(
CAREER OBJECTIVE
To secure a position with a progressive, innovative company where my skills
and experience can be utilized to
achieve the highest level of standards by continuous improvements in
quality and value of products and
service.
(
STATEMENT OF QUALIFICATION
Team player, action oriented individual, capable of independent decision
making and sound opinion.
Organize, systematic and has a sense of urgency. Able to work with a wide
variety of personalities, flexible
and eager to learn.
(
PROFESSIONAL EXPERIENCE
November 04'13 - Oct. 31'14 : Materials Manufacturing Engineer
Comtech (Motor Coach Industries)
JOB RESPONSIBILITIES
. Analyze current state of material movement within
the plant and proposed actions to improve
efficiency, cost and service to internal
customers.
. Apply Continuous Improvement methods such as lean
manufacturing to enhance quality, repeatability
and cost -effectiveness
. Implement changes to improve material flow within
the plant.
. Conducts time studies to established current
standards and come up with material resource
model.
. Assist with any design layout of material flow and
proposed actions to achieve maximum efficiency
April 02'12 - Aug 30 '13 : Materials Planner/Dry Storage Supervisor
Freshwater Fish Marketing Corporation
1199 Plessis Road, Winnipeg
JOB RESPONSIBILITIES
. Ownership and coordination of MRP (Material Requirements Planning)
. Requisition and maintain inventories of materials and supplies
necessary to meet production demands.
. Assure proper inventory count (on-hand versus available)
. Issue all raw materials into work orders.
. Get work orders to be kitted issued and delivered along with shop
floor packet to the production.
. Move materials within locations and branch/plants.
. Record production data, including volume produced and consumption of
raw materials.
. Coordinate the process for cycle counts and physical inventory counts
. Manage and supervise shipping/receiving department and Laundry staff
to support production requirement.
Feb 06'08 - Nov 26'11 : Manufacture Engineer / QA & Safety
Coordinator
Duraco Stormtite
90. Hutchings St, Winnipeg MB
JOB RESPONSIBILITIES MANUFACTURING ENG'G
. Conducts time and motion study and establish manufacturing standards.
. Evaluates manufacturing processes by designing and conducting research
programs; applying knowledge of product design, fabrication, assembly,
tooling, and materials; conferring with equipment vendors; soliciting
observations from operators.
. Improves manufacturing efficiency by analyzing and planning work flow,
space requirements, and equipment layout.
. Assures product and process quality by designing testing methods;
testing finished- product and process capabilities; establishing
standards; confirming manufacturing processes.
. Provides manufacturing decision-making information by calculating
production, labor, and material costs; reviewing production schedules;
estimating future requirements.
. Implemented 5's and improving process flow and implemented projects
that drives cost reduction, thus improving quality and productivity.
QUALITY ASSURANCE
. Conducts Internal Quality Audit in preparation for ISO and customer
and suppliers audits.
. Creates quality procedures and coordinate implementation to different
department.
. Ensures quality systems and procedures are implemented at production
line
. Coordinate quality issues to Suppliers and internal department and
follow through corrective and preventive actions.
. Implemented quality program such as, inspection, audits, New product
launches and process validation.
. Develop quality control standards evaluate and improve quality
systems and methods
. Identify and create all documentation required to fulfill overall
quality goals.
. Coordinate with engineering/manufacturing to design inspection and
tooling to aide in the implementation of quality standards
SAFETY COORDINATOR
. Plan, organize and direct daily operations
. Establish and implement safety policies and procedures.
. Conduct and facilitate meeting with Safety Committee
members.
. Manage training and development strategies for employees.
. Manage all safety investigations and submit recommendations
for approval; ensure all approved recommendations are
adopted and implemented throughout the organization
. Oversee the analysis of employee data and information.
. Oversee the preparation of reports, Advise senior
management, Respond to employee questions and complaints
June 16'06 - Feb 06'08 : Production Control Planner
Storm-tite Inc.
(A Division of AROW GLOBAL INC.)
