Post Job Free

Resume

Sign in

Engineer Manager

Location:
Caney, KS, 67333
Salary:
60000 to 80000
Posted:
December 04, 2014

Contact this candidate

Resume:

C URR IC ULU M V I TAE

NA ME:CHETAN RA MESH KALE

Mobile: +1-918-***-**** / +372-********

E-mail:- acgxs2@r.postjobfree.com

O BJECT I VES

To achieve a challenging position that may explore my potential

k nowledge & skills that w ill help the organization in achieving the

objectives.

ED UCAT IONAL CREDE N T IA LS

1) BS. Mechanical in 2000 – 2004 Nixon University,USA.

2) I ndustrial t raning in welding 1999-2000 Govt. collage,

N asik,M H, India.

3 ) 12th Sci.in 1997-1999 Pune University Maha rashtra,India

4) 10th in 1996 Pune University Maharashtra, India

CAREER GRAP H

1) At P resent F rom 23 rd Oct.working in Engineered Systems &

E quipment I nc. Caney,Kansas,USA

2) Dec 29th 2012 to Aug.2014 Shift Supervisor Star Steel

I n te rnational L LC,sharjah,Dubai

3) 28th 2012 to 16th Dec.2012 Assi. Manager Bhushan steel ltd,

A ngul, O r r isa. ( India)

4 ) April 9th 2009 to July 31st 2012 Assi.Manager SMS-Mech

G eosteel llc,Rustavi,Georgia (Group of Jindal)

5 ) Dec.2007 to Feb.2009 Shift Engineer Kafue steel ltd,Zambia

( Africa)

6 ) July.2004 to Nov.2007 Engineer . Vi raj profile ltd,SMS-2

Ta rapur,Boisar,Mumbai( I N D IA)

JOB PROF I L E

* Responsible for preventive & breakdown maintenances of plant &

modification as process.

* Erection & commissioning GEOSTEEL L LC.GEORGIA,EAF,LRF &

H ydraulic system, Bail ing press, share

M / C,Static cranes & Ellagator share commissioning .

* EAF,LRF & CCM Hydraulic MS pipe l ine made it & pickling done. * EAF

water cooled roof,shell height & EBT panel successful modification done.Arm

h ight increase 300mm with top shell height 300 mm. * EAF roof swing main

bearing removed & fixed mobile crane bearing fixed successfully . * Bail ing

p ress Ejector cylinder system f low divider fixing done to protect cylinder rod. *

E AF Hydraulic MS l ine & Non magnetic zone MS pipe l ine rerouting done.

* Hydraulic piston pumps,gear pumps, solonide valve, proportional valve

m aintenance done.

* SMS scrap feeding scrap chute (manually + Auto) made it. * All igator share

cylinder piston modification done.

* Vesuvius LG 20 & 2 QC slide gate adapter plate fixed it in ladle with slide

gate mechanism. * Vesuvius slide gate LG 20- spring testing every heats &

save the slide gate machanism.

* Erection & commissioning U MCIL LTD,ZAMBIA. EAF,LRF,CCM &

H ydraulic system. * EAF, LRF & CCM Hydraulic MS pipe l ine made it &

p ickling done.

* Erection & commissioning VIRAJ PROFILE LTD,SMS-2,Oxygen plant, Gas

p ipe l ine & Hydraulic * * GEOSTEEL L LC -: * 8mm to 32mm Rebar M i l l

equipments supplied M /s NCO,Italy.

* A keen planner,strategist and Implementer with demonstrated abilit ies in

M aintenance & project Management. Proficient in conducting Root cause

a nalysis & Quick breakdown solutions. * Preventive,predictive & breakdown

m aintenance of bloom reheating furnace,three high roughing mi l l,15 stands

Countinuos mil l, flying shear machines, TMT, cooling bed,cold shear

m achine. * * STAR STEEL I NTERNATIONAL L LC * 8mm to 40mm Rebar

M i l l * Structural M i l l we produce 203*133*25,

203*102*23,178*102*19,152*89*16, 150*75*14,

127*76*13.160*82*12.30,100*55*6.72 * • Preventive & Break down

m aintenance, overhauling Maintenance of Rebar mil l & Structural M i l l

i ncluding mil l equipments supplied from M /s. NCO-Italy, v 60 TPH Furnace.

v L ubrication, Hydraulic and Pneumatic System maintenance, v Two strand

chopping shears, Rotary Dividing shears, Cold shear, Start and Stop shear, v

L aying Head (Turn Forming Head), v Horizontal,Vertical and Universal

Stands in structural M i l l v Moving rack Cooling Bed, v Cooling Conveyors

a nd Conveyor roller tables, v Binding Machine of M /s. Sider plant (Italy),

Welding & gas cutting as per emergency,Job Alignment and Erection.

Job modification as per requirement. Hydraulic & Pneumatic system

m aintenance, Pusher Type Furnace, Lubricant system maintenance, Stand

assembly for 2 hi reversible mil l, Oil pump & Water pump. Maintenance. Gear

& Gear box assembly & dismantl ing, Complete maintenance of 5 to160 MT

E OT Cranes. Job Alignment & Erection

ACH I EVR ME N TS

Redesigned PM charts, work instruction for section. Prepared new PM charts

for newly installed machines Predictive Maintenance- Vibration Analysis

started for critical equipments ( Furnace air blower, M i l l drive gearbox,

F lywheel & Pinion s tand)

C OMP U TER SK I L LS :

Basic computer Knowledge (MS Office Word, Excel, Power Point, Outlook

Exp.)

Knowledge of

“SAP” for Materials Indent.

ISO DOCUMENTATION & Process.

PERSONAL V I TAE

Date of birth 24th August 1981

Passport No. F – 6775489

Permanent address : Mr. Chetan Ramesh Kale

c/o Ramesh H.Kale

Boravke Nagar,Srirampur,Ahmadnagar.

M aharashtra,( India)

M art ial status : Mar r ied

L anguages known : Marathi, H indi,English, Georgian & Russian

( C HETAN

R A MESH KALE )



Contact this candidate