BACKGROUND & EXPERIENCE
Extensive broad base international project management experience in the
heavy engineering industry in four continents. Experience includes
successful completion of EPC, EPCM & OEM type projects as a contractor
as well as a client, in public and private sector organisations. Business
and engineering knowledge blended with strong leadership, communications
skills and creative problem solving techniques through teamwork, ensuring
quality performance.
Key strengths include successful management of:
. Development of pre-qualification documents, setting tender evaluation
strategy and consolidation of tender submittals as a client;
. Review of Technical and Commercial tender documents, evaluation and
recommendation of selected Contractor based on scoring criteria as a
client;
. Business process improvement to optimise efficiency;
. Reliability Centred Maintenance studies and development of O&M plans;
. Development and completion of Asset Management Plans ;
. Business Case development;
. Capital and Operation cost estimating for development of Capital
works program;
. Delivery of Capital Works program in accordance with the Asset
Management Plan;
. Review of client RFI/RFQ & setting tendering strategy as a contractor;
. Developing Proposal Approval Request documentation for seeking
management approval;
. Proposals and tender development as a contractor;
. Tender negotiations as a contractor;
. Delivery of Conceptual study, Front End Engineering Deliverables and
project Estimates as a contractor;
. HSE management;
. HAZID, HAZOP and risk assessment;
. Project controls and support services;
. Procurement and Contract management;
. Modularisation & Transportation logistics;
. Quality assurance and quality control;
. Project HR & training requirement;
. Construction & Completions management;
. Management of field engineering services;
. Site materials & equipment storage logistic management; and
. Customer liaison.
QUALIFICATION AND PROFESSIONAL AFFILIATIONS
. MEngSc Project Management, School of Civil & Environment Engineering,
University of UNSW, Australia
. Diploma of Project Management from Australian College of Project
Management, Australia ;
. M.S, University of Washington, Seattle, Washington, USA ;
. Post Graduate Certificate in Business Administration, University
of Washington, Seattle, Washington, USA ;
. B.E (Mechanical), University of Nagpur, India ;
. Member of the Australian Institute of Project Management (MAIPM)
. Member of the Institute of Engineers, Australia ( MIEAust)
SIGNIFICANT ACHIEVEMENTS
. Program manage the development and completion of key asset
management plans for equipment and power stations including Safety &
Operating plans, Integrity Management plans, maintenance schedules and
procedures at Hydro Tasmania, Australia;
. Project manage the tender review of a Chinese EPC contractor (CMEC)
with a team of Worley Parsons engineers in Beijing as Owners Engineer
of Cenpower, for Kpone 340 MW CCGT power station project in Ghana
comprising of two PG9171E GTG and HRSGs in 2:2:1 configuration ;
. Project Manage the delivery of FEED & Detailed design of Substation
and Transmission lines ( 330kV, 132kV and 66kV) projects at Worley
Parsons for various Mine and Infrastructure projects in the Pilbara
and mid-west WA region in Australia for reputable clients viz.
Gindalbee, Hancock, Horizon Power, BHPBIO, OPR, Western Power,
Leighton, Verve etc.;
. Project Manage the FEED concept and Detailed design of Open &
Combined cycle gas turbine power generation (GE frames 6, 7, 9 ;
Siemens V64.3,V84.3,V94.3A,SGT-800 ) and renewal energy EPCM projects
at Worley Parsons, Transfield and Tata Electric Company ;
. Project manage the expansion of Alcoa Wagerup refinery's existing
residue storage area and associated water storage referred to as
Residue Storage Area 9 (RSA9) and Run off collection pond (ROCP 3)
project;
. Manage the development of standard engineering templates of equipment
specifications, Scope of work, datasheets, tender packages, product
engineering and estimation database at Worley Parsons ( Australia),
Babcock & Wilcox ( USA) and Transfield Technologies P/L ( Australia)
;
. Drafting of complex work flow process guidelines, standards and
procedures for proposal and project delivery groups at Worley
Parsons, Saudi Electric Company, Hydro Tasmania, Transfield
Technologies P/L and Weir Engineering P/L, Australia;
. Project Manager for upgrade and modernisation of an existing key 80MW
hydro power station at Hydro Tasmania, Australia ( Brownfield project
> $10M);
. Project Manager for the development and implementation of detailed
Factory Acceptance Test plans, procedures, Inspection & test Plans
(ITP) for Protection & Control panels / rooms and mechanical equipment
at Hydro Tasmania and WorleyParsons;
. Project Manager for the development of detailed plant commissioning
plans, standards & procedures and commissioning reports of a number
of power projects at Hydro Tasmania, Australia;
. Project Manager for design validation and regulatory approval of 42
overhead cranes at 27 hydro power stations of Hydro Tasmania,
Australia;
. Proposal Manager for a number of EPC & OEM power projects ( $0.5 to
500 M) with extensive shop fabricated modular sections of structural
steel and ducts in USA at Babcock & Wilcox company;
. Project Engineer for a major EPC power project (2400MW; $ 1.2B) in
Saudi Arabia with the state Utility company - Saudi Electric Company
( SEC);
. Proposal Engineer for a number of Open and Combined cycle (GE frames
6, 7, 9 ; Siemens V64.3,V84.3,V94.3A, LM 2500 & 6000) EPC & OEM
proposals with Transfield Technologies P/L, Sydney, Australia;
