C URR IC ULU M V I TAE
NA ME:CHETAN RA MESH KALE
Mobile: +1-918-***-**** / +372-********
E-mail:- *******@*****.***
O BJECT I VES
To achieve a challenging position that may explore my potential
k nowledge & skills that w ill help the organization in achieving the
objectives.
ED UCAT IONAL CREDE N T IA LS
1) BS. Mechanical in 2000 – 2004 Nixon University,USA.
2) I ndustrial t raning in welding 1999-2000 Govt. collage,
N asik,M H, India.
3 ) 12th Sci.in 1997-1999 Pune University Maha rashtra,India
4) 10th in 1996 Pune University Maharashtra, India
CAREER GRAP H
1) At P resent F rom 23 rd Oct.working in Engineered Systems &
E quipment I nc. Caney,Kansas,USA
2) Dec 29th 2012 to Aug.2014 Shift Supervisor Star Steel
I n te rnational L LC,sharjah,Dubai
3) 28th 2012 to 16th Dec.2012 Assi. Manager Bhushan steel ltd,
A ngul, O r r isa. ( India)
4 ) April 9th 2009 to July 31st 2012 Assi.Manager SMS-Mech
G eosteel llc,Rustavi,Georgia (Group of Jindal)
5 ) Dec.2007 to Feb.2009 Shift Engineer Kafue steel ltd,Zambia
( Africa)
6 ) July.2004 to Nov.2007 Engineer . Vi raj profile ltd,SMS-2
Ta rapur,Boisar,Mumbai( I N D IA)
JOB PROF I L E
* Responsible for preventive & breakdown maintenances of plant &
modification as process.
* Erection & commissioning GEOSTEEL L LC.GEORGIA,EAF,LRF &
H ydraulic system, Bail ing press, share
M / C,Static cranes & Ellagator share commissioning .
* EAF,LRF & CCM Hydraulic MS pipe l ine made it & pickling done. * EAF
water cooled roof,shell height & EBT panel successful modification done.Arm
h ight increase 300mm with top shell height 300 mm. * EAF roof swing main
bearing removed & fixed mobile crane bearing fixed successfully . * Bail ing
p ress Ejector cylinder system f low divider fixing done to protect cylinder rod. *
E AF Hydraulic MS l ine & Non magnetic zone MS pipe l ine rerouting done.
* Hydraulic piston pumps,gear pumps, solonide valve, proportional valve
m aintenance done.
* SMS scrap feeding scrap chute (manually + Auto) made it. * All igator share
cylinder piston modification done.
* Vesuvius LG 20 & 2 QC slide gate adapter plate fixed it in ladle with slide
gate mechanism. * Vesuvius slide gate LG 20- spring testing every heats &
save the slide gate machanism.
* Erection & commissioning U MCIL LTD,ZAMBIA. EAF,LRF,CCM &
H ydraulic system. * EAF, LRF & CCM Hydraulic MS pipe l ine made it &
p ickling done.
* Erection & commissioning VIRAJ PROFILE LTD,SMS-2,Oxygen plant, Gas
p ipe l ine & Hydraulic * * GEOSTEEL L LC -: * 8mm to 32mm Rebar M i l l
equipments supplied M /s NCO,Italy.
* A keen planner,strategist and Implementer with demonstrated abilit ies in
M aintenance & project Management. Proficient in conducting Root cause
a nalysis & Quick breakdown solutions. * Preventive,predictive & breakdown
m aintenance of bloom reheating furnace,three high roughing mi l l,15 stands
Countinuos mil l, flying shear machines, TMT, cooling bed,cold shear
m achine. * * STAR STEEL I NTERNATIONAL L LC * 8mm to 40mm Rebar
M i l l * Structural M i l l we produce 203*133*25,
203*102*23,178*102*19,152*89*16, 150*75*14,
127*76*13.160*82*12.30,100*55*6.72 * • Preventive & Break down
m aintenance, overhauling Maintenance of Rebar mil l & Structural M i l l
i ncluding mil l equipments supplied from M /s. NCO-Italy, v 60 TPH Furnace.
v L ubrication, Hydraulic and Pneumatic System maintenance, v Two strand
chopping shears, Rotary Dividing shears, Cold shear, Start and Stop shear, v
L aying Head (Turn Forming Head), v Horizontal,Vertical and Universal
Stands in structural M i l l v Moving rack Cooling Bed, v Cooling Conveyors
a nd Conveyor roller tables, v Binding Machine of M /s. Sider plant (Italy),
Welding & gas cutting as per emergency,Job Alignment and Erection.
Job modification as per requirement. Hydraulic & Pneumatic system
m aintenance, Pusher Type Furnace, Lubricant system maintenance, Stand
assembly for 2 hi reversible mil l, Oil pump & Water pump. Maintenance. Gear
& Gear box assembly & dismantl ing, Complete maintenance of 5 to160 MT
E OT Cranes. Job Alignment & Erection
ACH I EVR ME N TS
Redesigned PM charts, work instruction for section. Prepared new PM charts
for newly installed machines Predictive Maintenance- Vibration Analysis
started for critical equipments ( Furnace air blower, M i l l drive gearbox,
F lywheel & Pinion s tand)
C OMP U TER SK I L LS :
Basic computer Knowledge (MS Office Word, Excel, Power Point, Outlook
Exp.)
Knowledge of
“SAP” for Materials Indent.
ISO DOCUMENTATION & Process.
PERSONAL V I TAE
Date of birth 24th August 1981
Passport No. F – 6775489
Permanent address : Mr. Chetan Ramesh Kale
c/o Ramesh H.Kale
Boravke Nagar,Srirampur,Ahmadnagar.
M aharashtra,( India)
M art ial status : Mar r ied
L anguages known : Marathi, H indi,English, Georgian & Russian
( C HETAN
R A MESH KALE )