CURRICULUM VITAE
Name : MITTAPALLI SAIKIRAN
Email : ***.********@*****.***
LinkedIn: in.linkedin.com/in/msnsaikiran/
Contact No: +91-995*******
[pic]
CAREER OBJECTIVE:
To obtain a professional challenging position in a energy/power sector
that allows me to use my technical and management skills to help growing
organization and accomplish in its mission and vision. Seeking assignments
with a leading organization in its Commissioning, Erection, Operation and
Maintenance activities with sustainability.
PROFESSIONAL SUMMARY:
> Having 1.2 years of experience in Boiler Overhauling Works.
> Strong knowledge of Overhauling or Shut down jobs of Front Fire Water
tube Boilers and Tangential Fire Water Tube Boilers.
> Good knowledge of Quick erect Boiler Scaffolding.
> Site work inspections and testing's with the execution with object
oriented methodologies; Finalising the demonstrative knowledge with
effective man power management.
> Having the knowledge of AutoCAD.
> Pursuing M. Tech in Power Plant Engineering and Energy Management
(Final year).
> Ability to lead a team and independent.
> Engineering Project Management with site knowledge.
PROFFESSIONAL EXPERIENCE:
1. M/S Prabhat Engineering Works
Position : Site Engineer
Project Experience : Power Plant Overhauling Works or
Shutdown Jobs
Specialization : Boilers
Time Period : From August 2013 to Present
OVERHAULING PROJECTS:
1. Overhauling at NTPC Simhadri, Vizag, AP (2000MW).
Aug - Sep 2014
Stage II (2x500MW, BHEL), Unit IV 500 MW
2. Overhauling at NTPC Talcher Kaniha, Odisha (3000MW).
Jul - Aug 2014
Stage III (4x500MW, BHEL), Unit V 500 MW
3. Overhauling at NTPC Talcher Kaniha, Odisha (3000MW).
Jun - Jul 2014
Stage III (4x500MW, BHEL), Unit VI 500 MW
4. Overhauling at NTPC Ramagundam, Telangana (2600 MW).
May - Jun 2014
Stage II (3x500MW, BHEL), Unit V 500 MW
5. Overhauling at NTPC Simhadri, Vizag, AP (2000MW).
Nov - Dec 2013
Stage I (2x500MW, BHEL), Unit II 500 MW
6. Overhauling at NTPC Ramagundam, Telangana (2600 MW).
Aug - Sep 2013
Stage I (3x200MW, ANSALDO), Unit II 200 MW
TECHNICAL ACTIVITIES:
> Conducting the Boiler Tube Thickness Survey (TTS) at Starting Panel
/Z-Panel, Water Wall Tubes, Soot Blower elevations and Burner
elevations etc.
> Planning of predictive maintenance based on condition monitoring
techniques.
> Inspecting the Erosion/corrosion at various locations High
temperature zones like water wall tubes, burner side tubes, soot
blower intersections, starting panel, door cooling systems reheater,
and superheater coils etc; guiding proper Shielding for erosion
sections at specified sections.
> Remove and replacing the corrosion, erosion tubes low thickness tubes
with new tubes.
> Supervising and guiding the Non-Destructive Tastings (NDT) for the
Boiler.
(Dye Penetrate Test, Radiography)
> Monitoring and checking the Inspection of Oxide Thickness (IOT)
process at Reheater and Superheater Coils and Divisional Panel.
> PWHT process for different types of tube materials.
> Boiler Drum and Ring header maintenance.
> Finalization of execution methodology & Technical support to site
work execution.
> Burner inspection and shielding.
> Maintaining IBR standards.
> Hydraulic Test preparation for Boiler.
> Organizing and checking the Boiler ceiling arrangement actions for
final tasks.
> Planning and effecting preventive maintenance schedules of various
equipments
> Executing cost saving and energy saving techniques/measures and
modifications to achieve substantial reduction in O&M Expenditures
and work within the budget.
