Post Job Free
Sign in

Maintenance Manager

Location:
Kolkata, WB, India
Salary:
Present salery 7.25 lac per annum
Posted:
December 09, 2014

Contact this candidate

Resume:

[pic] CURRICULUM VITAE

g. ashok kumar Education

OBJECTIVE B.E (MANUFACTURING ENGINEERING)

To obtain a growth from

oriented profession where COLLEGE OF ENGINEERING, GUINDY,

I can prove my technical, ANNA UNIVERSITY - CHENNAI -25

competency & to enhance

continuously.

E-mail : Accomplishments

*************@*****.*** Maintenance Planning

Present Address:-

No: 22 A.V.P. Azhagammal Perceived good knowledge in Maintenance planning,

Nagar, scheduling and execution.

Trichy main road, Well versed in preparation & monitoring of

Thanjavur. machineries schedules.

TamilNadu -India. Preparing maintenance budget, strategic plans, Spares

Pin code - 613 005. cost control activities.

Posse's strong knowledge on periodic progress,

Cell no: +91 - Execution of work reviews and controlling.

900-***-****/087******** Familiar to multi discipline projects (Beverages

/Distilleries/ PET bottles).

Personal Data Have strong knowledge with exceptional problem

analytical abilities.

Father's name Experienced in preparation & updating maintenance

V.Gurumoorthy works with scheduling

Have a passion for quality and excellence.

Father's Occupation Leading the planning team, developing subordinates,

Electrician creating team spirit & committed with deliverables.

Have good communication capabilities and presentation

Date of Birth skills.

25/07/1972 Timely problem solving and coordinating with

production department & execution team.

Sex Preparing man and material for Preventive and Break

Male down maintenance work.

Marital Status

Married

Nationality

Indian

Religion

Hindu

Languages Known

Tamil, English, Telugu

POSITIVE TRAITS

Smart worker.

Fast learner.

Team Player.

Innovative thinker.

Self driven.

Knowledge sharer

Maintenance of Production Lines up to 300 BPM in continues process industries.

120 BPM to 300 BPM speed line drawing work and erection of Automatic Bottle

washer machines, Mini tunnel bottle washer, and Universal Rotary bottle washer

machine and maintenance work.

120 BPM to 300 BPM Automatic Mono block filler cum sealer like 20 Head filler/8

Heads sealer,20 Head filler/10 Heads sealer, 30 Head filler/10 Heads sealer,

and 40 Head filler/10 Head sealer.

120 BPM to 300 BPM Labelers like Flatmatic labeler, Rowmatic labeler and

Multimatic Labeler erection and maintenance work.

SS Slat chain conveyors, Belt conveyors, Magnetic conveyors erection and

maintenance work.

Varieties of Worm reduction gear boxes with different ratios and planning of

preventive schedule and execution of maintenance work.

Vacuum Pumps, Mono block water pumps, Liquor transfer pumps, Split casing pumps

(range:300 m3 per hour coupled with 100 HP motor).

D.M Plant, RO plant membrane installation and SS Pipe line fabrication and

fixing. Erection of water treatment vessels and pipe lines fabrication.

Cooling tower gear boxes and Pipe line fabrication and erection work.

Boiler fire tube type with capacity of 8TPH and 14 TPH monitoring and maintain

the performance and maintenance work.

Generator set 600KVA and 500 KVA planning of annual maintenance and records

and execution of maintenance work .

350 KW Steam Turbine with power generation of 6000 units per day.

Material Handling equipments Forklifts, Battery Operated platform truck,

Hydraulic trolley works.

70KL,60KL,50KL,45KL capacity SS tanks with agitator assy. by gearbox drives.

And Circulation type with high pressure pump and pipe system for mixing.

Screw compressor, High pressure compressor and Reciprocating compressor annual

maintenance Planning and scheduling with Pneumatic fitting and pipe lines and

FRL units, and NRVs and Rotes valves.

Presenting to top management about the performance of the machines to improve

the production.

