N ICOLAS ROBISON
J o u r n e y m a n P i p e w e l d e r / f i t t e r .
A D D R E S S : 3 8 6 2 C O . R D . 12 7 F O R T PAY N E A L . 3 5 9 6 7
P H # 2 5 6 9 9 6 418 4 E M A I L : T R U C K I N 8 0 S T Y L E @ YA H O O . C O M
S.S.# 417 29 3115 D.O.B. 11 02 1982
O BJECTIVE
Based on my experience as a pipe fitter/welder and mechanical background
including, but not limited to the installing of new hydraulic and hi pressure steam
lines. Being involved in multiple shutdowns and outages at everything from
nuclear power houses to the smallest paper mill. I would like to obtain a
permanent position with a growing company with opportunity to advance.
SUMMARY OF QUALIFICATIONS
I graduated from Fort Payne High School in 2001 with a general
diploma and an additional technical credit in welding and
agriculture.
Completed my journeyman Pipefitter/steamfitter training in 2008.
Which included welding certifications in tig, stick, and mig.
OSHA 10 hr safety course, that included training on fall protection,
initial opening of systems, ladder safety and the importance of
P.P.E. and its proper use.
8 hr. rigging and crane operation certification thru OSHA and on
the job.
Electrical safety LOTO/live dead live OSHA 40 hr training, this
included circuits and breaker testing on equipment.
40 hr. Blueprint detail and mechanical systems certification. This
included hi pressure pump systems including steam, hydraulic
and water.
I have been involved with many shutdowns and upgrades on
plants. Which has given me invaluable experience.
EMPLOYMENT
Pipefitter/Welder
6-13-13 present Flour Maintance Service
Boiler shutdown at steam generating power plant (coal burner)
4”-- 36” schedule 40 thru xxx heavy wall welds tig root and hot
pass up to ” thickness then fill out with 7018 X-ray
Vessel change out and intake rebuild for old cooling systems
Natural gas change over on unit 1 this included removing all old
coal feed pipe and replacing with natural gas lines to feed boiler
operations
Pipefitter/Welder/Electrician
*-**-**-*-**-** Day and Zimmerman contractors U.S.A.
Steam generator change out for TVA at there Sequoia nuclear
power plant
Glycol chiller modifications for TVA at Sequioa Nuclear
Mechanical outage at Browns Ferry Nuclear
Fire sprinkler upgrade at Sequoia nuclear
Mechanical outage at Browns Ferry Nuclear Power
Pipefitter/Welder
8-1-12 6-1-11 Mc Abee construction
Main feed water pump change out for the Bowater paper mill.
Cleveland TN.
Burner change outs at U.S. Steel Birmingham al.
Hydraulic/Electrical system upgrades at the mead west vaco
paper mill in Phoenix city al.
Pipefitter/Welder
6-1-11 4-12-2008 Flour Maintenance
Jet bubble reactor build at Wilsonville coal burning power plant for
Alabama power in 2008-2010
Boiler upgrades and rebuilds at almost every Alabama power plant
in alabama 2010-2011
Construction of the Mox nuclear bomb facility in savannah ga.
2011
EDUCATION
Fort Payne high school graduated 2001
Completed journeyman training in 2008
Various other training modules throughout my carrier as stated in qualifications.
REFERENCES
Jamie Goodwin fort Payne al. ph# 256-***-**** Goodyear
Wade Colvin Rainbow City AL. ph# 256-***-**** pipe welder/fitter
Michael Hutson Fyffe AL. ph# 256-***-**** Heil