Boiler Scaffolding:
> Supervising the Scaffolding work and its methodology into action of
work in different Boilers.
> Observing and rechecking the scaffolding status for the safety of
work.
> Guiding in the operation of scaffolding platforms for scheduled work.
> Dismantling check outs for the safe removal.
RESPONSIBILITIES:
> Planning and effecting preventive & predictive maintenance
strategies, procedures and methods for critical/non critical
equipment in consultation with process team.
> Maintaining the Overhauling Log book as well scheduling also.
> Site work progress monitoring & review & analyzing the same.
> Pre preparation of detailed planning, settings of ramps to easily
execute the works.
> Giving the guidelines to the safety officer for work safe operation.
> Directing, leading and motivating workforce; imparting continuous on
job training for accomplishing greater operational effectiveness/
efficiency.
> Working on succession planning of the workforce, shift management
activities, appraising the member's performance & providing feedback.
> Execution of system completion according to plan.
> Maintaining Effective coordination between development team and
testing team.
> Reviewing and Periodical Updating of the daily work progress of
project plan, schedule, Target projections.
> Resource calculation and allocation (Men, Machinery, Material,
Maintenance).
> Scheduling Programs to achieve targets as per client's plan
requirement and Setting of alignments for Project execution purpose.
> Preparation of Bid documents.
2. TriGeo Technologies Pvt Ltd, Hyderabad.
Position : Trainee Engineer.
Project Experience : AutoCAD, Arc Map, ArcGIS, Excel,
Access.
Time Period : From June 2009 to May 2010
Having One year work experience as trainee engineer.
TECHNICAL SKILLS:
Operating Systems : Windows (98/2000/ME/XP/7/8), UNIX, Linux,
Mac.
Packages : MS Office (Excel, Access, Word, PowerPoint)
Applications : Adobe Photoshop, Adobe PageMaker.
Browsers : Internet Explorer, Fire Fox,
Safari, Chrome.
Design Software : AutoCAD, ArcMap, ArcGIS, PDMS.
Simulation Software : Mat Lab, PSpice.
Machine Shop : Radiography Camera, Welding Electrode Drying Oven,
Inverter MWA Welding Machine, Drill press.
Testings : IOT Testing, Non Destructive Testing (NDT)
Methods, Dye Penetrate (DP) Test, X-ray Radiography test for Boiler Tubes
Welding Joints, TIG Welding, PWHT, Sponge Ball Test, Air and Gas Tightness
test of boiler, Hydraulic Test for Boiler, Steam Blowing.
ACADEMIC CHRONICLE:
EDUCATION QUALIFICATIONS:
1. M. Tech in Power Plant Engineering and Energy Management (Pursuing)
Aug 2013 - Aug 2015
Turbomachinery Institute of Technology & Science, Patancheru, Medak
(JNTU HYD)
2. B. Tech in Electrical and Electronics Engineering June
2010 - July 2013
Aurora's Engineering College, Bhongir; Nalgonda (JNTU HYD)
3. Diploma in Electrical and Electronics Engineering July
2006 - May 2009
Govt. Polytechnic, Bellampally, Adilabad (SBTET, AP)
4. SSC Secondary School Education May 2006
Kakathiya High School, Kalvasrirampur, Karimnagar (Board of SSC, AP)
PERSONAL PROFILE:
Name : MITTAPALLI SAI KIRAN
Father's Name : Venkanna
Date of Birth : 7th July 1991
Sex : Male
Marital Status : Unmarried
Religion : Hindu
Nationality : Indian
Mother Tongue : Telugu
Languages Known : English, Telugu, and Hindi.
Contact : 099********
Email : ***.********@*****.***
DECLARATION:
I hereby declare that the above-mentioned information is correct up to
my knowledge and my self only bear the responsibility for the correctness
of the above-mentioned particular.
Date:
Place: (MITTAPALLI
SAIKIRAN)