Executive Summary
Senior Engineer/Manager with more than 25 years of experience in design,
engineering, documentation development, erection and commissioning.
Experience in construction-erection, commissioning and start-up of power
plants, substations, desalination plants, pipelines and industrial
facilities.
Product experience with large Generators, Switchgear, I&C, DCS/SCADA
installation-commissioning experience. Training of Commissioning and O&M
personnel in particular Control systems, Mechanical and Electrical BOP,
Standby & Emergency Plant. Coordination of Maintenance and HSE-Permit-to-
Work systems.
Good Oil&Gas experience (onshore-refinery) particularly I&C and electrical
field.
Core Qualifications
- Lead multiple disciplined teams on delivery of large, complex,
integrated projects,
- Provide leadership in the development of the Electrical and I&C
Engineering teams,
- Strong project commissioning management and team organization skills,
- Assume responsibility for management of medium to large scale
projects,
- In the capacity of a line manager, manage, coach and develop team
members,
- Senior consultants for design, construction, installation &
commissioning of power plants,
- Report writing and presentation of work progress, contractor
performance & schedules at Government/ owner level management
meetings,
- Construction field supervision (E&IC),
- Project engineer on large desalination plant,
- Rehabilitation supervision on large substations and HV distribution,
- Experience in Hydro, Thermal and Solar (CSP) power plants,
- In depth knowledge of industry standards,
- Strong knowledge of installation standards and installation standard
drawings,
- Excellent interpersonal skills with the ability to communicate at all
levels,
Education and Courses
Faculty of Maritime Studies University of Rijeka, Croatia - BSc in Marine
Electronics, Engineering and Information Technology,
Polytechnics Institute of Rijeka, Croatia - Industrial electric technician,
ABB Mannheim Germany 2006 - MicroSCADA Basic Course
ABB University Switzerland 2010 - Protection and Substation Automation -
MicroSCADA Pro for Substation Automation
Advanced usage of MS Windows and UNIX (Linux) operating systems, CAD&CAE (P-
CAD, Visio), Access, Excel, Word and MS Project.
Languages
ENGLISH - fluent
ITALIAN - fluent speaking, well understanding and writing
FRENCH - basic, technical
Professional Experience
Commissioning Manager - February 2013 / September 2013
Employer: SPIE Oil & Gas LLC UAE - Madinat Zayed, Abu Dhabi
Project: Shams-1, Concentrated Solar Power (CSP), steam turbine (100MW
total project value $400m)
Leading SPIE Oil&Gas technical support team (Lead I&C Engineer, Lead
Electrical Engineer and 12 Instrument technicians) contracted by Shams-1
power plant to support owners commissioning team. Responsible for all
aspects of electrical, I & C commissioning works. Commissioning includes
Solar Steam Generator (SSG-Foster Wheeler), 7 Heat Transfer Fluid Heaters
(TEI-Babcock), 2 Steam Heaters (TEI-Babcock), MAN Steam Turbine, Brush 120
MW generator, 220kV GIS Switchgear and associated auxiliaries.
Coordinating commissioning activities, supporting Owner commissioning
Manager and ensure commissioning management in case of his absence, review
and verification of designs, method statements, commissioning certificates
and procedures.
Commissioning Manager - July 2011 / March 2012
Employer: Salini Hydro Ltd. - EPC Company - Uganda
Project: EPC - Bujagali Hydropower plant (5x50MW Kaplan turbine)
Duties: Commissioning Manager on Bujagali 250MW (total project value $600m)
power plant in final construction stage. Responsible for
construction/erection, pre-commissioning and commissioning of electro-
mechanical equipment (primary & balance of plant equipment), schedule
meetings with Owner and all subcontractors. Payment progress authorization.
Budget planning and control related to commissioning
activities.Coordinating the Subcontractor's activities, liaison with
Client, review and verification of electro-mechanical design, operating &
maintenance manuals, method statements, commissioning procedures..etc.
