Carlos D. Cairl
Thomasville, AL 36784
Phone : 205-***-**** Email: **************@*********.***
Objective
To attain a position that is long term; have continue training; opportunity for growth; and offer financial
rewards for hard work and dedication
E ducation
B.S. in Industrial Technology; University of West Alabama; 1997
Assoc. in Industrial Maintenance; University of West Alabama; 1993
High School Diploma; Thomasville High School; Thomasville, AL 1990
Work Experience
Georgia Pacific; Pennington, AL; Construction Safety Engineer; Oct. 2011 Present
• Manage the Contractor Safety Program and all activities associated with the program
• Perform research & develop programs to ensure standardization of processes
• Assist in administration of OSHA, ANSI, NFPA, and other relevant safety standards
• Participate in Behavior Based Safety Program and training
• Analyze injury trends and work with operating departments
• Participate in accident investigations, mitigation, root cause analysis and corrective action, assess and
mitigate employee exposure to hazards in the workplace
• Stay current with new ideas, engineering, and techniques in the safety field
• Manage Capital and Expense Projects
• Conduct Field Audits
• Responsible for Managing projects from start to finish
• Develop or ensures that project objectives are clear and are met
• Develop scopes and budgets
• Communicate project status; anticipate problems and proactively eliminate them
• Provide input on other projects
• Accountable for projects estimate, cost, design, and execution
AECOM; Montgomery, AL; Sr. Construction Inspector; Sept. 2010 –Oct. 2011
• Provided Construction Management to ALDOT
• Wrote daily reports; Maintain project files
• Made recommendation on construction related problems and pay request
• Interact with ALDOT personnel, FHWA personnel, the public, and Contractors
• Inspect Contractor work to make sure it meets what were stated in the contract documents
• Attend Project Meetings, train lower level inspectors,
• Supervised 5 to 7 inspectors
Type of Projects: Bridge, Asphalt and Concrete Paving; Earthwork
PBS&J; Atlanta, GA; Associate Construction Manager; Jan. 2007-Sept.2010
• Provided Construction Management to GDOT in District 7, Area 1 (two of its largest projects in years
(Lawrenceville and Memorial Drive Interchange project (cost range for each was between
$25,000,000 and $54,000,000) and the following projects: Flakes Mill Rd Widening ($5,000,000),
Lithonia Industrial BLVD Phase 3 ($16,600,000), I-20 Resurfacing Project ($28,596,194)
Supervised 8 to 10 inspectors
Types of Projects: Bridges; Concrete and Asphalt paving; Earthwork; Bridge Culverts; Earthwork;
Milling
Volkert & Associates; Birmingham, AL; Residential Project Representative; Feb. 2003– Dec. 2006
• Provided Construction Management for ALDOT on the following projects: Emergency Bridge
Replacement, Widening of I-65 and Valleydale Rd.
• Provided Construction Management for City of Birmingham and Jefferson County on the following
projects: New Georgia Landfill field closure; Eastern Landfill construction of a new cell; Carson
Loop (installing new water line); Birmingham Airport construction of a new apron; Assessment of
Jefferson County Road and Transportation Department; and Structure repairs to Legion Field football
stadium
Types of Projects: Bridge, Bridge Culverts, Landfills, Concrete and Asphalt Paving; Airport Apron;
Water Proofing; Assessment; Earthwork, Water Main, Structure Repairs
Burk-Kleinpeter; Montgomery, AL; Sr. Construction Inspector; June 1999-Feb. 2003
• Provided Construction Management for ALDOT on the following projects: constructed bridge over the
Alabama River in Prattville, AL; widening the highway in the same area; relocated a bridge over the
railroad and the highway in Montgomery County
Types of Projects: River Bridge, Bridge Culverts; Concrete and Asphalt paving; Earthwork
Brown & Root; Grove Hill, AL; Construction Inspector; March 1998-June 1999
• Provided Construction Management for ALDOT on a construction of a bypass project
• Inspected work of contractors to ensure it meets contract documents
• Maintain project files
• Made recommendation on pay request and construction related problems
• Write daily reports and kept detail notes
• Performed Quality Control Testing; Monitor Erosion and Traffic Controls
• Interact with Contractors, ALDOT employees, the public, and FHWA employees
Types of Projects: Bridge Culverts; Earthwork;
Alabama Army National Guard; Grove Hill, AL; PFC; June 1993-June 2001
• Served six years active and two years inactive
• Specialized in Communication
Professional References:
Theo Johnson: Project Manager, Volkert 205-***-****
Ron Thomas: Project Manager, State of Alabama 205-***-****
Mike Harper: V.P., Program Manager, Volkert 334-***-****
Kevin Martin: Project Manager, PBS&J 205-***-**** W.C, 205-***-**** Home