. Project Engineer for the ANZAC ship project ($25M) with Weir
Engineering P/L, contracted to supply more than 500 pump sets for the
12 Frigates ships.
SPECIFIC TECHNICAL EXPERTISE
Management of multidisciplinary engineering projects comprising of
following work scopes as Contractor :
. Earthworks, Civil and Foundation ( inclusive of roads,evaporations
ponds, sewage and waste water systems);
. Structural, Mechanical and Piping ;
. Primary Electrical engineering; and
. Secondary Electrical engineering - SCADA, COMMS and Protection,
inclusive of Systems Integration
Tender management as Client representative :
. Develop specification, SOW, BOQ, Datasheet for D&C contractor ;
. Lead pre-qualification process;
. Set tender evaluation strategy;
. Liaise, coordinate and consolidate tender submittals;
. Review technical and commercial tender documents;
. Evaluation of Tenders;
. Recommendation of preferred Contractor based on set scoring
criteria; and
. Manage EPC, EPCM and OEM contractors during the entire project
life cycle.
KEY RELEVENT EXPERIENCE
04-2014 Project & Quality Engineering Management Consultant at GD Pipelines
P/L, Brisbane QLD
Provided Project and Quality engineering management services for
the 33kV/6.6kV Delga Park substation project at Wandoan QLD, a part
of the QGC LNG program of projects. This included preparation of
Project Execution plan (PEP), work packages, project deliverables
list,' Division of Responsibility' (DOR) matrix, Inspection and Test
plans (ITP) . Was responsible for managing the Civil Design
08/2013-02 Consultant (SKM) and Electrical EPC contractor (SCEE) and Document
-2014 Control of Client's system and GPD's system.
PM Consultant at SVT Engineering Consultant P/L, Perth WA
(1) Successfully delivered the Inpex - Cathodic Protection design
of LNG Jetty project in Darwin under an EPCM delivery model;
(2) Provided PM advisory services for QGC LNG program of projects
-comprising of provision of condition monitoring services for
Compression and Pumping stations ( viz. FCS and CPP) and development
of computer management maintenance system ( CMMS) ;
(3) Project managed the investigation and provision of
engineering consultancy services to Glow Energy, Thailand for
rectification of the damaged HP Feed Water Heater at GHECO-1 coal
11/2008- fired power station .
1/2013 Senior Project Manager, WorleyParsons, Perth
Responsible for
. Planning, Coordinating and managing the design, procurement,
construction and commissioning of large multi-discipline engineering
projects ;
. Ensuring clear agreement of client objectives and that these
are met or exceeded;
. Providing strong leadership on HSE, QA/QC, scope and
communication elements of project management.
