving the goals of building, resolving issues of supply and others, and caring that the owner's engineering is of

an appropriate detail level to construct, revised too the scope of contracts, managing subcontracts, tender additional work, report

the construction status, budget status versus expenditures, monitoring of progress and possible delays, establishing recovery

programs these areas to not impact the deadline for the work.

Francisco De la Fuente Droguett Febrero 2015 Page 1 6

I am willingness to travel and for work in shift 60 x 10 or other arrangement.

Because of this experience as a senior Planner / Scheduler Engineer and project manager I think I'm the right person for the job

offer and I hope that you can allow me participate of your recruitments process .

Francisco De la Fuente Droguett Febrero 2015 Page 2 6

RECORD

NAME : DE LA FUENTE DROGUETT, Francisco Javier Patricio

DATE OF BIRTH : 18/07/1956

NATIONALITY : Chilean

: Senior Planner/ Scheduler Engineer

PRESENT POSITION

HIGH SERVICE

Concentrate Copper Plant, Sierra Gorda Construction Project, II Région, Chili

YEARS WITH THE COMPANY :1

CELULAR PHONE : 56 9 64340810

SKYPE REFERENCE : FDELAFUENTE20

MEMBERSHIP OF PROFESSIONAL BODIES

Association of the Engineers Catholic University of Valparaiso (Chile)

EDUCATIONAL BACKGROUND

Electrical Engineer –Universidad Católica de Valparaíso, Chile, 1994

LANGUAGE SKILLS

Speaking Writing Reading

Spanish Mother language Mother language Mother language

English Intermediate Intermediate Advanced

Francisco De la Fuente Droguett Febrero 2015 Page 3 6

PROFESSIONAL RECORD

• 2014

• Planner/ Scheduler Engineer –HIGH SERVICE

Present

• •

2010 2013 Planner/ Scheduler Engineer TRACTEBEL ENGINEERING

• •

2009 Planner/ Scheduler Engineer – CONSTRUCTORA SAN PASCUAL

• •

2009 Planner Tender-CONSTRUCTORA ADRIMAQ

• Planner / Scheduler – IMA INDUSTRIAL

• 2008

• 2007 • Planner Tender-IMA INDUSTRIAL

• 2006 Planner / Scheduler-IMA INDUSTRIAL

• Planner / Scheduler – SERVINGELECTRIC

• 2005

• 2004

• Télécommunication Switch energy projects – SMARTCOM (actual CLARO CHILE )

2005

• •

2003 Electrical supervisor – SMARTCOM (actual CLARO CHILE )

• •

2002 Electrical supervisor – BELLSOUTH ( actual MOVISTAR )

• •

2000 2001 Project Engineer Electrical and facilitues for celular sites – BELLSOUTH ( now MOVISTAR )

• •

1999 2000 Planner / Scheduler – CONSTRUCTORA LAS LILAS

• •

1999 Planner / scheduler – EMELECTRIC

• •

1998 Site Planner/ Scheduler – IMA INDUSTRIAL

• •

1998 Planner / Scheduler – INHEMAR

• •

1997 Planner / Scheduler – INECONS

• •

1994 1996 Site Manager – CONSTRUCTORA ILUFI

• •

1993 1995 Part Time Consultant Engineer in Electrical and Instruments – UNIVERSIDAD SANTA MARIA

• •

1989 1993 Site Manager – CONSTRUCTORA RUCAHUE

• REFERENCES

• 2014 At Present

• CHILE – HIGH SERVICE

Site Planner / Scheduler

• Concentrate copper Plant, Sierra Gorda, II Region

• Budget of 6 million USD and 200 workers

• 2010 2013

• CHILE – TRACTEBEL

Site Planner / Scheduler

Francisco De la Fuente Droguett Febrero 2015 Page 4 6

• Hydro Power Plant Laja of GDF Suez- VIII Region

• Budget of 200 million USD and 900 workers

• 2009

• CHILE – CONSTRUCTORA SAN PASCUAL

Site Planner / Scheduler

• Cryonic insulation Mejillones GNL Plant of GDF Suez-II Region

• Budget of 8 million USD and 400 workers

• 2009

• CHILE – CONSTRUCTORA ADRIMAQ

• Planner Tender

• Study budgets and plan for :

• Power plant reactive control high tension Cerro Navia and Polpaico for ABB - TRANSELEC -

• -MT line to Diego de Almagro S/E to EMELDA power plant

• -Wind Farm EMR IV Region

• 2008

• CHILE – IMA INDUSTRIAL

• Site Planner/ Scheduler

• Power Plant Posco ( Thermoelectric) V Region

• Budget of 1 million USD and 100 workers

• 2008

• CHILE – IMA INDUSTRIAL

• Site Planner/ Scheduler

• Up Grade Electric and Control system Potrerillos Smelting water Plant of CODELCO-III Region

• budget of 0, 5 million USD and 50 workers

• 2008

• CHILE – IMA INDUSTRIAL

• Site Planner / Scheduler

• Control System assembly in Franke copper mine water aduction of Centenario Copper - III Region

• budget of 0, 3 million USD and 50 workers

• 2007

• CHILE – IMA INDUSTRIAL

• Site Planner / Scheduler

• Electrical and instruments assembly and Optical fiber ( 10 KM ) in Colon Concentrated copper Plant of CODELCO-VI

• Region

• budget of 1 million USD and 80 workers

• 2007

• CHILE – IMA INDUSTRIAL

• Planner Tender

• Study budgets and plan as :