Senior Consultant Engineer - November 2010 / February 2011
Client: EVN - SlaMB - Vietnam
Employer: SMEC International - PMC
Project: Son La Hydropower plant (6x400MW)
Duties: Member of SMEC's team of consultants for design, construction,
installation & commissioning of 2400MW power plant (total project value
$1.2b). Day to day monitoring of construction progress. Further concerned
with adherence of contractor installed plant performance to specifications,
pursuing contractor QA/QC & project time schedule issues. Involved with
commissioning of Primary & Balance of Plant equipment, Alstom/ Areva
Electrical Protection schemes for 18/500kV generation & transmission
systems in conjunction with Alstom DCS/SCADA & control system installation.
Report writing/ submission, also presentation of work programs, contractor
performance & schedules at Government/ owner level management meetings.
Senior C&I Engineer - January, 2010 / April, 2010
Client: NEC - National Electricity Corporation, Khartoum - Sudan
Employer: INTERCON TIS L.L.C. Abu Dhabi, U.A.E
Project: Interconnection of new HV Substation RTU to the Power Plant
Control System
Duties: Integrating new HV substation with Power plant Control System,
Procontrol P14, through ABB RTU560 serial link with Modbus protocol.
Project documentation creation, installation of necessary equipment and
instrumentation, redesign the RTU and developing new software
configuration.
Rehabilitation Erection Supervisor / Lead Commissioning Engineer -
December, 2007/March /2009
Client: NEC - National Electricity Corporation, Khartoum - Sudan
Employer: ABB AG - Power Technologies Division EPC Company
Project: Blue Nile Grid Rehabilitation Project
Duties: Commissioning of 2 new GIS 110/66/11 kV and 2 new 33/11kV GIS/AIS
substations. Control system includes ABB RTU560 remote terminal units,
REF542+ Station level controllers, Eberle AVR's. Rehabilitation of 3
existing 220/110/33/11kV substation by replacing HV Circuit breakers,
Control and protection panels and connecting to new LDC (Load Dispatching
Center). Along with commissioning, all necessary documents preparation
(Commissioning Test Specification, Commissioning Test Plan, Commissioning
Test Report, Commissioning Test Procedures, As-Build documents
Commissioning Team Leader - February, 2007 / October, 2007
Client: KAHRAMAA Qatar General Electricity & Water Corporation - Qatar
Employer: ABB AG - Power Technologies Division, EPC Company
Project: Qatar Power Transmission System Expansion - Phase VI - Part 2
Duties: Commissioning of new 66/11 kV substations. Control system includes
ABB MicroScada REF542+ (BCU) Station level controllers, Eberle AVR's. Along
with commissioning, all necessary documents preparation (Commissioning Test
Specification, Commissioning Test Plan, Commissioning Test Report,
Commissioning Test Procedures, As-Build documents
Control System Commissioning Engineer - November, 2005 / July, 2006
Client: UNDP - United Nations Development Program - Iraq
Employer: ABB AG - Power Technologies Division, EPC Company
Project: Electrical Network Rehabilitation Program Kurdistan Northern Iraq
- Sulaimaniyah Stage 2
Duties: Commissioning of three 132/33/11 kV substations. Control system
includes 3 VA-TECH AK1703 (BCU) Station level controllers, 23 AM1703 Bay
level controllers and 3 VA-TECH SCADA systems SAT230. Along with
commissioning, all necessary documents preparation (Commissioning Test
Specification, Commissioning Test Plan, Commissioning Test Report,
Commissioning Test Procedures, Typical Flow-Charts, As-Build documents
Commissioning of Cewe Instrument "Cetrics", Computer Telecounting Tariff
System on five substations (Kallar, Said Sadiq, Old Dokan, Penjween and
Qualadiza).
Lead Design Engineer - March, 2004/ May, 2005
Client: MKES - Marine & Industry department - Croatia
Employer: MKES - Marine & Industry department
Project: MCC and control panels design
Duties: Initial design of microprocessor controlled MCC for water pumps and
control panels for diesel generators (200 to 500 KW). After acceptance,
software and pc board development, assembly and testing.