Have worked on the following key projects in the Pilbara and mid-west WA
region development:
. Successfully completed the Front End Engineering Design (FEED)
and detailed design phase of a 330/33kV substation and 33kV
distribution network EPCM project ($10M) complete with Civil
and Electrical infrastructure works within a large iron ore
mining project (Karara Iron Ore project) complete with technical
support for procurement and contracts;
. Successfully managed the power systems modelling & study of
330kV, 33kV, 6.6kV, 3.3kV and 415kV network complete with
protection grading and settings for Karara mine site ($2M) ;
. Successfully managed the delivery of the Rail accreditation work
scope of Karara Iron Ore project (0.75M);
. Project manage the detailed design phase of a BHPBIO 203 MW
power station project in Port Hedland ($ 5M) comprising of four
Siemens Gas turbines SGT-800 to be initially installed in open
cycle mode and converted to combined cycle mode in the second
phase ;
. Successfully managed the detailed engineering phase of BHPBIO
66kV transmission line project ($4M) from South west creek to
Finucane Island and upgrade of five substations for Horizon
Power;
. Successfully completed the Definition Phase Study ($2M) of two
Power generation options for BHPBIO, a 32 MW open cycle gas
turbine plant and a 132 MW combined cycle plant proposed for
RGP 6 with Siemens Gas turbines SGT-800 ;
. Successfully completed the preliminary engineering and design
phase of the 132MW combined cycle plant option ($ 1.5 M) for
BHPBIO in a short duration of four months, complete with
procurement support of long lead items - HRSGs, STG and GTG;
. Successfully managed the Power systems model and study
project($ 2M) for the complete BHPBIO network that captures RGP
4, 5, 6 and 7 network using DigSilent software ;
. Seconded to Horizon Power as Design Manager for Tender
Development and Evaluation of the 100MW OCGT South Hedland
Power Station project comprising of LM 6000 Gas turbines truck
mounted for temporary generation;
. Successfully managed the engagement of service providers Water
Corporation, EPIC and Horizon Power for relocation of their
lines intersecting Hancock's proposed rail infrastructure and
marshalling yards of Roy hill Iron Ore project ;
. Project manage a BHPBIO Brownfield substation project for
replacement of six VTs ($0.5M);
. Project Manage the 132kV FEED design of transmission line from
Chapman station to Port infrastructure for OPR ($0.5M); and
. Successfully managed wind farm development study projects for
a number of clients in Australia.
9/2007-10/ Principal Planning Engineer, Hydro Tasmania, Hobart, Australia
2008
. Responsible for provision of high level proposal management expertise
and leadership in delivering the major capital works programme;
. Responsible and accountable for management and delivery of a 5 year
planning programme of a value of $75M per year, with strong focus on
stakeholder management, risk management, investment strategy and
improvement of process and culture;
. A Champion in :
o Assembling and leading large teams of internal personnel from across
the organisation, external consultants and contractors;
o Working with the planning and project teams and building high levels
of engagement, cohesion, collaboration and performance;
o Meeting Health and safety requirements of team members and
contractors;
o Managing proposal development inclusive of design and resource
engagements, to deliver scope options aligned to investment strategy.
Deliver important value to the organisation supported with commercial
analysis; and
o Maintenance of high standards of Project Management and leadership in
the engagement of contractors to deliver proposal outcomes to agreed
technical quality, cost and schedule whilst actively managing
uncertainty (risk).
Successfully delivered the capital works planning portfolio with
Project Management Plan, Safety & Envi ronmental plan, project cost
estimate breakdown, conceptual design reports and Hazards and Operation
study report for the financial year 2008/2009 in March 2008.
Successfully completed the concept phase of a 'state wide Integrated
Work Plan project' to efficiently manage the Hydro Tasmania assets at
all the 27 power stations, with a life cycle approach. This involved the
development of Equipment asset management plans and Station asset
management plants with colour coding and tagging of health and risk
scores to prioritize & align with the Capital Works program.
1/2004-9/2 Project Manager, Hydro Tasmania, Hobart, Australia
007
. Responsible for projects within the Hydro Works program that included
major maintenance, replacement, refurbishment and 'Greenfield'
projects ( Capital and Operational) ;
. Responsible for forming, managing and leading project teams and
providing leadership and guidance to project team members;
. Responsible for management of concept, development, implementation
and finalisation phases of projects with efficient management of
scope, time, cost, quality, risk, contract, communication and
integration;
. Successfully completed Lemonthyme station upgrade project ($10M)
that included civil, mechanical & electrical discipline work
scopes. Project completed within 80% of approved budget and power
station returned to service 10 days ahead of schedule. This project
was completed in a record time of 8 months whilst the organization
was going through a major restructure with constraints on limited
resources. Successfully managed multiple contractors who worked at
the power station during the 3 months plant outage with strict
adherence to environmental, safety, quality and heritage policies;
. Successfully completed a state wide crane design registration
project ($ 5M) comprising of 42 cranes requiring compliance with
current Workplace Tasmania requirements. Met all the technical and
scheduling accountabilities. The project was completed ahead of
schedule within 85% of approved budget ;
. Successfully completed the Development, Implementation and
Finalization (DIF) phases of Alternator Fire Protection PLC based
systems ($ 15M) at ten power stations and switched to auto
protection mode. Project completed with numerous scope variations
and frequent changes of project team members;
. The controls upgrade project ($ 1.5M) for Poatina station main
inlet valve #2 required to be completed as a fast track project
with Business case approval in February 2006 and commissioning in
May 2006 (i.e. 4 months time frame). Successfully met the
challenge and worked closely with cross functional Hydro
Consulting engineering and Generation engineering teams to meet
the design and commissioning deadlines. The Machine was returned
to service on time and project completed within 85% of approved
budget ;
. Successfully completed the Concept, Development, Implementation
and Finalization phases of the Paloona station turbine upgrade
project ($0.75 M) with Hydro Consulting and Generation mechanical
and electrical engineering teams;
10/2000-2/ Proposal Manager, Babcock & Wilcox, Barberton, USA
2003
Responsible for preparation of turnkey EPC proposals ($20-500M) with
company's Utility boiler and environmental equipment for domestic and
international power plant projects. Directed cross-functional departmental
tasks with business development, sales and marketing, engineering,
estimation, accounts, legal, project management, purchase and transport,
field engineering service and construction teams during bid cycle period.