Francisco De la Fuente Droguett Febrero 2015 Page 5 6

• -Up grade Control System and Balance of Plant ENDESA Hydroelectric Plants ( El Toro, Abanico, Rapel, Antuco )

• -Canela II Wind Farm ENDESA IV region

• -Posco thermoelectric V region

• -Colmito thermoelectric V region

• -Good Year Tyres plant expanding VI region

• -Collection of sewage waters Teniente mine copper VI region

• -pumps for reservoir of Disputada mine copper Metropolitan Region

• -recovery hydroelectric Ermita Disputada copper mine Metropolitan Region

• 2006

• CHILE – IMA INDUSTRIAL

• Site Planner / Scheduler

• Electrical and instruments assembly with electric substation ( 2 MVA) in Thicken pond of Valle Central Mining–VI Region

• budget of 1 million USD and 120 workers

• • CHILE – IMA INDUSTRIAL

2007

• Site Planner / Scheduler

• Electrical and instruments assembly Sodium chloride Plant with electric

• Region

• budget of 2 million USD and 200 workers

• • CHILE – SERVINGELECTRIC

2005

• Site Planner/ Scheduler

• Electrical assembly and middle tension line inside Alhue gold mine -

• • CHILE – SMARTCOM (now CLARO CHILE )

2004 2005

• Telecommunication Switch energy projects

• Switch area–– Metropolitan Region-II Region and IX Region

• Work as :

• -Electrical Maintenance in Switch RM, Temuco, Antofagasta

• -Energy for new equipment in switchs

• -Replace as Hot swap power Plant continuous current ( 2000 Amps)

• Hot swap rectifiers on power plant rectifier technology 2000 amp

• - Technical maintenance of transformer 400 KVA.

• - Ground rings of switchs and cellular sites

• - Sun panel plant for 1000 Amp/h on Punta patache, cerro blanco, Hor

Antofagasta

• - Electrical high tension line on Mamilla, Antofagasta

• - Equipment aacc 200.000 btu and others on switch

• -Inverters 25 KVA

• -Battery Plants 1600 Amps

• Chief energy projects

Francisco De la Fuente Droguett Febrero 2015 Page 6 6

• • CHILE – SMARTCOM (now CLARO CHILE )

2003

• Electrical Project Engineer

• Electrical and Facilities Project design for cellular sites all the country

• • CHILE – BELLSOUTH ( now MOVISTAR )

2002

• Electrical Project Engineer

• Electrical and Facilities Project design for cellular sites all of the count

• • CHILE – BELLSOUTH ( actual MOVISTAR )

2000 2001

Ingeniero Proyectos eléctricos

Electrical and Facilities Project design for celular

sites all of the country

• • CHILE – CONSTRUCTORA LAS LILAS

2000

• Site Planner / Scheduler

• Open Contract of Construction (of Civil-Mechanical-Electric-Instrumen

• subterranean in mountain range for Andina Copper Mine –CODELCO-

• budget of 2 million USD and 80 workers

• • CHILE – CONSTRUCTORA LAS LILAS

1999

• Site Planner / Scheduler

• Construction Gas Station ( Proof explosion construction ) ( 120 SM3 )

• Andina Copper subterranean Mine –CODELCO- V Region

• • CHILE – EMELECTRIC

1999

• Site Planner / Scheduler

• Electrical and Instruments assembly and New Control system for Crus

• Andina Copper subterranean Mine –CODELCO- V Region

• • CHILE – IMA INDUSTRIAL

1998

• Site Planner / Scheduler

• Electrical and Instruments assembly substation 220 KV copper Mine

• Andina Copper subterranean Mine –CODELCO- V Region

• budget of 1 million USD and 60 workers

• • CHILE – IMA INDUSTRIAL

1998

• Site Planner /Scheduler

• Electrical and Instruments assembly Mill SAG

• Andina Copper subterranean Mine –CODELCO- V Region

• budget of 3 million USD and 400 workers

• • CHILE – INHEMAR

1998

• Site Planner / Scheduler

• Electrical and Instruments assembly Crush Plant inside subterranean co

• Andina Copper subterranean Mine –CODELCO- V Region

Francisco De la Fuente Droguett Febrero 2015 Page 7 6

• • CHILE – SMARTCOM (now CLARO CHILE )

2003

• Electrical Project Engineer

• Electrical and Facilities Project design for cellular sites all the country

• budget of 1 million USD and 100 workers

• • CHILE – INECONS

1997

• Site Planner / Scheduler

• Electrical and Instruments assembly Gas Station ( Proof explosion con

• mine 16 level- CODELCO- V Region

• budget of 2 million USD and 80

workers

• • CHILE – CONSTRUCTORA ILUFI

1994 1996

• Site Manager

• Projects Pavements, earth –moving works and others civil works for C

• • CHILE – UNIVERSIDAD SANTA MARIA

1993 1995

• Part Time Consultant Engineer Electrical and Instruments

• Work as:

• -Optimization operations study Chuquicamata Post mold Plant –CODE

• -Treatment Post Mold Plant, Basic Engineering – CODELCO II Regio

• Technical Consultant

• • CHILE – CONSTRUCTORA RUCAHUE

1989 1993

• Site Manager

• Projects Pavements ( 3 KM ), earth –moving works and others civil wo

Francisco De la Fuente Droguett Febrero 2015 Page 8 6



Contact this candidate