CURRICULUM VITAE
ADITYA A THAKUR
******.****@**********.***
+91-986******* (Mob)
• CAREER OBJECTIVE:
To grow in an environment where my Knowledge and Skills can be used effectively to gain experience.
• EDUCATIONAL QUALIFICATIONS:
• Bachelor of Engineering (B.E) (Mechanical Engineering)
• Overall Aggregate : 58.52%
Year of Institution Cours Board/University Percentag Aggregat
Passing e e e
May 2014 Saraswati College Of B. Semester 8 Mumbai 71.42%
Engineering, E in University
65.4%
Kharghar Mec
Dec 2013 Semester 7 Mumbai 60.13%
hani
University
cal
Engi
June 2013 Semester 6 Mumbai 54%
neer University
54.82%
ing
Dec 2012 Semester 5 Mumbai 55.64%
University
Dec 2012 Semester 4 Mumbai 54.94%
University
55.35%
June 2013 Semester 3 Mumbai 55.76%
University
May 2011 B,L,Patil,Polytechnic, Diplo M.S.B.T.E 79.43%
Khopoli. ma
in
Mec
hani
cal
Engi
neer
ing
Feb 2008 J.S.M,college,Alibag H.S.C Maharashtra State Board 49.83%
March 2006 J.A.V,High School, S.S.C Maharashtra State Board 58.26%
Alibag
TECHNICAL PROFICIENCY:
Computer skills : MS-CIT With 54%
• PERSONAL SKILLS AND STRENGHTS
• Good learning skill
• Good listener
• Commited to dead line and schedules
• Friendly nature and punctuality towards work
• CO-CURRICULAR ACTIVITIES
DEGREE PROJECT
Institute : SCOE
Organization : NRB Bearings Ltd. Thane
: 23rd August 2013 To 14th April 2014
Duration
TITLE : Reduce time require to manufacture bearing.
Description : The major objective of the project was to reduce the time required for
assembling a bearing.This can be done by change in design of
automation sequence .There were total 8 processes in final assembly
process before changing the sequence & the time required for bearing
assembly is 20 sec.By changing the sequence of operation (laser station
position to last),it eliminates the manual checking process.So it saves
the labour cost as well as save a manual checking timing.Now the time
required for bearing assembly is 17 sec.It improve the quality of product
also increase the production rate by laser checking position at the last.
DIPLOMA PROJECT
Institute : B.L.PATIL,POLYTECHNIC,KHOPOLI.
Title : Strirling Engine.
• Description : The major objective of this project is to use waste heat from various heat processing
industries.Astirling engine is a heat operated by cyclic compression and expansion of air,the working
fluid,at different temperature level such that there is net cinversion of heat energy to mechanical work.
• EXTRACURRICULAR ACTIVITIES:
• Participated in national level project compitation,at scoe,kharghar.
• Participated in cultural activities in school level and college level.
•
INTEREST IN DEPARTMENTS
•
• Maintenance, Production, Quality Control,purchase.
• PERSONAL PROFILE
Name : Aditya Thakur
Date of Birth : 29-06-1991
Father’s Name : Ashok Thakur
Gender : Male
Nationality : Indian
Marital Status : Single
Language known : English, Hindi and Marathi.
Hobbies : Travelling,Learning new skills,Playing Cricket,Football etc.
Permanent Address : At-mani,Post-Thal,Tal-Alibag,Dist-Raigad,Maharashtra.
Family background : Father – Retired. / Mother – House Wife
• DECLARATION:
I hereby declare that the above-mentioned information is correct up to my knowledge and I bear
the responsibility for the correctness of the above-mentioned particulars.
PLACE: Alibag. (Mr. Aditya Thakur)