MASOOD AHMED
MECHANICAL ENGINEER
B-** MADRAS CO-OPERATIVE HOUSING SOCIETY SECTOR 17/A, SCHEME-33 GULZAR-E-
HIJRI, KARACHI, PAKISTAN.
OBJECTIVE:
To amplify my engineering and managerial skills, exploring new
avenues of knowledge, which would eventually lead me to a post
of high responsibility in a well-reputed organization.
PROFILE:
Key Qualifications:
Mechanical Engineer with more than 31 years of professional
experience in the field of power plant construction, supervision,
project management, erection, testing, commissioning, plant
operation, performance, co-ordinating and managing the staff of
different departments for the rectification of technical
problems. Preparation of technical reports. Particular know how
in all types of boilers (Heavy oil and gas fired), different
types of combustion systems and applicable types of burners. Deep
Experience in water steam cycle and water treatment and flue gas
analysis.
Professional Education:
. B.E. Mechanical Engineering
N.E.D University of Engg. & Technology, Karachi. First
Class 1981
. B.Sc. University of Karachi First Class
1974
PROFESSIONAL
AFFILIATION:
. Professional Engineer (P.E), Affiliated Pakistan
Engineering Council; Mech.3575
Employment Record:
March 2006 Karachi Electric Supply Company Limited (Now is
to 11 May K-Electric),
2014 Deputy General Manager (Operations)
Aug 1994 - Karachi Electric Supply Company Limited (Now is
March 2006 K-Electric),
Operation Engineer
May 1984 - Karachi Electric Supply Company Limited (Now is
Aug 1994 K-Electric),
Assistant Operation Engineer
May 1983 - Karachi Electric Supply Company Limited (Now is
May 1984 K-Electric),
Apprentice Engineer (One year on job training in the
different department(Project, Maintenance and
Operation) of Bin Qasim Thermal Power Station, KESC
Limited (Now is K-Electric)
Relevant Working Experience
March 2006 - Deputy General Manager
11 May 2014
Leading an Operations Shift Team all 6 units of
210MW each (Total 1260 MW) of Bin Qasim Thermal
Power Station, K.E.S.C Ltd (Now is K-Electric
Limited.)
Responsibilities:
Reporting to General Manager Operations responsible
for:
Ensure safe and efficient operation of the Plant and
include responsibility for making accurate and
timely decisions on matters affecting plant
processes and performance.
Operating data analysis & interpretation, Plant
Management System Implementation, Fault Diagnosis of
Plant equipment's of Bin Qasim thermal power plant
210*6=1260 MW
Ensuring that operating procedures are adopted that
optimizes plant lifetime and performance, minimize
downtime and that accommodate planned maintenance
activities.
Playing lead role in Plant O&M during vacations of
Senior
Operation Plant personnel.
Analyzing, interpreting & presenting operating data
of 1260 MW Plant to the top Management for
O&M decision making.
Proposing short term operational measures to
improvement in heat rate / fuel savings.
Collecting plant reports, analyzing abnormalities
determining root cause / maintenance rectification.
Developing operating procedures for guidance of
operation staff
Submitting incident/trip reports and to provide
recommendations.
To records of equipment failures and provide needed
information and data to the Plant Manager
Responding to all station emergencies, like fire,
Loss of Generation/Water production plants, Black
out and any other incidents as per the set
Guidelines.
Ensure compliance of all relevant Heath & Safety
Standards.
Aug 1994 May Operation Engineer
2006 Shift operation Engineer of Two units 2*210=420 MW of
BQPS-1in Fossil power utility and familiarity with
Electrical Network & Equipment at Bin Qasim Thermal
Power Station of Karachi Electric Supply Company Ltd
(Now is K-Electric Limited).
Supervise start up, synchronizing, loading rates,
shutdown of the unit, and handing over for
maintenance requirements.
In case of tripping and other major fault investigate
the cause and to coordinate with maintenance sections
for rectifications of faults
In case of partial or total breakdown of supply, to
restore the station supply in minimum possible time.
Ensure the plant integrity, safety, and commercial
availability at optimum level.
May 1984 Aug Assistant Operation Engineer
1994
Assistant Operation Engineer of 2 units of 210 MW.
Thermal Power Plant at Bin Qasim Thermal Power
station, Karachi Electric Supply Company Ltd (Now is
K-Electric Limited).
. Foreign Technical Training JAPAN (Oct 1990 to Feb
1991)
(4 Months Advance Technical Training in Japan for
Turbine
(Hitachi Works), Boiler (Kure Works) and Pumps
(Torishima
Pumps)
COMMISSIONING EXPOSURE & PROJECT RELATED EXPERIENCE
Worked with consultant M/S Fichther for Hitachi Ltd.
