Post Job Free

Resume

Sign in

Engineer Supervisor

Location:
Strongsville, OH
Posted:
December 01, 2014

Contact this candidate

Resume:

PETER NADHAZY

LAKEWOOD, OHIO

216-***-****

acgwah@r.postjobfree.com

EXPERIENCED AUTOMOTIVE MANUFACTURING MANAGER SEEKS NEW OPPORTUNITIES, WHICH WILL ALLOW USE OF OVER A

DECADE OF SKILLS GAINED AT FORD MOTOR COMPANY CASTING AND ASSEMBLY PLANTS. A PASSION FOR AUTOMOTIVE

TECHNOLOGY HAS MOTIVATED ME TO BRANCH OUT INTO A MORE CREATIVE AND HANDS-ON APPROACH BUILDING AND

MARKETING AUTOMOBILES. TOP-NOTCH MANAGERIAL SKILLS, KNOWLEDGE OF FACTORIES AND THE WILLINGNESS TO LEARN

SOMETHING NEW MAKES ME A SOLID CANDIDATE FOR FRESH ENDEAVORS.

EXPERIENCE

SUPERVISOR/PROCESS COACH

FORD MOTOR COMPANY

OCTOBER 2010 - PRESENT (3 YEARS 10 MONTHS) CHICAGO, IL

+ FRONT LINE SUPERVISOR/PROCESS COACH WITH IN THE FINAL ASSEMBLY AREA FOR THE FORD EXPLORER, LINCOLN MKS

AND FORD TAURUS.

+ SUPERVISE 65 HOURLY EMPLOYEES. 40 ARE PRODUCTION AND 15 ARE REPAIR TYPE.

+ MONITOR JPH WITH GOAL OF 65 UNITS PER HOUR.

+ HOLD HEARINGS OF ACCOUNTABILITY WITH OPERATORS WITH REGARDS TO DEFECTS AND DOWN TIME.

+ MONITOR QLS INFORMATION TRACKING DEFECTS FROM OTHER AREAS AND WORK WITH OTHER SUPERVISORS/PROCESS

COACH'S TO CUT OFF AND ELIMINATE DEFECTS.

MAINTENANCE SUPERVISOR

FORD MOTOR COMPANY

MARCH 2007 – OCTOBER 2010 (3 YEARS 8 MONTHS) BROOKPARK, OHIO

+ LEAD A CREW OF 4 MILLWRIGHTS, 2 PIPEFITTERS, 2 ELECTRICIANS AND A WELDER.

+ SUPERVISE THE DAILY MAINTENANCE ON FOUNDRY EQUIPMENT SUCH AS CUPOLA SYSTEMS, SKIP HOISTS, HOLDING FURNACES,

OVERHEAD HOISTS, AND 6 TON METAL DELIVERY CRANES.

+ ALSO WORK ON ENVIRONMENTAL SYSTEMS SUCH AS 1000 H.P. FANS, BAG HOUSES, DUST COLLECTORS AND MIST

ELIMINATORS.

+ USE STANDARD WORK ORDER SOFTWARE TO TRACK MAN HOURS, PARTS AND COST OF JOBS COMPLETED.

+ HAVE ACHIEVED AN EXCELLENT PLUS PERFORMANCE REVIEW FOR EVERY YEAR OF SERVICE.

MANUFACTURING TECHNOLOGIST (PROCESS ENGINEER)

FORD MOTOR COMPANY

MARCH 2005 – MAY 2006 (1 YEAR 3 MONTHS) BROOKPARK, OHIO

+ PROCESS ENGINEER FOR MELT DEPARTMENT. RESPONSIBLE FOR ALL DOCUMENT CONTROL

+ EXTENSIVE INTERACTION WITH SUPPLIERS OF ALL RAW MATERIALS FOR MELTING AREA.

+ CONTROLLED AND COORDINATED INSTRUMENT AND WEIGHT HOPPER CALIBRATIONS WITH IN DEPARTMENT.

+ WORKED WITH DCP (DYNAMIC CONTROL PLAN) MEETINGS WITH HOURLY AND SALARY PERSONNEL.

+ PERFORMED TRIALS OF NEW ALLOYS AND MATERIALS WITH COST SAVING GOALS USING SIX SIGMA.

PRODUCTION SUPERVISOR

FORD MOTOR COMPANY

AUGUST 2000 – FEBRUARY 2005 (4 YEARS 7 MONTHS) BROOKPARK, OHIO

PETER NADHAZY

LAKEWOOD, OHIO

216-***-****

acgwah@r.postjobfree.com

+ RAN A CUPOLA SYSTEM MELTING SCRAP IRON AND FRAGMENTED STEEL AT 70 TONS AN HOUR.

+ CONTROLLED CHEMISTRY OF IRON OUT OF THE SPOUT OF THE CUPOLA AND WITH ADDITIONS OF ALLOYS.

+ DIRECTED TRAFFIC OF 3 TO 4 HOT METAL DELIVERY CRANES WHICH TRANSFER IRON FROM HOLDING FURNACES TO THE

MOLDING LINE FURNACES.

+ HAD 15 PRODUCTION EMPLOYEES REPORT TO ME. CONTROLLED AND TRACKED DAILY OVERTIME AND JOB ASSIGNMENTS.

CONSTRUCTION ASSOCIATE

J & P EXCAVATION

JUNE 1993 – JULY 2000 (7 YEARS 2 MONTHS) CLEVELAND/AKRON, OHIO AREA

+ OPERATED BACKHOE, BULLDOZER, TRACK HOE, AND BOBCAT PAY LOADER.

+ BRICK LAYER.

+ POURED AND FINISHED CONCRETE.

+ BASEMENT WATER PROOFING

+ INSTALLATION OF DRAIN AND SEWAGE PIPING.

+ GENERAL LABOR.



Contact this candidate