JOB RESPONSIBILITIES
. Provides a second analysis of material and
resource requirement base on
production schedule.
. Maintain schedules that coordinate the use of
company resources to satisfy customer
requirements.
. Prepares recovery plan base on schedule changes.
. Update systems (MRP) to reflect changes on
schedule, scrap rate and routings.
. Execute plan based on production schedule and
analyze production capacity
. to meet production demand.
. Approves expedite base on customer request date.
. Monitors work order tracking per sequence and
ensure work order closure.
. Analyze resource and capacity requirement and
constraints and suggest alternative solution.
. Takes a full responsibility of work in process
inventory control.
. Generate necessary paper work for production
loading.
Feb. 2005 - June 18 '06 : Manufacturing Supervisor
Internautic Marine Group
(A Division of AROW GLOBAL INC.)
Egesz St. Winnipeg, MB
JOB RESPONSIBILITIES:
. Supervising, directing and staffing of direct
laborers.
. Responsible manpower planning and deployment in
reference to production
schedule.
. Ensure top level metrics are met such as high productivity,
high quality, on time delivery and safety.
. Create training plan to increase operator's
knowledge and flexibility.
. Motivate people through effective leadership.
. Evaluate individual performance in line with
awards and recognition.
. Create a team-based performance at shop floor
level.
. Handles employee grievances and counseling.
. Conducts Safety and quality audits at production
line.
Oct. 2002 - Feb. 2005 : Manufacturing Integrator
Intel Technology Phils. Inc.
Gateway Business Park Gen Trias.
RESPONSIBILITIES:
Plan and coordinate output strategy with all shift
supervisors through wip management strategy
Establish and recommend strategies to ensure
continuous improvement on wip management to hit
desired TPT level
. Generate loading plan or kitting schedule base on
Die requirement to ensure right mix of products
are issued in the line at the right time
. Leads Shift Business Recovery Plans. Works in
tandem with the Shift Sups.
. Integrate and lead all stakeholders to meet
performance delivery
. Generate over-all plans and strategies to meet
expected goals.
. Provides detailed analysis with respect to product
criticalities when needed to maintain
manufacturing visibility.
. Formulate and implement maximum solutions on key
issues encountered during execution.
. Maintained full flexibility on all product
segments when needs arises.
. Formulate and re-define system improvement in
handling Eng'g build which resulted to responsive
and integrated solutions.
June 1998 - June 2002 : Production Supervisor
Pulse Philippines Incorporated
JOB RESPONSIBILITIES:
. Supervising, directing and staffing of direct
laborers.
. Responsible manpower planning and deployment in
reference to production
schedule.
. Ensure top level metrics are met such as high productivity,
zero past due, met On-time delivery and short cycle time.
. Create training plan and execute training request
to increase operator's
flexibility
. Coordinate with co-supervisors to implement plans
in improving line
efficiency.
. Motivate people through effective leadership.
. Evaluate individual performance in line with
awards and recognition.
. Create a team-based performance at shop floor
level.
. Handles employee grievances and counseling.
June 1997 - June 1998 : Industrial Engineer
Pulse Philippines Incorporated
JOB RESPONSIBILITIES:
. Conducts time and motion study and develop
generate standard time and proposed methods and
process improvement
. Conducts line balancing and work measurement
studies.
. Design and implement process improvement that increases
product yield.
. Conceptualize and implement work station layout
. Eliminate imbalances in the line though waste
elimination and cycle time
reduction
. Develops and implements cost reduction and cost
effectiveness projects and programs.
. Design and simplify production forms in relation
with reducing cost of
production supplies.
. Develop proposal and implement methods
improvement on process simplification,
combination and elimination
(
EDUCATION Masters in Business Administration (MBA)
Philippine Christian University
March 2000
Bachelor of Science in Industrial Engineering
Adamson University
March 1997
(
[pic]
HERLENE T. SAQUI
( Address: 2-1205 Troy Avenue Winnipeg, MB R2X 1E4
Home Phone: 204-***-****
(Mobile No: 204-***-****
( ************@*****.***