. Led cross-functional team of ten managers and engineers and won a Chinese
power plant contract ($75 M) funded by World Bank;
. Successfully submitted 750MW EPC power project firm price bid for
complete boiler and environment island with Balance Of Plant scope in
record 6 weeks bidding period with minimum resources, to meet company
allocated budget expense;
. Successfully developed competitive optimum priced equipment supply
proposals that met clients' expectations;
. Successfully developed extensive modularisation plan for flues and ducts
and environmental equipment with imported plates and domestic module
fabrication program. Modules were planned for shipment by barges for
reducing construction cost by 20% from that of conventional
'stick built' construction methodology.
11/1997-10 Project Engineer, Saudi Electric Company, Saudi Arabia
/2000
Responsible for review of contractor's design engineering, material and
equipment requisition, vendor selection and construction scope of $1.2
billion 2400 MW power plant project. Monitored QA/QC compliance, release
for shipment of material and equipment, material receiving inspections, and
earned value statements.
. Successfully implemented Bechtel's "Project Information Management
System" software to control all technical and commercial documents
electronically;
. Successfully formulated and implemented system to monitor inspection
notifications, observations and reporting methodology for material and
equipment worth $800M;
. Developed effective tracking system to monitor progress & delivery of
material and equipment to review, evaluate and approve contractor's
earned value statements and invoices;
. Actively participated in construction site review meetings to monitor
progress of construction work and developed "fast track" reporting
formats for management review
8/1994-11/ Tendering Engineer, Transfield Technologies Pty. Ltd., Sydney,
1997 Australia
Responsible for sales, marketing and product engineering of Heat Recovery
Steam Generators (natural and assisted circulation HRSGs) in the Asia
Pacific Region. Developed business plans and marketing strategy. Directed
cross-functional departmental tasks with engineering, manufacturing,
project management, accounts, field engineering services and purchase
teams.
. Led cross-functional team of five engineers bidding for Heat Recovery
Steam Generators behind Siemens, GE, and Alstom Gas Turbines and
developed competitive bidding and pricing strategy;
. Actively participated in product development of modular design HRSG's for
minimizing site erection costs;
. Developed product engineering data base for all sizes of HRSG's (natural
and assisted circulation);
. Led development of detailed "Division of Work" and "Work Breakdown
Structure" for cogeneration and combined cycle projects to clearly define
responsibilities of consortium members;
. Developed estimation formats and procedures for company work flow
process manual.
5/1992-8/1 Project Engineer, Weir Engineering Pty. Ltd., Sydney, Australia
994
Managed $25M defence contract for supply of 500 pump sets of various
designs for 12 frigate ships of the Australian and New Zealand (ANZAC) ship
project.
. Developed and successfully implemented pump castings component
procurement plan to support assembly of pumps at manufacturing shop and
meet target delivery time;
. Developed inspection and test plan for 500 pump sets per Australian
defence contract requirement and successfully met all technical and
schedule requirements;
. Supported customer's critical defence standard requirements, "Integrated
Logistic System" for component coding and document control;
. Obtained timely payments from Transfield Shipbuilding after providing all
supporting technical and commercial documents with invoices. Maintained
positive cash flow throughout the project and achieved target overall
profit margin.
Referees:
1. Mr Nitin Panhale, Manager Power, WorleyParsons, Level 7 QV1 Building,
250 St. Georges Tce, Perth 6000. (W) 08 6263 8899 ; (M) 043******* ;
Email- *****.*******@*************.***
2. Dr. Paul Keswick, Chairman, SVT Engineering Consultants P/L, 112
Cambridge Street, West Leederville WA 6007. (W) 08 9489 2020 (M)
041******* ; Email -****.*******@***.***.**
3. Mr Martin O'Bryan, Protection & Controls Manager, Engineering & Asset
Services, Transend Network P/L, Moonah TAS 7009; (M) 041******* ;
Email- ******.******@********.***.**