Lead Commissioning Engineer - September, 2001/ November, 2003
Client: SOGEM - Republic of Mali, West Africa
Employer: ALSTOM POWER Generation AG, EPC Company
Project: Hydro Power Station Manantali - 5 x 47 MW Kaplan turbines
Duties: Commissioning of 5 x 47 MW Groups at Manantali HPS. Control system
includes 8 AC410 Advant controllers, 5 AC70 small controllers and 3 AS500
OS, NT based operation stations. Partially redesign of relay logic, s-build
documentation creation. Control loop checking. System integration.
Commissioning Test Plan and Test procedures writing.
System applications where partially rewritten and along with commissioning,
training of local engineers conducted. Partial documentation creation
(Operating criteria, Operating Manual).
Project Engineer - February, 2000/ February, 2001
Client: SWCC - Saudi Arabia
Employer: ABB Automation - Milan, Italy
Project: Desalination Plant and water pipeline -Shoaibah Phase 2 - LOT 2
Duties: Design and engineering of a Data Acquisition & Control System for
the Shoaibah Phase 2 - LOT 2 - Water Transmission system Project -
desalination plant. System included 13 AC450 controllers, 61 AC70
controllers, 18 AS500 OS (UNIX) operator stations, 3 IMS (UNIX) stations
and one AS500 ES.
The scope of supply was new Data Acquisition and Control (DAC) system
relevant to the water pipelines Shoaibah-Jeddah and Shoaibah-Makkah-Taif.
Shoaibah-Jeddah was a new pipeline, while Shoaibah-Makkah-Taif was an
existing pipeline the capacity of which shall be increased by the addition
of new pumping units and other station devices.
It was foreseen to provide a complete new Data Acquisition and Control
(DAC) system for use with Jeddah pumping system and to replace the existing
systems (BBC) in use for the Makkah-Taif pumping system, including design,
manufacture, configuration, programming, factory testing, delivery to site,
installation supervision, site testing, commissioning and provision of
record drawings, documentation and maintenance manuals.
Joined project as project specialist. Duties included system integration,
AC450/AC70 application development, multiple MVI-RCOM redundant
configurations, multiple MVI-MODBUS configuration and LCD panel application
design, MB300E extension through LanBridges, MB300E extension in multi drop
configuration trough LAN Routers over telecom system, AF100 redundant
configuration, AS500 Operation Station software installation and
configuration, Display design. Mimic panel application design. Partial
documentation creation (FDS - Function Design Specification, DDS - Detailed
Design Specification). TCP/IP plant network configuration. Factory
Acceptance Test.
ITT Consultant Engineer - January, 1998/May, 1999
Client: Diverse - Croatia
Employer: Freelance Engineer
Project: Diverse
Duties: Consulting Engineer for computer communication networks.
Participate in planning, design, installation and commissioning of
different systems; operating personnel training.
Telecommunication Engineer - February, 1988/December 1997
Employer: Mup - Rijeka - Croatia
Duties: Installation and maintenance of Motorola telecommunication
equipment. Installation and commissioning of point to point radio links,
point to point microwave links and point to multipoint radio network. From
1990 - 1997 computer networks engineer, responsible for planning, design,
installation and network administration.
I&C Engineer - February, 1984/January, 1988
Employer: ATM - INA - Refinery Rijeka - Croatia
Duties: Member of maintenance department. Managed a small team of I&C
technicians on daily maintenance activities. Investigation for root cause
in case of any instrument equipment related incidents. Provided technical
support to instrument engineering activities in refinery. Maintained
equipment's and prioritized their repair according to need.
Safety Engineer - November, 1982/January, 1984
Employer: DINA - PETROKEMIJA, DOW CHEMICAL & INA j. v. - Croatia
Duties: Safety Engineer, responsible for safety procedure, training
personnel, supervising of safety equipment.
Control System Engineer - July, 1980/November, 1982
Employer: IMP - Industrial Installation - Croatia
Duties: Control System Engineer working on installation, start-up and
maintenance of HVAC systems.
E&I Technician - August, 1973/May, 1977
Employer: ATM - BRACA KAVURIC - EPC Company Croatia
Project: Aromatic Plant - Refinery Rijeka
Duties: E&I Technician, working on construction of Aromatics plant in INA
Refinery Rijeka. Duties included installation of instrumentation, electric
power distribution, MCC - electric control panels, pumps and firefighting
system.
[pic]