Babcock Werke AG during commissioning and trial run
of all 6 units of 210MW of client Karachi Electric
Supply Company Ltd (Now is K-Electric Limited).
To supervise the erection, testing & commissioning
activities of the contractor. The details of the
work which I have performed are briefly described as
under.
Design, review and approval of mechanical system
drawings and documents submitted by
contractor/manufacture as per project
specifications.
Project Management, Site supervision and
coordination.
Ensure successful completion of the project well in
time.
Monitoring of project, Execution of schedules.
Punch list preparation
Checking of details and drawings for various
equipment and systems submitted by Contractor
Review of commissioning check list submitted by the
manufacture/Contractor
Preparation of erection check list to ensure the
safe and as per specification installation of the
plant equipment with the provision for maintenance
and removal of equipment for overhauling/ Parts
Replacement
Perform inspection of incoming material as per
project requirement
Inspection of in structural fabrication work
according to codes and standards. Possesses Contract
management, client negotiations, and vendor
management skills.
Plant equipment Specification Preparation and
Technical Evaluation.
Power Generation project studies, identifying
rehabilitation requirements of the 1260 MW Station
components, to offset ageing, obsolescence of
equipment in the plant or technological advancements
in the industry. Make & Implement proposals.
1989-1996
Worked as Mechanical Engineer (Commissioning):
As a part of project team took active part in
fraction installation of commissioning of Unit # 3,
4, 5 & 6 at Bin Qasim plant. KESC having 210 MW.
Capacity each 680 t/h MCR, Boiler pressure 140 bar.
Unit 3 & 4, Steam turbine generator and control make
of Hitachi Ansaldo Italy and steam generator of M/S.
Dutch Babcock. Unit # 5,6 of M/S. Marubeni
Corporation.
Involve with contactor and consultant in
installation and commissioning activities HP-LP,
boiler feed pumps lube oil and hydraulic line
flushing and commissioning Boiler, turbine generator
and feed water system pre-commissioning work eg.
Hydro test, boiler chemical cleaning, steam purge,
turbine lube oil.
Inspection and commissioning of rotating equipment's
including horizontal and vertical centrifugal pumps
and reciprocating compressors. Supervising
activities as
Under.
Boiler Erection Checks
Flashing of Piping, Steam blowing
Hydraulic testing of boiler
Cold and Hot test of Forced draft fans and GR Fans.
Erection test of Regenerative, Soot blowing system
Performance test
Condensate pump
Erection checks, Alignment, Flashing of piping
Cold and Hot test
Boiler Feed Pump
Erection and Alignment
Cold/ Hot Function test
Civil Work of cooling water basin
Filtration system, course and fine screen and
traveling band screen, installation and
commissioning.
Installation and commissioning of main cooling water
pumps and auxiliary cooling water pumps and
performance test.
Main condenser foundation work check.
Performance tests and load rejecting tests at
different loads.
Supervisory and coordination functions during major
overhauling of 210MW 19 Stages, Tandem compound
Hitachi Japan Turbine. During this overhaul, blades
of 18th and 19th stages were replaced.
Supervisory and coordination functions with Black &
vetch International, Marubeni and Halliburton during
Chemical cleaning of 680-ton/hr steam boiler ( of
210 MW turbine) the job included the internal
chemical cleaning of steam drum, water walls, down
comers and economizer.
Participated in the installation of Debris Filter at
the condenser inlet to prevent the condenser tubes
from choking associated with Marubeni Power
Development.
. Bin Qasim thermal Power Station
Successfully completed
the training on POS30 (Process Operating
Station) for the operation of 210 MW power
generating station
Associated with the ASEA Brown Boveri (ABB)
Successfully
Completed the job training and demonstration
(Sep 15, 2003 to Sep 20, 2003)
Knowledge of System application Product (SAP-ERP-ECC
5.0 Module of plant) for data processing for the
computerized Notifications (Work Permit) (SIEMENS
PAKISTAN)
(Mar 2007 to April 2007)
The spirit of annual performance appraisal Pakistan
society for training and development.
(Dec 11, 2013 to Dec 12, 2013)
. Additional Qualification
Certificate of Appreciation from CEO:
In recognition of Outstanding contribution towards the
successful, timely and within budget completion of BQPS-I
Annual Maintenance Plan 2010-11
PERSONAL DATA:
Father Name : Manzoor Ahmed
Date of Birth : May 12, 1954
C-NIC No : 42201-9878497-5
Religion : Islam
Nationality : Pakistani
Martial Status : Married
Landline No (Res) : +922*********
Cell No : +92-333-*******
Passport No : YW1154971
Email Address : ***********.****@*****.***