TASNIM IBN FAIZ
*** ******** ***, ** ***** • 669-***-**** • ******.****@*******.***
I NDUSTRIAL ENGINEER
• Creative, collaborative and experienced Industrial Engineer with the focus on process design and
improvement through development and application of lean manufacturing strategy; ensuring optimization of
man, machine and materials to increase efficiency, quality and safety of processes. Expertise includes:
Process Flow Mapping/ VSM Lean Manufacturing Balanced Scorecard Matrix
Continuous Improvement SOP Development DMAIC, Kaizen, 5S
Line Balancing/ Layout Project Management Throughput Analysis (OEE)
Motion Time Measurement Cost Modeling Computer Aided Design
Cycle/Takt Time Analysis PFMEA, RCA OSHA Guidelines
TECHNICAL SKILLS
Analysis Tools: SAS, MINITAB, MATLAB Design Tools: AutoCAD, SolidWorks
Planning Tools: SAP APO-DP Module Database and Reporting: Microsoft Excel, Access
P ROFESSIONAL EXPERIENCE
Louisiana State University, Baton Rouge, Louisiana
Industrial Engineering Research Assistant, August 2012 -May 2014
Project: Procurement, Manufacture and Supply of Components and Materials for Offshore Wind Energy Facilities.
Funded by LA EPSCoR (A joint initiative by Board of Regents and National Science Foundation).
• Designed and planned workflow to maximize utilization of resources of offshore turbine installation facilities.
• Performed time studies; introduced process standardization to minimize installation and maintenance costs.
• Formulated analytical cost models for turbine installation and maintenance as a function of process variables.
• Developed the methods for reducing installation and maintenance costs by 10 and 8 percent respectively.
University of Louisiana at Lafayette, Lafayette, Louisiana
Engineering Design Teaching Assistant, January 2012 -May 2012
• Developed course materials and provided training of CAD software ‘SolidWorks 2012’ to a group of 70 students.
Coats Bangladesh Ltd., Dhaka, Bangladesh
Demand Planner, April 2011 -August 2011
• Developed 12 months rolling forecasts for existing products and gathered market intelligence for new products.
• Maintained optimum inventory for 4000 SKUs of finished product through accurate forecasts and safety stock.
• Worked as a key liaison in developing aggregate planning, capacity planning and budget planning.
Unilever Bangladesh, Chittagong, Bangladesh
Intern, Production Department, September 2009 -November 2009
• Removed bottlenecks and identified number of personnel (application of MTM, Process Flow Map).
• Designed a new layout for soap production line to reduce material handling cost by 5 percent.
• Designed an ergonomic sitting arrangement for production line workers.
P ROJECTS
• Six Sigma project on sugar processing operation: process stability and root cause analysis using control charts.
• New product development: detailed design and selecting best manufacturing methods (CNC, Lathe, Milling).
• Multivariate statistical analysis for identifying influencing factors affecting water quality: application of SAS.
EDUCATION
M.S. in Industrial Engineering, May 2014
Louisiana State University, Baton Rouge, Louisiana
B.S. in Industrial and Production Engineering, February 2011
Bangladesh University of Engineering and Technology, Dhaka, Bangladesh