SAP Computerized system Maintain minimum level spares with Material Planning,

Raising of purchase requestisation, Making of Purchase Order, Material

inspection work.

Project Coordination & Management Information Systems

Proverbial with project coordination.

Project monitoring in terms of work progress.

Reviewing states of purchased orders to the supplier.

Collecting reports from periodically, reviewing the performance and giving

necessary feedback to ensure that the project is moving as per plan.

Arranging the resources as per requirements of work.

Optimizing the resource, establishing productivity standards and enhancing

utilization.

Supporting to maintenance team in technical requirements and clarifications.

Timely completing the maintenance work.

Conducting review meetings with team periodically for controlling.

Communicating management requirements, goals to teams.

Management information systems

Presenting the progress status machine performance.

Production and Brake down reports generating and monitoring and controlling of

machines.

Prepare material requirements for month wise and Yearly wise for long end

supplier.

Prepare purchase requisition and get approval from Engineering Head.

SAP system used to Prepare purchase order and Invoice Making and clearing. And

stores stock monitoring.

Maintain Monthly maintenance expenses as per the amount allocated.

Forecasting the budget for the maintenance expenses.

QUALIFICATION

QUALIFICATION SCHOOL/ COLLEGE YEAR OF CLASS/

PASSING PERCENTAGE

SSLC 1987 52.0%

Govt. Higher Secondary

School, (State Board)

TamilNadu.

Meenashi ammal 1992 68.0%

Diploma Polytechnic,

(Mechanical Uttiramerur,

Engineering) KanchipuramDt.

TamilNadu.

B.E (Manufacturing 2010 71.0%

Engineering) College of Engineering,

Guindy, Anna University,

Chennai-25.

CAREER GROWTH

Joined in Parle Exports Ltd. in chittoor (A.P) as a Diploma Engineer

on 17.04.1995 worked in Juice process and concentration and filling units

with various Departments Forced Circulation Evaporator, Scrapped Surface

Evaporator, Sterilization unit, Aseptic Filling unit, MAZZA Bottling unit,

Bisleri Pet Bottle unit promoted to Shift In charge of the Plant.

Then worked in UNITED SPIRITS LTD in chennai as Assistant Manager -

Engineering in Maintenance Department on 15.05.2000 to 12.11.2011.

Maintenance in charge for a Bottling Production Department, Blending

Department, Boiler, Re - Distillation Plant, Water Treatment Plant and

Effluent Treatment plant.

Presently working in Kals Distilleries Pvt.Ltd, Pudhukkottai as

Deputy Manager Production and Engineering on 14.11.2011.

Achievements

> Second Topped in manufacturing department in College of

engineering Guindy - Anna University.

> Consistent Top performer in the organizations.

> Received citation for academic project work in M/s Balaji

Distilleries.

> Participated in Meetings to improve the productivity in Speech.

> Training given to team to achieve maximum utilization of

machine.

> Enhanced self, through various trainings in technical &

behavioral aspects.

Year Company Role Works experienced from the project

1995 PARLE EXPROTS LTD., In charge Juice (Mango, Papaya, Banana)

to Concentration processing unit.

2000 CHITTOOR, MAZZA bottling unit.

ANDHRA PRADESH PET (Bisleri) bottling unit.

2000 UNITED SPIRITS LTD, Assistant IMFL Bottling unit with High speed

to Manager - lines (300 BPM).

2011 POONAMALLE, Engineering Blending Unit, Engineering Stores,

CHENNAI - 56 Boiler, Re- Distillation Plant,

Water Treatment Plant, DM Plant, Ro

Plant, Effluent Treatment Plant.

2011 to KALS DISTILLERIES Deputy IMFL Bottling unit with High speed

Still PVT. LTD. Manager lines.

PUDHUKKOTAI. Production

Engineering

I assure you that all the information given above is true to my knowledge.

Date:24.09.2014

Yours Faithfully,

Place: Thanjavur

( G. Ashok kumar).



Contact this candidate