Kaye Gullett
**** ********** **** -**********, ** 75067 USA 214-***-****
****@******.***
CONFIGURATION MANAGER / PROJECT MANAGER
Empowering customers through the skillful and deliberate delivery of quality products
PROFESSIONAL PROFILE
Innovative Configuration Specialist with 19 years of experience in Configuration Management and IT
business process engineering, driven to deliver excellent quality and cost effective projects, using extensive
experience in managing applications on multiple platforms.
Respected Leader able to build policies and processes that drive top and bottom line performance. Key
strengths in:
Configuration management Communication & presentation
Implementation management ITIL and CMM frameworks
Release Management Team building & leadership
Learning and negotiation skills
PROFESSIONAL EXPERIENCE
VERIZON COMMUNICATIONS, Irving TX, USA 2001 – Present
01/2007 – Present VERIZON DATA SERVICES International LLC, Irving, TX, USA
Configuration Release Manager
• Led a Configuration Management (CM) migration program for business critical systems to a centralized
Integrated Project Management (IPM) and CM platform
• Managed design and utilization of automated IPM build and deployment processes for IT applications by
employing the DevOps approach
• Established the Implementation Management division of the CM team
• Provided Project Management (PM) for implementing CA Application Performance Management
(APM ) on Verizon applications
Accomplishment highlights
• Developed industry standard business processes using ITIL and CMM frameworks and methodologies
• Ensured the code delivery process was compliant with Sarbanes Oxley and FCC regulations as defined by
Verizon Legal
• Implemented a “follow the sun” service desk model for CM across multiple geographical locations
• Completed migration of 170 systems to the IPM tool in 24 months exceeding the set objective of 150
applications
• Led the CM team to complete automation of build and delivery processes for 80 applications in 24
months
• Designed and implemented Release Implementation standard processes utilizing a combination of on-
shore and off-shore personnel
• Managed successful major, minor, and special release implementation projects for 66 product lines
• Completed implementation of CA APM on 12 applications across multiple platforms
• Ensured access was in compliance with corporate policies and procedures for over 250 users
03/2001 – 12/2006 VERIZON TELECOM, Irving TX, USA
Configuration Manager
• Ensured on-time compile and delivery to Test and Production environments of code stored in CM
Synergy and Endevor for UNIX, LINUX, Windows, and Mainframe platforms
• Implemented standardized procedures and automation for code compile and delivery utilizing CMM
guidelines to reduce code processing time and increase quality
• Participated as a key member of the Risk Identification and Avoidance team
• Prepared Software Configuration Management Plans, participated in the Software Configuration Control
Board, and ensured team adherence to production schedules
Kaye Gullett Page 2
Accomplishment highlights
• Led the CM team in migration of source code into CM Synergy for 75 applications
• Automated UNIX compile processes using ANT and shell scripting
• Reduced the application build and delivery costs by 50% and streamlined processes
• Established cross-training so all team members provided consistent support to internal customers
CAPROCK COMMUNICATIONS, Addison TX, USA 2000 – 2001
Production Control Specialist
• Defined and documented a method of performing manual version control and software release processes
• Performed evaluation of CM tools for use in the CapRock environment
• Coordinated internal software releases for the CapRock Production environment
Accomplishment highlights
• Developed CMM Level II processes for the CM team
• Created a vendor evaluation questionnaire for CM tools, set up vendor demonstrations with PVCS and
Perforce, and began negotiations
PAGENET, Dallas TX, USA 1999 – 2000
Version Control Specialist
• Coordinated internal software releases for the PageNet Production environment
• Maintained shell and batch deployment scripts for UNIX and Windows applications
• Supported Y2K efforts by performing test of Production Control tools and processes
• Installed and configured MKS Source Integrity version control tools
Raytheon/Texas Instruments, Lewisville TX, USA 1993 – 1999
Configuration Management Technician
• Executed regular version control activities for a variety of mission critical missile systems software on
multiple platforms in accordance with military standards
• Facilitated software change control board meetings to support software release schedules and product
builds
• Managed and maintained software development libraries and backups.
• Worked closely with product developers, management staff, and software quality management personnel
to develop, improve, and document SCM processes in line with Six Sigma, SEI, and ISO standards
• Provided software application training to program team members, enabling them to more efficiently
utilize tools
Trained in processes embodied in SEI Capability Maturity Model, ISO 9001, and MIL STD
•
EDUCATION
AAS Computer Information Systems
North Lake College, Irving TX
SKILLS
Platforms and Operating Systems
• UNIX/LINUX, Windows, IBM Mainframe, VMS
Languages and Applications
UNIX shell scripts, UNIX Make, C, Windows batch
•
CM Synergy, MKS Source Integrity, Rational APEX, CMS, SCMS, Access; eXceed; Informix; Make; RCS;
•
SCCS